Notice of Complaint: Tipmont Rural Electric Member Cooperative v. Wabash Valley Power Authority, 50916-50917 [2018-21942]

Download as PDF 50916 Federal Register / Vol. 83, No. 196 / Wednesday, October 10, 2018 / Notices Dated: October 2, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. [FR Doc. 2018–21931 Filed 10–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: October 2, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [Docket No. ER19–9–000] amozie on DSK3GDR082PROD with NOTICES1 Mankato Energy Center II, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization [FR Doc. 2018–21937 Filed 10–9–18; 8:45 am] BILLING CODE 6717–01–P This is a supplemental notice in the above-referenced proceeding Mankato Energy Center II, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is October 22, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for VerDate Sep<11>2014 21:20 Oct 09, 2018 Jkt 247001 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 17, 2018. Dated: October 2, 2018. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FR Doc. 2018–21892 Filed 10–9–18; 8:45 am] [Docket Nos. EL18–206–000, QF16–557– 001] BILLING CODE 6717–01–P Red Lake Falls Community Hybrid, LLC; Notice of Petition for Enforcement DEPARTMENT OF ENERGY Take notice that on September 26, 2018, pursuant to section 210(h) of the Public Utility Regulatory Policies Act of 1978 (PURPA), Red Lake Falls Community Hybrid, LLC (Petitioner) filed a Petition for Enforcement, requesting that the Federal Energy Regulatory Commission (Commission) initiate an enforcement action against Minnesota Public Utilities Commission to remedy their alleged improper implementation of PURPA, all as more fully explained in their petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Petitioners. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. EL19–2–000] Notice of Complaint: Tipmont Rural Electric Member Cooperative v. Wabash Valley Power Authority Take notice that on October 1, 2018, pursuant to sections 206 and 306 of the Federal Power Act, 16 U.S.C. 824e and 825e and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Tipmont Rural Electric Member Cooperative (Complainant) filed a formal complaint against Wabash Valley Power Authority (Respondent) requesting that the Commission find that the Complainant may terminate services early under its wholesale requirements power sales agreements with the Respondent, subject to the Complaint paying any stranded cost that Respondent may incur as a result of such early termination, all as more fully explained in the complaint. The Complainant certifies that copies of the complaint were served on the contacts for Respondent, as listed on the Commission’s list of Corporate Officials, to the extent such officials remain at Wabash Valley. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will E:\FR\FM\10OCN1.SGM 10OCN1 Federal Register / Vol. 83, No. 196 / Wednesday, October 10, 2018 / Notices not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 22, 2018. Dated: October 3, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–21942 Filed 10–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: amozie on DSK3GDR082PROD with NOTICES1 Filings Instituting Proceedings Docket Numbers: RP18–369–002. Applicants: Sea Robin Pipeline Company, LLC. Description: Compliance filing Quality Compliance to be effective 8/1/ 2018. Filed Date: 10/2/18. Accession Number: 20181002–5033. Comments Due: 5 p.m. ET 10/15/18. Docket Numbers: RP19–27–000. Applicants: Texas Eastern Transmission, LP. VerDate Sep<11>2014 21:20 Oct 09, 2018 Jkt 247001 Description: § 4(d) Rate Filing: STEP Project Non-Conforming Interim Agreements to be effective 10/1/2018. Filed Date: 10/2/18. Accession Number: 20181002–5000. Comments Due: 5 p.m. ET 10/15/18. Docket Numbers: RP19–29–000. Applicants: Tennessee Gas Pipeline Company, L.L.C. Description: § 4(d) Rate Filing: Volume No. 2—Neg Rate Agmt— NextEra Energy Marketing, LLC SP338828 to be effective 10/1/2018. Filed Date: 10/2/18. Accession Number: 20181002–5042. Comments Due: 5 p.m. ET 10/15/18. Docket Numbers: RP19–31–000. Applicants: Dauphin Island Gathering Partners. Description: § 4(d) Rate Filing: Negotiated Rate Filing 10–2–2018 to be effective 11/1/2018. Filed Date: 10/2/18. Accession Number: 20181002–5088. Comments Due: 5 p.m. ET 10/15/18. Docket Numbers: RP19–32–000. Applicants: Dominion Energy Transmission, Inc. Description: § 4(d) Rate Filing: DETI— October 2, 2018 Nonconforming Service Agreements to be effective 11/1/2018. Filed Date: 10/2/18. Accession Number: 20181002–5110. Comments Due: 5 p.m. ET 10/15/18. Docket Numbers: RP19–33–000. Applicants: Caledonia Energy Partners, L.L.C. Description: § 4(d) Rate Filing: Updates to Caledonia Energy Partners, LLC FERC Gas Tariff to be effective 11/ 1/2018. Filed Date: 10/2/18. Accession Number: 20181002–5113. Comments Due: 5 p.m. ET 10/15/18. Docket Numbers: RP19–34–000. Applicants: Freebird Gas Storage, L.L.C. Description: § 4(d) Rate Filing: Updates to Freebird Gas Storage, LLC FERC Gas Tariff to be effective 11/1/ 2018. Filed Date: 10/2/18. Accession Number: 20181002–5114. Comments Due: 5 p.m. ET 10/15/18. Docket Numbers: RP19–35–000. Applicants: Cimarron River Pipeline, LLC. Description: § 4(d) Rate Filing: Negotiated Rates 2018–10–03 to be effective 10/3/2018. Filed Date: 10/2/18. Accession Number: 20181002–5158. Comments Due: 5 p.m. ET 10/15/18. Docket Numbers: RP19–36–000. Applicants: Dominion Energy Questar Pipeline, LLC. Description: § 4(d) Rate Filing: Statement of Negotiated Rates Version PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 50917 8.0.0—Highpoint Operating Corp. to be effective 10/2/2018. Filed Date: 10/2/18. Accession Number: 20181002–5173. Comments Due: 5 p.m. ET 10/15/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 3, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–21933 Filed 10–9–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP18–806–001. Applicants: ENGIE Gas & LNG LLC, Exelon Generation Company, LLC. Description: Joint Petition to Amend Temporary Waivers of Capacity Release Regulations and Policies, et al. Filed Date: 9/28/18. Accession Number: 20180928–5188. Comments Due: 5 p.m. ET 10/5/18. Docket Numbers: RP17–913–003. Applicants: Natural Gas Pipeline Company of America. Description: Compliance filing Filing Settlement Rates Phase II November 1 2018 to be effective 11/1/2018. Filed Date: 10/1/18. Accession Number: 20181001–5321. Comments Due: 5 p.m. ET 10/15/18. Docket Numbers: RP19–1–000. Applicants: DBM Pipeline, LLC. Description: Compliance filing Cost and Revenue Study under Docket No. CP15–104–000. E:\FR\FM\10OCN1.SGM 10OCN1

Agencies

[Federal Register Volume 83, Number 196 (Wednesday, October 10, 2018)]
[Notices]
[Pages 50916-50917]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-21942]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL19-2-000]


Notice of Complaint: Tipmont Rural Electric Member Cooperative v. 
Wabash Valley Power Authority

    Take notice that on October 1, 2018, pursuant to sections 206 and 
306 of the Federal Power Act, 16 U.S.C. 824e and 825e and Rule 206 of 
the Federal Energy Regulatory Commission's (Commission) Rules of 
Practice and Procedure, 18 CFR 385.206, Tipmont Rural Electric Member 
Cooperative (Complainant) filed a formal complaint against Wabash 
Valley Power Authority (Respondent) requesting that the Commission find 
that the Complainant may terminate services early under its wholesale 
requirements power sales agreements with the Respondent, subject to the 
Complaint paying any stranded cost that Respondent may incur as a 
result of such early termination, all as more fully explained in the 
complaint.
    The Complainant certifies that copies of the complaint were served 
on the contacts for Respondent, as listed on the Commission's list of 
Corporate Officials, to the extent such officials remain at Wabash 
Valley.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will

[[Page 50917]]

not serve to make protestants parties to the proceeding. Any person 
wishing to become a party must file a notice of intervention or motion 
to intervene, as appropriate. The Respondent's answer and all 
interventions, or protests must be filed on or before the comment date. 
The Respondent's answer, motions to intervene, and protests must be 
served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
eLibrary link and is available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the website that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
[email protected], or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on October 22, 2018.

    Dated: October 3, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-21942 Filed 10-9-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.