Wallowa Resources Community Solutions Inc.; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 50659-50660 [2018-21772]
Download as PDF
Federal Register / Vol. 83, No. 195 / Tuesday, October 9, 2018 / Notices
date of the notice of ready for
environmental analysis.
Dated: September 28, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–21775 Filed 10–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2413–125]
amozie on DSK3GDR082PROD with NOTICES1
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests: Georgia
Power Company
Take notice that the following
hydroelectric application has been filed
with the Federal Energy Regulatory
Commission and is available for public
inspection:
a. Type of Application: Non-Project
Use of Project Lands and Waters—Sand
Mine.
b. Project No.: 2413–125.
c. Date Filed: August 20, 2018.
d. Applicant: Georgia Power Company
(licensee).
e. Name of Project: Wallace Pumped
Storage Hydroelectric Project.
f. Location: The proposed non-project
sand mine is located in the northern
part of Lake Oconee, the project
reservoir, in Greene County, Georgia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Herbie
Johnston, Hydro General Manager, 600
North 18th Street, Bin 16N–8180,
Birmingham, AL 35203.
i. FERC Contact: Michael Calloway at
202–502–8041, or michael.calloway@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file motions to intervene,
protests, and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
VerDate Sep<11>2014
19:13 Oct 05, 2018
Jkt 247001
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2413–125.
k. Description of Request: The license
filed a request to permit a non-project
use of project lands and waters to allow
Greenbriar Sand Company to dredge a
334 acre area of the upper project
reservoir in Greene County, Georgia for
the purposes of commercial sand
mining. The mine operator expects the
year round operation of the sand mine
will extract approximately 1.1 million
tons of sediment per year for 25 years.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
202–502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call 202–502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’; ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
50659
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the non-project
use application. Agencies may obtain
copies of plans directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: October 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–21779 Filed 10–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD18–14–000]
Wallowa Resources Community
Solutions Inc.; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
On September 26, 2018, the Wallowa
Resources Community Solutions Inc.,
filed a notice of intent to construct a
qualifying conduit hydropower facility,
pursuant to section 30 of the Federal
Power Act (FPA), as amended by section
4 of the Hydropower Regulatory
Efficiency Act of 2013 (HREA). The
proposed Arrowhead Pipeline Hydro
Station Project would have an installed
capacity of 61 kilowatts (kW), and
would be located on the existing
Arrowhead Irrigation Pipeline. The
project would be located near the
Township of Joseph in Wallowa County,
Oregon.
Applicant Contact: Kyle Petrocine,
Wallowa Resources Community
Solutions Inc., 401 NE 1st Street,
E:\FR\FM\09OCN1.SGM
09OCN1
50660
Federal Register / Vol. 83, No. 195 / Tuesday, October 9, 2018 / Notices
Enterprise, OR 97828, Phone No (541)
398–0018, email: kyle@
wallowaresources.org.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062; Email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A single
turbine and induction generator
connected to an existing irrigation
pipeline with a total generating capacity
of 61 kW, and (2) appurtenant facilities.
The proposed project would have an
estimated annual generation of 87
megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Description
FPA 30(a)(3)(A), as amended by HREA ..
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
FPA 30(a)(3)(C)(i), as amended by HREA
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
amozie on DSK3GDR082PROD with NOTICES1
Satisfies
(Y/N)
Statutory provision
by
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: The
proposed Arrowhead Pipeline Hydro
Station Project will not interfere with
the primary purpose of the conduit,
which is to transport water for irrigation
to ranches and farm in Oregon’s
Southern Alder Slope Valley. Therefore,
based upon the above criteria,
Commission staff preliminarily
determines that the proposal satisfies
the requirements for a qualifying
conduit hydropower facility, which is
not required to be licensed or exempted
from licensing.
Comments and Motions To Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
VerDate Sep<11>2014
19:13 Oct 05, 2018
Jkt 247001
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD18–14) in the
1 18
PO 00000
CFR 385.2001–2005 (2017).
Frm 00030
Fmt 4703
Sfmt 4703
Y
Y
Y
Y
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: October 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–21772 Filed 10–5–18; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL ELECTION COMMISSION
Sunshine Act Meeting
Thursday, October 11,
2018 at 10:00 a.m.
TIME AND DATE:
1050 First Street NE,
Washington, DC (12th Floor)
PLACE:
STATUS:
This meeting will be open to the
public.
MATTERS TO BE CONSIDERED:
Correction and Approval of Minutes for
September 6, 2018
Draft Advisory Opinion 2018–12:
Defending Digital Campaigns, Inc.
Management and Administrative
Matters
CONTACT PERSON FOR MORE INFORMATION:
Judith Ingram, Press Officer, Telephone:
(202) 694–1220.
Individuals who plan to attend and
require special assistance, such as sign
language interpretation or other
reasonable accommodations, should
contact Dayna C. Brown, Secretary and
E:\FR\FM\09OCN1.SGM
09OCN1
Agencies
[Federal Register Volume 83, Number 195 (Tuesday, October 9, 2018)]
[Notices]
[Pages 50659-50660]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-21772]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD18-14-000]
Wallowa Resources Community Solutions Inc.; Notice of Preliminary
Determination of a Qualifying Conduit Hydropower Facility and
Soliciting Comments and Motions To Intervene
On September 26, 2018, the Wallowa Resources Community Solutions
Inc., filed a notice of intent to construct a qualifying conduit
hydropower facility, pursuant to section 30 of the Federal Power Act
(FPA), as amended by section 4 of the Hydropower Regulatory Efficiency
Act of 2013 (HREA). The proposed Arrowhead Pipeline Hydro Station
Project would have an installed capacity of 61 kilowatts (kW), and
would be located on the existing Arrowhead Irrigation Pipeline. The
project would be located near the Township of Joseph in Wallowa County,
Oregon.
Applicant Contact: Kyle Petrocine, Wallowa Resources Community
Solutions Inc., 401 NE 1st Street,
[[Page 50660]]
Enterprise, OR 97828, Phone No (541) 398-0018, email:
[email protected].
FERC Contact: Robert Bell, Phone No. (202) 502-6062; Email:
[email protected].
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A single turbine and induction generator
connected to an existing irrigation pipeline with a total generating
capacity of 61 kW, and (2) appurtenant facilities. The proposed project
would have an estimated annual generation of 87 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the Y
HREA. facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial consumption
and not primarily for
the generation of
electricity.
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed, operated,
or maintained for the
generation of electric
power and uses for
such generation only
the hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity
that does not exceed 5
megawatts.
FPA 30(a)(3)(C)(iii), as On or before August 9, Y
amended by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing requirements
of Part I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The proposed Arrowhead Pipeline Hydro
Station Project will not interfere with the primary purpose of the
conduit, which is to transport water for irrigation to ranches and farm
in Oregon's Southern Alder Slope Valley. Therefore, based upon the
above criteria, Commission staff preliminarily determines that the
proposal satisfies the requirements for a qualifying conduit hydropower
facility, which is not required to be licensed or exempted from
licensing.
Comments and Motions To Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2017).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE, Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (i.e., CD18-14) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call
(202) 502-8659.
Dated: October 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-21772 Filed 10-5-18; 8:45 am]
BILLING CODE 6717-01-P