Combined Notice of Filings #1, 50911-50912 [2018-21939]
Download as PDF
amozie on DSK3GDR082PROD with NOTICES1
Federal Register / Vol. 83, No. 196 / Wednesday, October 10, 2018 / Notices
radionuclide concentrations greater than
the Class C limits. Reprocessing waste
that does not exceed the Class C limits
is non-HLW.
DOE interprets ‘‘sufficient
concentrations’’ in the statutory context
in which the definition was enacted,
which, as discussed above, is focused
on protecting the public and the
environment from the hazards posed by
nuclear waste. In addition to the
characteristics of the waste itself, the
risk that reprocessing waste poses to
human health and the environment
depends on the physical characteristics
of the disposal facility and that facility’s
ability to safely isolate the waste from
the human environment. Relevant
characteristics of a disposal facility may
include the depth of disposal, use of
engineered barriers, and geologic,
hydrologic, and geochemical features of
the site. Taking these considerations
into account, it is reasonable to interpret
‘‘sufficient concentrations’’ to mean
concentrations of fission products in
combination with long-lived
radionuclides that would require
disposal in a deep geologic repository.
Accordingly, under DOE’s
interpretation, solid waste that exceeds
the NRC’s Class C limits would be
subject to detailed characterization and
technical analysis of the radiological
characteristics of the waste. This,
combined with the physical
characteristics of a specific disposal
facility and the method of disposal,
would determine whether the facility
could meet its performance objectives,
and if the waste can be disposed of
safely. This approach would be
governed by the waste characterization
and analysis process and performance
objectives for the disposal facility
established by the applicable regulator,
and thereby protective of human health
and the environment.
The DOE interpretation does not
require the removal of key radionuclides
to the maximum extent that is
technically and economically practical
before DOE can define waste as nonHLW. Nothing in the statutory text of
the AEA or the NWPA requires that
radionuclides be removed to the
maximum extent technically and
economically practical prior to
determining whether waste is HLW.
DOE has determined that the removal of
radionuclides from waste that already
meets existing legal and technical
requirements for safe transportation and
disposal is unnecessary and inefficient,
and does not benefit human health or
the environment. To the contrary, it
potentially presents a greater risk to
human health and the environment
VerDate Sep<11>2014
21:20 Oct 09, 2018
Jkt 247001
because it prolongs the temporary
storage of waste.
Therefore, under DOE’s
interpretation, waste resulting from the
reprocessing of SNF is non-HLW if the
waste:
I. Does not exceed concentration limits for
Class C low-level radioactive waste as set
out in section 61.55 of title 10, Code of
Federal Regulations; or
II. Does not require disposal in a deep
geologic repository and meets the
performance objectives of a disposal
facility as demonstrated through a
performance assessment conducted in
accordance with applicable regulatory
requirements.
Reprocessing waste meeting either I or
II of the above is non-HLW, and may be
classified and disposed in accordance
with its radiological characteristics in
an appropriate facility provided all
applicable requirements of the disposal
facility are met.
C. Request for Comments
The Department specifically requests
comments on its interpretation that
reprocessing waste meeting either of the
two criterion stated above is non-HLW.
This Notice is intended to solicit public
feedback on the DOE interpretation to
better understand stakeholder
perspectives prior to appropriate input
and consultation with affected state and
local regulators and any waste disposal
classification decisions.
The Department will consider all
comments received during the public
comment period, and modify its
proposed approach, as appropriate,
based on public comment.
Signed at Washington, DC, on October 4,
2018.
Anne Marie White,
Assistant Secretary for Environmental
Management.
[FR Doc. 2018–22002 Filed 10–9–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–2–000.
Applicants: AL Sandersville, LLC,
Effingham County Power, LLC, MPC
Generating, LLC, Walton County Power,
LLC, Washington County Power, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of AL
Sandersville, LLC, et. al.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
50911
Filed Date: 10/3/18.
Accession Number: 20181003–5078.
Comments Due: 5 p.m. ET 10/24/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1521–004;
ER10–1520–004;ER10–1522–003.
Applicants: Occidental Power
Marketing, L.P., Occidental Power
Services, Inc., Occidental Chemical
Corporation.
Description: Second Supplement to
June 29, 2018 Updated Market Power
Analysis for the Central Region of the
Occidental MBRA Entities.
Filed Date: 9/28/18.
Accession Number: 20180928–5171.
Comments Due: 5 p.m. ET 10/19/18.
Docket Numbers: ER17–2515–004.
Applicants: Chambers Cogeneration,
Limited Partnership.
Description: Compliance filing:
Settlement Compliance Filing to be
effective 11/1/2017.
Filed Date: 10/1/18.
Accession Number: 20181001–5150.
Comments Due: 5 p.m. ET 10/22/18.
Docket Numbers: ER18–1424–001.
Applicants: Rio Bravo Fresno, A
California Joint Venture.
Description: Report Filing: refund
report 2018 to be effective N/A.
Filed Date: 10/2/18.
Accession Number: 20181002–5171.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER18–1427–001.
Applicants: Rio Bravo Rocklin, A
California Joint Venture.
Description: Report Filing: refund
report 2018 to be effective N/A.
Filed Date: 10/2/18.
Accession Number: 20181002–5174.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER18–2175–001.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, West Penn Power
Company, The Potomac Edison
Company, Monongahela Power
Company, Trans-Allegheny Interstate
Line Company, American Transmission
Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: Tariff Amendment: MAIT
et al submit Supplement in ER18–2175–
000 re: IAs, SA Nos 2149 and 3743 to
be effective 10/5/2018.
Filed Date: 10/3/18.
Accession Number: 20181003–5013.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER18–2426–001.
Applicants: The Potomac Edison
Company, PJM Interconnection, L.L.C.
Description: Tariff Amendment:
Potomac submits Supplemental Filing
in ER18–2426–000 re: IA SA No. 4452
to be effective 11/13/2018.
E:\FR\FM\10OCN1.SGM
10OCN1
amozie on DSK3GDR082PROD with NOTICES1
50912
Federal Register / Vol. 83, No. 196 / Wednesday, October 10, 2018 / Notices
Filed Date: 10/3/18.
Accession Number: 20181003–5007.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19–29–001.
Applicants: NorthWestern
Corporation.
Description: Tariff Amendment: New
Baseline—Service Agreements under
Montana OATT (Part 1) to be effective
10/8/2018.
Filed Date: 10/3/18.
Accession Number: 20181003–5008.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19–29–002.
Applicants: NorthWestern
Corporation.
Description: Tariff Amendment: New
Baseline—Service Agreements under
Montana OATT (Part 2) to be effective
10/8/2018.
Filed Date: 10/3/18.
Accession Number: 20181003–5012.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19–29–003.
Applicants: NorthWestern
Corporation.
Description: Tariff Amendment: New
Baseline—Service Agreements under
Montana OATT (Part 3 of 3) to be
effective 10/8/2018.
Filed Date: 10/3/18.
Accession Number: 20181003–5014.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19–33–001.
Applicants: NorthWestern
Corporation.
Description: Tariff Amendment: New
Baseline—Other Rate Schedules
(Montana) to be effective 10/8/2018.
Filed Date: 10/2/18.
Accession Number: 20181002–5183.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER19–34–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–10–02_MISO Pseudo-Tie
Congestion Overlap Phase 2 Filing to be
effective 3/1/2019.
Filed Date: 10/2/18.
Accession Number: 20181002–5155.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER19–35–000.
Applicants: CPV Biomass Holdings,
LLC.
Description: Tariff Cancellation:
Notice of Cancellation of Market-Based
Rate Tariff to be effective 10/3/2018.
Filed Date: 10/2/18.
Accession Number: 20181002–5156.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER19–36–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
4910; Queue No. AC2–161 to be
effective 11/5/2018.
VerDate Sep<11>2014
21:20 Oct 09, 2018
Jkt 247001
Filed Date: 10/2/18.
Accession Number: 20181002–5157.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER19–37–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–10–02_SA 3176 NSP–NSP GIA
(J460) to be effective 9/28/2018.
Filed Date: 10/2/18.
Accession Number: 20181002–5184.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER19–38–000.
Applicants: Dominion Energy
Fairless, LLC.
Description: Baseline eTariff Filing:
Informational Reort—Rate Schedule No.
2 to be effective 12/7/2018.
Filed Date: 10/2/18.
Accession Number: 20181002–5185.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER19–39–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Eldorado Substation Additional
Facilities and Interconnection
Agreement to be effective 12/3/2018.
Filed Date: 10/3/18.
Accession Number: 20181003–5002.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19–40–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1628R13 Western Farmers Electric
Cooperative NITSA to be effective 12/1/
2018.
Filed Date: 10/3/18.
Accession Number: 20181003–5011.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19–41–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
MAIT submits IA SA No. 4577 to be
effective 12/3/2018.
Filed Date: 10/3/18.
Accession Number: 20181003–5018.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19–42–000.
Applicants: NorthWestern
Corporation.
Description: Tariff Cancellation:
Cancellation of NWE Montana OATT
under Tariff ID 28 to be effective 10/8/
2018.
Filed Date: 10/3/18.
Accession Number: 20181003–5075.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19–43–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
3389; Queue No. X3–081 to be effective
10/17/2018.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
Filed Date: 10/3/18.
Accession Number: 20181003–5076.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19–44–000.
Applicants: Idaho Power Company.
Description: Tariff Cancellation:
Notice of Cancellation of Rate Schedule
163—Comm Agree—LaGrande-Pocatello
to be effective 12/3/2018.
Filed Date: 10/3/18.
Accession Number: 20181003–5080.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19–45–000.
Applicants: Citizens Sunrise
Transmission LLC.
Description: § 205(d) Rate Filing:
Annual TRBAA Filing October 2018 to
be effective 1/1/2019.
Filed Date: 10/3/18.
Accession Number: 20181003–5086.
Comments Due: 5 p.m. ET 10/24/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 3, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–21939 Filed 10–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR18–39–000]
Andeavor Field Services LLC; Notice
of Request for Temporary Waiver
Take notice that on September 28,
2018, pursuant to Rules 202 and 203 of
the Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.202
and 203, Andeavor Field Services LLC
(Andeavor) filed a petition seeking a
temporary waiver of the tariff filing and
reporting requirements applicable to
E:\FR\FM\10OCN1.SGM
10OCN1
Agencies
[Federal Register Volume 83, Number 196 (Wednesday, October 10, 2018)]
[Notices]
[Pages 50911-50912]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-21939]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-2-000.
Applicants: AL Sandersville, LLC, Effingham County Power, LLC, MPC
Generating, LLC, Walton County Power, LLC, Washington County Power,
LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act, et al. of AL Sandersville, LLC, et. al.
Filed Date: 10/3/18.
Accession Number: 20181003-5078.
Comments Due: 5 p.m. ET 10/24/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1521-004; ER10-1520-004;ER10-1522-003.
Applicants: Occidental Power Marketing, L.P., Occidental Power
Services, Inc., Occidental Chemical Corporation.
Description: Second Supplement to June 29, 2018 Updated Market
Power Analysis for the Central Region of the Occidental MBRA Entities.
Filed Date: 9/28/18.
Accession Number: 20180928-5171.
Comments Due: 5 p.m. ET 10/19/18.
Docket Numbers: ER17-2515-004.
Applicants: Chambers Cogeneration, Limited Partnership.
Description: Compliance filing: Settlement Compliance Filing to be
effective 11/1/2017.
Filed Date: 10/1/18.
Accession Number: 20181001-5150.
Comments Due: 5 p.m. ET 10/22/18.
Docket Numbers: ER18-1424-001.
Applicants: Rio Bravo Fresno, A California Joint Venture.
Description: Report Filing: refund report 2018 to be effective N/A.
Filed Date: 10/2/18.
Accession Number: 20181002-5171.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER18-1427-001.
Applicants: Rio Bravo Rocklin, A California Joint Venture.
Description: Report Filing: refund report 2018 to be effective N/A.
Filed Date: 10/2/18.
Accession Number: 20181002-5174.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER18-2175-001.
Applicants: Mid-Atlantic Interstate Transmission, LLC, West Penn
Power Company, The Potomac Edison Company, Monongahela Power Company,
Trans-Allegheny Interstate Line Company, American Transmission Systems,
Incorporated, PJM Interconnection, L.L.C.
Description: Tariff Amendment: MAIT et al submit Supplement in
ER18-2175-000 re: IAs, SA Nos 2149 and 3743 to be effective 10/5/2018.
Filed Date: 10/3/18.
Accession Number: 20181003-5013.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER18-2426-001.
Applicants: The Potomac Edison Company, PJM Interconnection, L.L.C.
Description: Tariff Amendment: Potomac submits Supplemental Filing
in ER18-2426-000 re: IA SA No. 4452 to be effective 11/13/2018.
[[Page 50912]]
Filed Date: 10/3/18.
Accession Number: 20181003-5007.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19-29-001.
Applicants: NorthWestern Corporation.
Description: Tariff Amendment: New Baseline--Service Agreements
under Montana OATT (Part 1) to be effective 10/8/2018.
Filed Date: 10/3/18.
Accession Number: 20181003-5008.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19-29-002.
Applicants: NorthWestern Corporation.
Description: Tariff Amendment: New Baseline--Service Agreements
under Montana OATT (Part 2) to be effective 10/8/2018.
Filed Date: 10/3/18.
Accession Number: 20181003-5012.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19-29-003.
Applicants: NorthWestern Corporation.
Description: Tariff Amendment: New Baseline--Service Agreements
under Montana OATT (Part 3 of 3) to be effective 10/8/2018.
Filed Date: 10/3/18.
Accession Number: 20181003-5014.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19-33-001.
Applicants: NorthWestern Corporation.
Description: Tariff Amendment: New Baseline--Other Rate Schedules
(Montana) to be effective 10/8/2018.
Filed Date: 10/2/18.
Accession Number: 20181002-5183.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER19-34-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-10-02_MISO Pseudo-Tie
Congestion Overlap Phase 2 Filing to be effective 3/1/2019.
Filed Date: 10/2/18.
Accession Number: 20181002-5155.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER19-35-000.
Applicants: CPV Biomass Holdings, LLC.
Description: Tariff Cancellation: Notice of Cancellation of Market-
Based Rate Tariff to be effective 10/3/2018.
Filed Date: 10/2/18.
Accession Number: 20181002-5156.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER19-36-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of WMPA SA
No. 4910; Queue No. AC2-161 to be effective 11/5/2018.
Filed Date: 10/2/18.
Accession Number: 20181002-5157.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER19-37-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-10-02_SA 3176 NSP-NSP
GIA (J460) to be effective 9/28/2018.
Filed Date: 10/2/18.
Accession Number: 20181002-5184.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER19-38-000.
Applicants: Dominion Energy Fairless, LLC.
Description: Baseline eTariff Filing: Informational Reort--Rate
Schedule No. 2 to be effective 12/7/2018.
Filed Date: 10/2/18.
Accession Number: 20181002-5185.
Comments Due: 5 p.m. ET 10/23/18.
Docket Numbers: ER19-39-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Eldorado Substation
Additional Facilities and Interconnection Agreement to be effective 12/
3/2018.
Filed Date: 10/3/18.
Accession Number: 20181003-5002.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19-40-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1628R13 Western Farmers
Electric Cooperative NITSA to be effective 12/1/2018.
Filed Date: 10/3/18.
Accession Number: 20181003-5011.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19-41-000.
Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: MAIT submits IA SA No. 4577
to be effective 12/3/2018.
Filed Date: 10/3/18.
Accession Number: 20181003-5018.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19-42-000.
Applicants: NorthWestern Corporation.
Description: Tariff Cancellation: Cancellation of NWE Montana OATT
under Tariff ID 28 to be effective 10/8/2018.
Filed Date: 10/3/18.
Accession Number: 20181003-5075.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19-43-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of WMPA SA
No. 3389; Queue No. X3-081 to be effective 10/17/2018.
Filed Date: 10/3/18.
Accession Number: 20181003-5076.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19-44-000.
Applicants: Idaho Power Company.
Description: Tariff Cancellation: Notice of Cancellation of Rate
Schedule 163--Comm Agree--LaGrande-Pocatello to be effective 12/3/2018.
Filed Date: 10/3/18.
Accession Number: 20181003-5080.
Comments Due: 5 p.m. ET 10/24/18.
Docket Numbers: ER19-45-000.
Applicants: Citizens Sunrise Transmission LLC.
Description: Sec. 205(d) Rate Filing: Annual TRBAA Filing October
2018 to be effective 1/1/2019.
Filed Date: 10/3/18.
Accession Number: 20181003-5086.
Comments Due: 5 p.m. ET 10/24/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: October 3, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-21939 Filed 10-9-18; 8:45 am]
BILLING CODE 6717-01-P