Winter 2018-2019 Operations and Market Performance in Regional Transmission Organizations and Independent System Operators; Supplemental Notice of Technical Conference, 53237 [2018-22950]
Download as PDF
Federal Register / Vol. 83, No. 204 / Monday, October 22, 2018 / Notices
items should contact Menice
Santistevan at the address or telephone
number listed above. Requests must be
received five days prior to the meeting
and reasonable provision will be made
to include the presentation in the
agenda. The Deputy Designated Federal
Officer is empowered to conduct the
meeting in a fashion that will facilitate
the orderly conduct of business.
Individuals wishing to make public
comments will be provided a maximum
of five minutes to present their
comments.
Minutes: Minutes will be available by
writing or calling Menice Santistevan at
the address or phone number listed
above. Minutes and other Board
documents are on the internet at:
https://energy.gov/em/nnmcab/meetingmaterials.
Signed in Washington, DC, on October 16,
2018.
Latanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2018–22877 Filed 10–19–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD16–24–000]
daltland on DSKBBV9HB2PROD with NOTICES
Winter 2018–2019 Operations and
Market Performance in Regional
Transmission Organizations and
Independent System Operators;
Supplemental Notice of Technical
Conference
As announced in a Notice of
Technical Conference issued on
September 10, 2018, Federal Energy
Regulatory Commission (Commission)
staff will hold a technical conference,
after the October 2018 Commission
public meeting, to hear from the
Regional Transmission Organizations
(RTOs) and Independent System
Operators (ISOs) 1 on their efforts for
ensuring reliable and economic system
performance during the 2018–2019
winter season. The technical conference
will take place on October 18, 2018 at
the Commission’s offices at 888 First
Street NE, Washington, DC beginning at
2:00 p.m. and ending at 3:30 p.m.
(Eastern Time). Commission staff will
lead the technical conference, and the
1 The technical conference will include
representatives from California Independent System
Operator Corporation, ISO New England Inc.,
Midcontinent Independent System Operator, Inc.,
New York Independent System Operator, Inc., PJM
Interconnection, L.L.C., and Southwest Power Pool,
Inc.
VerDate Sep<11>2014
18:12 Oct 19, 2018
Jkt 247001
Chairman and Commissioners may
attend.
The agenda for this technical
conference is attached.
All interested persons may attend the
conference, and registration is not
required. However, in-person attendees
are encouraged to register on-line at:
https://www.ferc.gov/whats-new/
registration/10-18-18-form.asp. Inperson attendees should allow time to
pass through building security
procedures before the 2:00 p.m. start
time of the technical conference.
This technical conference will be
transcribed and webcast. Transcripts
will be available immediately for a fee
from Ace Reporting (202–347–3700). A
link to the webcast of this event will be
available in the Commission Calendar of
Events at www.ferc.gov. The Capitol
Connection provides technical support
for the webcasts and offers the option of
listening to the conference via phonebridge for a fee. For additional
information, visit
www.CapitolConnection.org or call 703–
993–3100.
While this conference is not for the
purpose of discussing specific cases, it
may address matters at issue in the
following Commission proceedings that
are pending:
• ISO New England Inc.: ISO New
England Inc., Docket No. ER17–795–000
and ER17–795–001; ISO New England
Inc., Docket No. ER18–1509–000; ISO
New England Inc., Docket No. EL18–
182–000; ISO New England Inc., Docket
No. ER18–1639–000; ISO New England
Inc., Docket No. ER18–1639–001; ISO
New England Inc., Docket No. ER18–
2364–000; ISO New England Inc.,
Docket No. ER18–619–000; ISO New
England Inc., Docket No. ER18–619–
001; ISO New England Inc., Docket No.
ER13–2266–000, et al.
• New York Independent System
Operator, Inc.: N.Y. Indep. Sys.
Operator, Inc., Docket No. ER16–120–
007.
• PJM Interconnection, L.L.C.: Energy
Storage Association v. PJM
Interconnection, L.L.C., Docket No.
EL17–64–000; Renewable Energy
Systems Americas v. PJM
Interconnection, L.L.C., Docket No.
EL17–65–000; PJM Interconnection,
L.L.C., Docket No. ER16–372–000, et al.;
Independent Market Monitor for PJM v.
American Electric Power Corp., Docket
No. EL17–22–000, et al.; PJM
Interconnection, L.L.C., Docket No.
ER18–87–000, et al.; PJM
Interconnection, L.L.C., Docket No.
EL18–34–000; ER18–1314–000, et al.;
Calpine Corporation et. al. v. PJM
Interconnection, L.L.C., Docket No.
EL16–49–000, et. al.; PJM
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
53237
Interconnection, L.L.C., Docket No.
EL18–178–000, et al.; CPV Power
Holdings, L.P., et. al. v. PJM
Interconnection, L.L.C., Docket No.
EL18–169–000; PJM Interconnection,
L.L.C., Docket No. ER18–988–000, et.
al.; PJM Interconnection, L.L.C., Docket
No. EL14–48–000, et. al.
• California Independent System
Operator Corp.: CXA La Paloma, LLC v.
Cal. Indep. Sys. Operator Corp., Docket
No. EL18–177–000; Cal. Indep. Sys.
Operator Corp., Docket No. ER18–2369–
000; Cal. Indep. Sys. Operator Corp.,
Docket No. ER18–2520–000.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations please
send an email to accessibility@ferc.gov
or call toll free (866) 208–3372 (voice)
or (202) 502–8659 (TTY), or send a fax
to (202) 208–2106 with the requested
accommodations.
For more information about this
technical conference, please contact
David Rosner at 202–502–8479,
david.rosner@ferc.gov, or Samin Peirovi
at 202–502–8080, samin.peirovi@
ferc.gov. For information related to
logistics, please contact Sarah McKinley
at 202–502–8368, sarah.mckinley@
ferc.gov.
Dated: October 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–22950 Filed 10–19–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1121–127]
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Recreation
Plan Amendment.
b. Project No: 1121–127.
c. Date Filed: September 14, 2018.
d. Applicant: Pacific Gas and Electric
Company.
e. Name of Project: Battle Creek
Hydroelectric Project.
f. Location: The project is located on
the mainstem Battle Creek, North Fork
Battle Creek, and South Fork Battle
Creek, in Shasta and Tehama counties,
California.
E:\FR\FM\22OCN1.SGM
22OCN1
Agencies
[Federal Register Volume 83, Number 204 (Monday, October 22, 2018)]
[Notices]
[Page 53237]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-22950]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD16-24-000]
Winter 2018-2019 Operations and Market Performance in Regional
Transmission Organizations and Independent System Operators;
Supplemental Notice of Technical Conference
As announced in a Notice of Technical Conference issued on
September 10, 2018, Federal Energy Regulatory Commission (Commission)
staff will hold a technical conference, after the October 2018
Commission public meeting, to hear from the Regional Transmission
Organizations (RTOs) and Independent System Operators (ISOs) \1\ on
their efforts for ensuring reliable and economic system performance
during the 2018-2019 winter season. The technical conference will take
place on October 18, 2018 at the Commission's offices at 888 First
Street NE, Washington, DC beginning at 2:00 p.m. and ending at 3:30
p.m. (Eastern Time). Commission staff will lead the technical
conference, and the Chairman and Commissioners may attend.
---------------------------------------------------------------------------
\1\ The technical conference will include representatives from
California Independent System Operator Corporation, ISO New England
Inc., Midcontinent Independent System Operator, Inc., New York
Independent System Operator, Inc., PJM Interconnection, L.L.C., and
Southwest Power Pool, Inc.
---------------------------------------------------------------------------
The agenda for this technical conference is attached.
All interested persons may attend the conference, and registration
is not required. However, in-person attendees are encouraged to
register on-line at: https://www.ferc.gov/whats-new/registration/10-18-18-form.asp. In-person attendees should allow time to pass through
building security procedures before the 2:00 p.m. start time of the
technical conference.
This technical conference will be transcribed and webcast.
Transcripts will be available immediately for a fee from Ace Reporting
(202-347-3700). A link to the webcast of this event will be available
in the Commission Calendar of Events at www.ferc.gov. The Capitol
Connection provides technical support for the webcasts and offers the
option of listening to the conference via phone-bridge for a fee. For
additional information, visit www.CapitolConnection.org or call 703-
993-3100.
While this conference is not for the purpose of discussing specific
cases, it may address matters at issue in the following Commission
proceedings that are pending:
ISO New England Inc.: ISO New England Inc., Docket No.
ER17-795-000 and ER17-795-001; ISO New England Inc., Docket No. ER18-
1509-000; ISO New England Inc., Docket No. EL18-182-000; ISO New
England Inc., Docket No. ER18-1639-000; ISO New England Inc., Docket
No. ER18-1639-001; ISO New England Inc., Docket No. ER18-2364-000; ISO
New England Inc., Docket No. ER18-619-000; ISO New England Inc., Docket
No. ER18-619-001; ISO New England Inc., Docket No. ER13-2266-000, et
al.
New York Independent System Operator, Inc.: N.Y. Indep.
Sys. Operator, Inc., Docket No. ER16-120-007.
PJM Interconnection, L.L.C.: Energy Storage Association v.
PJM Interconnection, L.L.C., Docket No. EL17-64-000; Renewable Energy
Systems Americas v. PJM Interconnection, L.L.C., Docket No. EL17-65-
000; PJM Interconnection, L.L.C., Docket No. ER16-372-000, et al.;
Independent Market Monitor for PJM v. American Electric Power Corp.,
Docket No. EL17-22-000, et al.; PJM Interconnection, L.L.C., Docket No.
ER18-87-000, et al.; PJM Interconnection, L.L.C., Docket No. EL18-34-
000; ER18-1314-000, et al.; Calpine Corporation et. al. v. PJM
Interconnection, L.L.C., Docket No. EL16-49-000, et. al.; PJM
Interconnection, L.L.C., Docket No. EL18-178-000, et al.; CPV Power
Holdings, L.P., et. al. v. PJM Interconnection, L.L.C., Docket No.
EL18-169-000; PJM Interconnection, L.L.C., Docket No. ER18-988-000, et.
al.; PJM Interconnection, L.L.C., Docket No. EL14-48-000, et. al.
California Independent System Operator Corp.: CXA La
Paloma, LLC v. Cal. Indep. Sys. Operator Corp., Docket No. EL18-177-
000; Cal. Indep. Sys. Operator Corp., Docket No. ER18-2369-000; Cal.
Indep. Sys. Operator Corp., Docket No. ER18-2520-000.
Commission conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations please
send an email to [email protected] or call toll free (866) 208-
3372 (voice) or (202) 502-8659 (TTY), or send a fax to (202) 208-2106
with the requested accommodations.
For more information about this technical conference, please
contact David Rosner at 202-502-8479, [email protected], or Samin
Peirovi at 202-502-8080, [email protected]. For information
related to logistics, please contact Sarah McKinley at 202-502-8368,
[email protected].
Dated: October 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-22950 Filed 10-19-18; 8:45 am]
BILLING CODE 6717-01-P