Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria, 53321-53322 [2018-22985]
Download as PDF
Federal Register / Vol. 83, No. 204 / Monday, October 22, 2018 / Notices
Section IV, and as summarized in Enclosure
2 to SECY–18–0062, are authorized by law,
will not present an undue risk to the public
health and safety, and are consistent with the
common defense and security. Also, special
circumstances are present. Therefore, the
Commission hereby grants Exelon’s
exemptions from certain EP requirements in
10 CFR 50.47(b), 10 CFR 50.47(c)(2), and 10
CFR Part 50, Appendix E, Section IV, as
discussed and evaluated in detail in the NRC
staff’s safety evaluation associated with this
exemption. The exemptions are effective as
of 12 months (365 days) after permanent
cessation of power operations.
Dated at Rockville, Maryland, this 16th day
of October 2018.
For the Nuclear Regulatory Commission.
/RA/
Kathryn M. Brock,
Deputy Director, Division of Operating
Reactor Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2018–22986 Filed 10–19–18; 8:45 am]
BILLING CODE 7590–01–P
in the FOR FURTHER INFORMATION
CONTACT section of this document.
II. NRC Staff Determination of
Completion of ITAAC
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced in this
document (if that document is available
in ADAMS) is provided the first time
that a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
The NRC staff has determined that the
specified inspections, tests, and
analyses have been successfully
completed, and that the specified
acceptance criteria are met. The
documentation of the NRC staff’s
determination is in the ITAAC Closure
Verification Evaluation Form (VEF) for
each ITAAC. The VEF is a form that
represents the NRC staff’s structured
process for reviewing ICNs. Each ICN
presents a narrative description of how
the ITAAC was completed. The NRC’s
ICN review process involves a
determination on whether, among other
things: (1) Each ICN provides sufficient
information, including a summary of the
methodology used to perform the
ITAAC, to demonstrate that the
inspections, tests, and analyses have
been successfully completed; (2) each
ICN provides sufficient information to
demonstrate that the acceptance criteria
of the ITAAC are met; and (3) any NRC
inspections for the ITAAC have been
completed and any ITAAC findings
associated with that ITAAC have been
closed.
The NRC staff’s determination of the
successful completion of these ITAAC is
based on information available at this
time and is subject to the licensee’s
ability to maintain the condition that
the acceptance criteria are met. If the
staff receives new information that
suggests the staff’s determination on any
of these ITAAC is incorrect, then the
staff will determine whether to reopen
that ITAAC (including withdrawing the
staff’s determination on that ITAAC).
The NRC staff’s determination will be
used to support a subsequent finding,
pursuant to 10 CFR 52.103(g), at the end
of construction that all acceptance
criteria in the combined license are met.
The ITAAC closure process is not
finalized for these ITAAC until the NRC
makes an affirmative finding under 10
CFR 52.103(g). Any future updates to
the status of these ITAAC will be
reflected on the NRC’s website at https://
www.nrc.gov/reactors/new-reactors/
oversight/itaac.html.
This notice fulfills the staff’s
obligations under 10 CFR 52.99(e)(1) to
publish a notice in the Federal Register
of the NRC staff’s determination of the
successful completion of inspections,
tests, and analyses.
FOR FURTHER INFORMATION CONTACT:
Chandu Patel, Office of New Reactors,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–3025; email: Chandu.Patel@
nrc.gov.
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company,
Inc.; Vogtle Electric Generating Plant,
Units 3 and 4; Inspections, Tests,
Analyses, and Acceptance Criteria
Nuclear Regulatory
Commission.
ACTION: Determination of the successful
completion of inspections, tests, and
analyses.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) staff has determined
that the inspections, tests, and analyses
have been successfully completed, and
that the specified acceptance criteria are
met for the Vogtle Electric Generating
Plant (VEGP), Units 3 and 4.
DATES: The determination of the
successful completion of inspections,
tests, and analyses for VEGP Units 3 and
4 is effective October 22, 2018.
ADDRESSES: Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions regarding Docket IDs in
Regulations.gov to Jennifer Borges;
telephone: 301–287–9127; email:
Jennifer.Borges@nrc.gov. For technical
questions, contact the individual listed
daltland on DSKBBV9HB2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
18:12 Oct 19, 2018
Jkt 247001
53321
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion
of ITAAC
Southern Nuclear Operating
Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power
Corporation, MEAG Power SPVM, LLC.,
MEAG Power SPVJ, LLC., MEAG Power
SPVP, LLC., and the City of Dalton,
Georgia, (hereafter called the licensee)
have submitted Inspections, Tests,
Analyses, and Acceptance Criteria
(ITAAC) closure notifications (ICNs)
under paragraph 52.99(c)(1) of title 10 of
the Code of Federal Regulations (10
CFR), informing the NRC that the
licensee has successfully performed the
required inspections, tests, and
analyses, and that the acceptance
criteria are met for:
VEGP Unit 3 ITAAC: 2.2.03.08b.02
(176), 2.2.03.08c.iv.04 (186),
2.2.05.07a.ii (266), 2.3.05.03a.i (343),
2.3.09.03.iii (425), 3.2.00.01c.ii (742),
and 3.2.00.01d (743).
VEGP Unit 4 ITAAC: 2.2.05.07a.ii
(266), 3.2.00.01c.ii (742), and 3.2.00.01d
(743).
The ITAAC for VEGP Unit 3 are in
Appendix C of the VEGP Unit 3
combined license (ADAMS Accession
No. ML14100A106). The ITAAC for
VEGP Unit 4 are in Appendix C of VEGP
Unit 4 combined license (ADAMS
Accession No. ML14100A135).
PO 00000
Frm 00116
Fmt 4703
Sfmt 4703
Vogtle Electric Generating Plant Unit 3,
Docket No. 5200025
A complete list of the review status
for VEGP Unit 3 ITAAC, including the
submission date and ADAMS Accession
Number for each ICN received, the
E:\FR\FM\22OCN1.SGM
22OCN1
53322
Federal Register / Vol. 83, No. 204 / Monday, October 22, 2018 / Notices
ADAMS Accession Number for each
VEF, and the ADAMS Accession
Numbers for the inspection reports
associated with these specific ITAAC,
can be found on the NRC’s website at
https://www.nrc.gov/reactors/newreactors/new-licensing-files/vog3icnsr.pdf.
For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of
Licensing, Siting, and Environmental
Analysis, Office of New Reactors.
Vogtle Electric Generating Plant Unit 4,
Docket No. 5200026
OFFICE OF PERSONNEL
MANAGEMENT
A complete list of the review status
for VEGP Unit 4 ITAAC, including the
submission date and ADAMS Accession
Number for each ICN received, the
ADAMS Accession Number for each
VEF, and the ADAMS Accession
Numbers for the inspection reports
associated with these specific ITAAC,
can be found on the NRC’s website at
https://www.nrc.gov/reactors/newreactors/new-licensing-files/vog4icnsr.pdf.
Excepted Service
[FR Doc. 2018–22985 Filed 10–19–18; 8:45 am]
BILLING CODE 7590–01–P
Dated at Rockville, Maryland, this 17th day
of October, 2018.
Agency name
DEPARTMENT
CULTURE.
OF
AGRI-
APPALACHIAN REGIONAL COMMISSION.
DEPARTMENT OF COMMERCE ..
DEPARTMENT OF DEFENSE .......
DEPARTMENT OF THE ARMY .....
daltland on DSKBBV9HB2PROD with NOTICES
DEPARTMENT OF EDUCATION ..
DEPARTMENT OF ENERGY ........
ENVIRONMENTAL PROTECTION
AGENCY.
FEDERAL TRADE COMMISSION
VerDate Sep<11>2014
18:12 Oct 19, 2018
U.S. Office of Personnel
Management (OPM).
ACTION: Notice.
AGENCY:
This notice identifies
Schedule A, B, and C appointing
authorities applicable to a single agency
that were established or revoked from
May 1, 2018 to May 31, 2018.
FOR FURTHER INFORMATION CONTACT:
Senior Executive Resources Services,
Senior Executive Services and
Performance Management, Employee
Services, Julia Alford, 202–606–2246,
SERS@opm.gov.
SUPPLEMENTARY INFORMATION: In
accordance with 5 CFR 213.103,
SUMMARY:
Schedule A, B, and C appointing
authorities available for use by all
agencies are codified in the Code of
Federal Regulations (CFR). Schedule A,
B, and C appointing authorities
applicable to a single agency are not
codified in the CFR, but the Office of
Personnel Management (OPM)
publishes a notice of agency-specific
authorities established or revoked each
month in the Federal Register at
www.gpo.gov/fdsys/. OPM also
publishes an annual notice of the
consolidated listing of all Schedule A,
B, and C appointing authorities, current
as of June 30, in the Federal Register.
Schedule A
No Schedule A Authorities to report
during May 2018.
Schedule B
No Schedule B Authorities to report
during May 2018.
Schedule C
The following Schedule C appointing
authorities were approved during May
2018.
Authorization
number
Organization name
Position title
Office of the Assistant Secretary
for Congressional Relations.
Office of the Secretary ...................
Office of the Under Secretary for
Farm Production and Conservation.
Office of the Under Secretary for
Food Safety.
Office of Under Secretary for Natural Resources and Environment.
Rural Housing Service ...................
Director, Intergovernmental Affairs
DA180174
05/08/2018
Director of Policy Coordination ......
Staff Assistant ................................
DA180158
DA180181
05/08/2018
05/16/2018
Confidential Assistant ....................
DA180148
05/24/2018
Staff Assistant ................................
DA180169
05/24/2018
State Director .................................
State Director—Louisiana ..............
Strategic Program Advisor .............
Program Analyst ............................
DA180146
DA180126
DA180185
AP180001
05/16/2018
05/30/2018
05/08/2018
05/25/2018
Special Advisor ..............................
DC180123
05/08/2018
Special Assistant ............................
Special Assistant (Logistics and
Materiel Readiness).
DC180142
DD180086
05/25/2018
05/08/2018
Special Assistant (Strategy and
Acquisition Reform).
Special Assistant (Civil Works) ......
Special Assistant(Manpower and
Reserve Affairs).
Confidential Assistant ....................
DW180031
05/16/2018
DW180032
DW180033
05/24/2018
05/16/2018
DB180046
05/24/2018
Special Assistant ............................
Executive Support Specialist .........
DE180077
DE180090
05/16/2018
05/17/2018
Senior Advisor ................................
DE180105
05/23/2018
Senior Advisor ................................
EP180061
05/10/2018
Economist ......................................
FT180004
05/02/2018
Appalachian Regional Commission
Office of the Deputy Assistant Secretary.
International Trade Administration
Office of the Under Secretary of
Defense
(Acquisition,
Technology, and Logistics).
Office Assistant Secretary Army
(Civil Works).
Office Assistant Secretary Army
(Manpower and Reserve Affairs).
Office of Communications and
Outreach.
Office of Public Affairs ...................
Advanced
Research
Projects
Agency—Energy.
Assistant Secretary for Environmental Management.
Region 9—San Francisco, California.
Office of the Chairman ...................
Jkt 247001
PO 00000
Frm 00117
Fmt 4703
Sfmt 4703
E:\FR\FM\22OCN1.SGM
22OCN1
Effective date
Agencies
[Federal Register Volume 83, Number 204 (Monday, October 22, 2018)]
[Notices]
[Pages 53321-53322]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-22985]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc.; Vogtle Electric
Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and
Acceptance Criteria
AGENCY: Nuclear Regulatory Commission.
ACTION: Determination of the successful completion of inspections,
tests, and analyses.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
determined that the inspections, tests, and analyses have been
successfully completed, and that the specified acceptance criteria are
met for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.
DATES: The determination of the successful completion of inspections,
tests, and analyses for VEGP Units 3 and 4 is effective October 22,
2018.
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions regarding Docket IDs in Regulations.gov to Jennifer Borges;
telephone: 301-287-9127; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced in this document (if that document is available in
ADAMS) is provided the first time that a document is referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-3025; email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion of ITAAC
Southern Nuclear Operating Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC., MEAG
Power SPVJ, LLC., MEAG Power SPVP, LLC., and the City of Dalton,
Georgia, (hereafter called the licensee) have submitted Inspections,
Tests, Analyses, and Acceptance Criteria (ITAAC) closure notifications
(ICNs) under paragraph 52.99(c)(1) of title 10 of the Code of Federal
Regulations (10 CFR), informing the NRC that the licensee has
successfully performed the required inspections, tests, and analyses,
and that the acceptance criteria are met for:
VEGP Unit 3 ITAAC: 2.2.03.08b.02 (176), 2.2.03.08c.iv.04 (186),
2.2.05.07a.ii (266), 2.3.05.03a.i (343), 2.3.09.03.iii (425),
3.2.00.01c.ii (742), and 3.2.00.01d (743).
VEGP Unit 4 ITAAC: 2.2.05.07a.ii (266), 3.2.00.01c.ii (742), and
3.2.00.01d (743).
The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP
Unit 4 are in Appendix C of VEGP Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. NRC Staff Determination of Completion of ITAAC
The NRC staff has determined that the specified inspections, tests,
and analyses have been successfully completed, and that the specified
acceptance criteria are met. The documentation of the NRC staff's
determination is in the ITAAC Closure Verification Evaluation Form
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's
structured process for reviewing ICNs. Each ICN presents a narrative
description of how the ITAAC was completed. The NRC's ICN review
process involves a determination on whether, among other things: (1)
Each ICN provides sufficient information, including a summary of the
methodology used to perform the ITAAC, to demonstrate that the
inspections, tests, and analyses have been successfully completed; (2)
each ICN provides sufficient information to demonstrate that the
acceptance criteria of the ITAAC are met; and (3) any NRC inspections
for the ITAAC have been completed and any ITAAC findings associated
with that ITAAC have been closed.
The NRC staff's determination of the successful completion of these
ITAAC is based on information available at this time and is subject to
the licensee's ability to maintain the condition that the acceptance
criteria are met. If the staff receives new information that suggests
the staff's determination on any of these ITAAC is incorrect, then the
staff will determine whether to reopen that ITAAC (including
withdrawing the staff's determination on that ITAAC). The NRC staff's
determination will be used to support a subsequent finding, pursuant to
10 CFR 52.103(g), at the end of construction that all acceptance
criteria in the combined license are met. The ITAAC closure process is
not finalized for these ITAAC until the NRC makes an affirmative
finding under 10 CFR 52.103(g). Any future updates to the status of
these ITAAC will be reflected on the NRC's website at https://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
This notice fulfills the staff's obligations under 10 CFR
52.99(e)(1) to publish a notice in the Federal Register of the NRC
staff's determination of the successful completion of inspections,
tests, and analyses.
Vogtle Electric Generating Plant Unit 3, Docket No. 5200025
A complete list of the review status for VEGP Unit 3 ITAAC,
including the submission date and ADAMS Accession Number for each ICN
received, the
[[Page 53322]]
ADAMS Accession Number for each VEF, and the ADAMS Accession Numbers
for the inspection reports associated with these specific ITAAC, can be
found on the NRC's website at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog3-icnsr.pdf.
Vogtle Electric Generating Plant Unit 4, Docket No. 5200026
A complete list of the review status for VEGP Unit 4 ITAAC,
including the submission date and ADAMS Accession Number for each ICN
received, the ADAMS Accession Number for each VEF, and the ADAMS
Accession Numbers for the inspection reports associated with these
specific ITAAC, can be found on the NRC's website at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog4-icnsr.pdf.
Dated at Rockville, Maryland, this 17th day of October, 2018.
For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of Licensing, Siting, and
Environmental Analysis, Office of New Reactors.
[FR Doc. 2018-22985 Filed 10-19-18; 8:45 am]
BILLING CODE 7590-01-P