Winter 2018-2019 Operations and Market Performance in Regional Transmission Organizations and Independent System Operators; Supplemental Notice of Technical Conference, 53237 [2018-22950]

Download as PDF Federal Register / Vol. 83, No. 204 / Monday, October 22, 2018 / Notices items should contact Menice Santistevan at the address or telephone number listed above. Requests must be received five days prior to the meeting and reasonable provision will be made to include the presentation in the agenda. The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Individuals wishing to make public comments will be provided a maximum of five minutes to present their comments. Minutes: Minutes will be available by writing or calling Menice Santistevan at the address or phone number listed above. Minutes and other Board documents are on the internet at: https://energy.gov/em/nnmcab/meetingmaterials. Signed in Washington, DC, on October 16, 2018. Latanya Butler, Deputy Committee Management Officer. [FR Doc. 2018–22877 Filed 10–19–18; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD16–24–000] daltland on DSKBBV9HB2PROD with NOTICES Winter 2018–2019 Operations and Market Performance in Regional Transmission Organizations and Independent System Operators; Supplemental Notice of Technical Conference As announced in a Notice of Technical Conference issued on September 10, 2018, Federal Energy Regulatory Commission (Commission) staff will hold a technical conference, after the October 2018 Commission public meeting, to hear from the Regional Transmission Organizations (RTOs) and Independent System Operators (ISOs) 1 on their efforts for ensuring reliable and economic system performance during the 2018–2019 winter season. The technical conference will take place on October 18, 2018 at the Commission’s offices at 888 First Street NE, Washington, DC beginning at 2:00 p.m. and ending at 3:30 p.m. (Eastern Time). Commission staff will lead the technical conference, and the 1 The technical conference will include representatives from California Independent System Operator Corporation, ISO New England Inc., Midcontinent Independent System Operator, Inc., New York Independent System Operator, Inc., PJM Interconnection, L.L.C., and Southwest Power Pool, Inc. VerDate Sep<11>2014 18:12 Oct 19, 2018 Jkt 247001 Chairman and Commissioners may attend. The agenda for this technical conference is attached. All interested persons may attend the conference, and registration is not required. However, in-person attendees are encouraged to register on-line at: https://www.ferc.gov/whats-new/ registration/10-18-18-form.asp. Inperson attendees should allow time to pass through building security procedures before the 2:00 p.m. start time of the technical conference. This technical conference will be transcribed and webcast. Transcripts will be available immediately for a fee from Ace Reporting (202–347–3700). A link to the webcast of this event will be available in the Commission Calendar of Events at www.ferc.gov. The Capitol Connection provides technical support for the webcasts and offers the option of listening to the conference via phonebridge for a fee. For additional information, visit www.CapitolConnection.org or call 703– 993–3100. While this conference is not for the purpose of discussing specific cases, it may address matters at issue in the following Commission proceedings that are pending: • ISO New England Inc.: ISO New England Inc., Docket No. ER17–795–000 and ER17–795–001; ISO New England Inc., Docket No. ER18–1509–000; ISO New England Inc., Docket No. EL18– 182–000; ISO New England Inc., Docket No. ER18–1639–000; ISO New England Inc., Docket No. ER18–1639–001; ISO New England Inc., Docket No. ER18– 2364–000; ISO New England Inc., Docket No. ER18–619–000; ISO New England Inc., Docket No. ER18–619– 001; ISO New England Inc., Docket No. ER13–2266–000, et al. • New York Independent System Operator, Inc.: N.Y. Indep. Sys. Operator, Inc., Docket No. ER16–120– 007. • PJM Interconnection, L.L.C.: Energy Storage Association v. PJM Interconnection, L.L.C., Docket No. EL17–64–000; Renewable Energy Systems Americas v. PJM Interconnection, L.L.C., Docket No. EL17–65–000; PJM Interconnection, L.L.C., Docket No. ER16–372–000, et al.; Independent Market Monitor for PJM v. American Electric Power Corp., Docket No. EL17–22–000, et al.; PJM Interconnection, L.L.C., Docket No. ER18–87–000, et al.; PJM Interconnection, L.L.C., Docket No. EL18–34–000; ER18–1314–000, et al.; Calpine Corporation et. al. v. PJM Interconnection, L.L.C., Docket No. EL16–49–000, et. al.; PJM PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 53237 Interconnection, L.L.C., Docket No. EL18–178–000, et al.; CPV Power Holdings, L.P., et. al. v. PJM Interconnection, L.L.C., Docket No. EL18–169–000; PJM Interconnection, L.L.C., Docket No. ER18–988–000, et. al.; PJM Interconnection, L.L.C., Docket No. EL14–48–000, et. al. • California Independent System Operator Corp.: CXA La Paloma, LLC v. Cal. Indep. Sys. Operator Corp., Docket No. EL18–177–000; Cal. Indep. Sys. Operator Corp., Docket No. ER18–2369– 000; Cal. Indep. Sys. Operator Corp., Docket No. ER18–2520–000. Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an email to accessibility@ferc.gov or call toll free (866) 208–3372 (voice) or (202) 502–8659 (TTY), or send a fax to (202) 208–2106 with the requested accommodations. For more information about this technical conference, please contact David Rosner at 202–502–8479, david.rosner@ferc.gov, or Samin Peirovi at 202–502–8080, samin.peirovi@ ferc.gov. For information related to logistics, please contact Sarah McKinley at 202–502–8368, sarah.mckinley@ ferc.gov. Dated: October 16, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–22950 Filed 10–19–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1121–127] Pacific Gas and Electric Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Recreation Plan Amendment. b. Project No: 1121–127. c. Date Filed: September 14, 2018. d. Applicant: Pacific Gas and Electric Company. e. Name of Project: Battle Creek Hydroelectric Project. f. Location: The project is located on the mainstem Battle Creek, North Fork Battle Creek, and South Fork Battle Creek, in Shasta and Tehama counties, California. E:\FR\FM\22OCN1.SGM 22OCN1

Agencies

[Federal Register Volume 83, Number 204 (Monday, October 22, 2018)]
[Notices]
[Page 53237]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-22950]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. AD16-24-000]


Winter 2018-2019 Operations and Market Performance in Regional 
Transmission Organizations and Independent System Operators; 
Supplemental Notice of Technical Conference

    As announced in a Notice of Technical Conference issued on 
September 10, 2018, Federal Energy Regulatory Commission (Commission) 
staff will hold a technical conference, after the October 2018 
Commission public meeting, to hear from the Regional Transmission 
Organizations (RTOs) and Independent System Operators (ISOs) \1\ on 
their efforts for ensuring reliable and economic system performance 
during the 2018-2019 winter season. The technical conference will take 
place on October 18, 2018 at the Commission's offices at 888 First 
Street NE, Washington, DC beginning at 2:00 p.m. and ending at 3:30 
p.m. (Eastern Time). Commission staff will lead the technical 
conference, and the Chairman and Commissioners may attend.
---------------------------------------------------------------------------

    \1\ The technical conference will include representatives from 
California Independent System Operator Corporation, ISO New England 
Inc., Midcontinent Independent System Operator, Inc., New York 
Independent System Operator, Inc., PJM Interconnection, L.L.C., and 
Southwest Power Pool, Inc.
---------------------------------------------------------------------------

    The agenda for this technical conference is attached.
    All interested persons may attend the conference, and registration 
is not required. However, in-person attendees are encouraged to 
register on-line at: https://www.ferc.gov/whats-new/registration/10-18-18-form.asp. In-person attendees should allow time to pass through 
building security procedures before the 2:00 p.m. start time of the 
technical conference.
    This technical conference will be transcribed and webcast. 
Transcripts will be available immediately for a fee from Ace Reporting 
(202-347-3700). A link to the webcast of this event will be available 
in the Commission Calendar of Events at www.ferc.gov. The Capitol 
Connection provides technical support for the webcasts and offers the 
option of listening to the conference via phone-bridge for a fee. For 
additional information, visit www.CapitolConnection.org or call 703-
993-3100.
    While this conference is not for the purpose of discussing specific 
cases, it may address matters at issue in the following Commission 
proceedings that are pending:
     ISO New England Inc.: ISO New England Inc., Docket No. 
ER17-795-000 and ER17-795-001; ISO New England Inc., Docket No. ER18-
1509-000; ISO New England Inc., Docket No. EL18-182-000; ISO New 
England Inc., Docket No. ER18-1639-000; ISO New England Inc., Docket 
No. ER18-1639-001; ISO New England Inc., Docket No. ER18-2364-000; ISO 
New England Inc., Docket No. ER18-619-000; ISO New England Inc., Docket 
No. ER18-619-001; ISO New England Inc., Docket No. ER13-2266-000, et 
al.
     New York Independent System Operator, Inc.: N.Y. Indep. 
Sys. Operator, Inc., Docket No. ER16-120-007.
     PJM Interconnection, L.L.C.: Energy Storage Association v. 
PJM Interconnection, L.L.C., Docket No. EL17-64-000; Renewable Energy 
Systems Americas v. PJM Interconnection, L.L.C., Docket No. EL17-65-
000; PJM Interconnection, L.L.C., Docket No. ER16-372-000, et al.; 
Independent Market Monitor for PJM v. American Electric Power Corp., 
Docket No. EL17-22-000, et al.; PJM Interconnection, L.L.C., Docket No. 
ER18-87-000, et al.; PJM Interconnection, L.L.C., Docket No. EL18-34-
000; ER18-1314-000, et al.; Calpine Corporation et. al. v. PJM 
Interconnection, L.L.C., Docket No. EL16-49-000, et. al.; PJM 
Interconnection, L.L.C., Docket No. EL18-178-000, et al.; CPV Power 
Holdings, L.P., et. al. v. PJM Interconnection, L.L.C., Docket No. 
EL18-169-000; PJM Interconnection, L.L.C., Docket No. ER18-988-000, et. 
al.; PJM Interconnection, L.L.C., Docket No. EL14-48-000, et. al.
     California Independent System Operator Corp.: CXA La 
Paloma, LLC v. Cal. Indep. Sys. Operator Corp., Docket No. EL18-177-
000; Cal. Indep. Sys. Operator Corp., Docket No. ER18-2369-000; Cal. 
Indep. Sys. Operator Corp., Docket No. ER18-2520-000.
    Commission conferences are accessible under section 508 of the 
Rehabilitation Act of 1973. For accessibility accommodations please 
send an email to [email protected] or call toll free (866) 208-
3372 (voice) or (202) 502-8659 (TTY), or send a fax to (202) 208-2106 
with the requested accommodations.
    For more information about this technical conference, please 
contact David Rosner at 202-502-8479, [email protected], or Samin 
Peirovi at 202-502-8080, [email protected]. For information 
related to logistics, please contact Sarah McKinley at 202-502-8368, 
[email protected].

    Dated: October 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-22950 Filed 10-19-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.