Notice of Complaint: Tipmont Rural Electric Member Cooperative v. Wabash Valley Power Authority, 50916-50917 [2018-21942]
Download as PDF
50916
Federal Register / Vol. 83, No. 196 / Wednesday, October 10, 2018 / Notices
Dated: October 2, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[FR Doc. 2018–21931 Filed 10–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: October 2, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[Docket No. ER19–9–000]
amozie on DSK3GDR082PROD with NOTICES1
Mankato Energy Center II, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2018–21937 Filed 10–9–18; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding Mankato
Energy Center II, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 22,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
VerDate Sep<11>2014
21:20 Oct 09, 2018
Jkt 247001
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 17, 2018.
Dated: October 2, 2018.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2018–21892 Filed 10–9–18; 8:45 am]
[Docket Nos. EL18–206–000, QF16–557–
001]
BILLING CODE 6717–01–P
Red Lake Falls Community Hybrid,
LLC; Notice of Petition for
Enforcement
DEPARTMENT OF ENERGY
Take notice that on September 26,
2018, pursuant to section 210(h) of the
Public Utility Regulatory Policies Act of
1978 (PURPA), Red Lake Falls
Community Hybrid, LLC (Petitioner)
filed a Petition for Enforcement,
requesting that the Federal Energy
Regulatory Commission (Commission)
initiate an enforcement action against
Minnesota Public Utilities Commission
to remedy their alleged improper
implementation of PURPA, all as more
fully explained in their petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Petitioners.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. EL19–2–000]
Notice of Complaint: Tipmont Rural
Electric Member Cooperative v.
Wabash Valley Power Authority
Take notice that on October 1, 2018,
pursuant to sections 206 and 306 of the
Federal Power Act, 16 U.S.C. 824e and
825e and Rule 206 of the Federal Energy
Regulatory Commission’s (Commission)
Rules of Practice and Procedure, 18 CFR
385.206, Tipmont Rural Electric
Member Cooperative (Complainant)
filed a formal complaint against Wabash
Valley Power Authority (Respondent)
requesting that the Commission find
that the Complainant may terminate
services early under its wholesale
requirements power sales agreements
with the Respondent, subject to the
Complaint paying any stranded cost that
Respondent may incur as a result of
such early termination, all as more fully
explained in the complaint.
The Complainant certifies that copies
of the complaint were served on the
contacts for Respondent, as listed on the
Commission’s list of Corporate Officials,
to the extent such officials remain at
Wabash Valley.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
E:\FR\FM\10OCN1.SGM
10OCN1
Federal Register / Vol. 83, No. 196 / Wednesday, October 10, 2018 / Notices
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 22, 2018.
Dated: October 3, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–21942 Filed 10–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
amozie on DSK3GDR082PROD with NOTICES1
Filings Instituting Proceedings
Docket Numbers: RP18–369–002.
Applicants: Sea Robin Pipeline
Company, LLC.
Description: Compliance filing
Quality Compliance to be effective 8/1/
2018.
Filed Date: 10/2/18.
Accession Number: 20181002–5033.
Comments Due: 5 p.m. ET 10/15/18.
Docket Numbers: RP19–27–000.
Applicants: Texas Eastern
Transmission, LP.
VerDate Sep<11>2014
21:20 Oct 09, 2018
Jkt 247001
Description: § 4(d) Rate Filing: STEP
Project Non-Conforming Interim
Agreements to be effective 10/1/2018.
Filed Date: 10/2/18.
Accession Number: 20181002–5000.
Comments Due: 5 p.m. ET 10/15/18.
Docket Numbers: RP19–29–000.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing:
Volume No. 2—Neg Rate Agmt—
NextEra Energy Marketing, LLC
SP338828 to be effective 10/1/2018.
Filed Date: 10/2/18.
Accession Number: 20181002–5042.
Comments Due: 5 p.m. ET 10/15/18.
Docket Numbers: RP19–31–000.
Applicants: Dauphin Island Gathering
Partners.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing 10–2–2018 to be
effective 11/1/2018.
Filed Date: 10/2/18.
Accession Number: 20181002–5088.
Comments Due: 5 p.m. ET 10/15/18.
Docket Numbers: RP19–32–000.
Applicants: Dominion Energy
Transmission, Inc.
Description: § 4(d) Rate Filing: DETI—
October 2, 2018 Nonconforming Service
Agreements to be effective 11/1/2018.
Filed Date: 10/2/18.
Accession Number: 20181002–5110.
Comments Due: 5 p.m. ET 10/15/18.
Docket Numbers: RP19–33–000.
Applicants: Caledonia Energy
Partners, L.L.C.
Description: § 4(d) Rate Filing:
Updates to Caledonia Energy Partners,
LLC FERC Gas Tariff to be effective 11/
1/2018.
Filed Date: 10/2/18.
Accession Number: 20181002–5113.
Comments Due: 5 p.m. ET 10/15/18.
Docket Numbers: RP19–34–000.
Applicants: Freebird Gas Storage,
L.L.C.
Description: § 4(d) Rate Filing:
Updates to Freebird Gas Storage, LLC
FERC Gas Tariff to be effective 11/1/
2018.
Filed Date: 10/2/18.
Accession Number: 20181002–5114.
Comments Due: 5 p.m. ET 10/15/18.
Docket Numbers: RP19–35–000.
Applicants: Cimarron River Pipeline,
LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates 2018–10–03 to be
effective 10/3/2018.
Filed Date: 10/2/18.
Accession Number: 20181002–5158.
Comments Due: 5 p.m. ET 10/15/18.
Docket Numbers: RP19–36–000.
Applicants: Dominion Energy Questar
Pipeline, LLC.
Description: § 4(d) Rate Filing:
Statement of Negotiated Rates Version
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
50917
8.0.0—Highpoint Operating Corp. to be
effective 10/2/2018.
Filed Date: 10/2/18.
Accession Number: 20181002–5173.
Comments Due: 5 p.m. ET 10/15/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 3, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–21933 Filed 10–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP18–806–001.
Applicants: ENGIE Gas & LNG LLC,
Exelon Generation Company, LLC.
Description: Joint Petition to Amend
Temporary Waivers of Capacity Release
Regulations and Policies, et al.
Filed Date: 9/28/18.
Accession Number: 20180928–5188.
Comments Due: 5 p.m. ET 10/5/18.
Docket Numbers: RP17–913–003.
Applicants: Natural Gas Pipeline
Company of America.
Description: Compliance filing Filing
Settlement Rates Phase II November 1
2018 to be effective 11/1/2018.
Filed Date: 10/1/18.
Accession Number: 20181001–5321.
Comments Due: 5 p.m. ET 10/15/18.
Docket Numbers: RP19–1–000.
Applicants: DBM Pipeline, LLC.
Description: Compliance filing Cost
and Revenue Study under Docket No.
CP15–104–000.
E:\FR\FM\10OCN1.SGM
10OCN1
Agencies
[Federal Register Volume 83, Number 196 (Wednesday, October 10, 2018)]
[Notices]
[Pages 50916-50917]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-21942]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL19-2-000]
Notice of Complaint: Tipmont Rural Electric Member Cooperative v.
Wabash Valley Power Authority
Take notice that on October 1, 2018, pursuant to sections 206 and
306 of the Federal Power Act, 16 U.S.C. 824e and 825e and Rule 206 of
the Federal Energy Regulatory Commission's (Commission) Rules of
Practice and Procedure, 18 CFR 385.206, Tipmont Rural Electric Member
Cooperative (Complainant) filed a formal complaint against Wabash
Valley Power Authority (Respondent) requesting that the Commission find
that the Complainant may terminate services early under its wholesale
requirements power sales agreements with the Respondent, subject to the
Complaint paying any stranded cost that Respondent may incur as a
result of such early termination, all as more fully explained in the
complaint.
The Complainant certifies that copies of the complaint were served
on the contacts for Respondent, as listed on the Commission's list of
Corporate Officials, to the extent such officials remain at Wabash
Valley.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will
[[Page 50917]]
not serve to make protestants parties to the proceeding. Any person
wishing to become a party must file a notice of intervention or motion
to intervene, as appropriate. The Respondent's answer and all
interventions, or protests must be filed on or before the comment date.
The Respondent's answer, motions to intervene, and protests must be
served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
eLibrary link and is available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[email protected], or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on October 22, 2018.
Dated: October 3, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-21942 Filed 10-9-18; 8:45 am]
BILLING CODE 6717-01-P