Notice of Availability of Draft Environmental Assessment: KEI (Maine) Power Management (III) LLC, 49919-49920 [2018-21496]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 83, No. 192 / Wednesday, October 3, 2018 / Notices
Description: § 205(d) Rate Filing:
MAIT submits four ECSAs, Service
Agreement Nos. 5024, 5025, 5027, and
5031 to be effective 11/26/2018.
Filed Date: 9/26/18.
Accession Number: 20180926–5157.
Comments Due: 5 p.m. ET 10/17/18.
Docket Numbers: ER18–2486–000.
Applicants: San Diego Gas & Electric
Company.
Description: § 205(d) Rate Filing:
SDGE IV SOLAR AGMT 57 V 11 LGIA
AMENDMENT to be effective 9/27/
2018.
Filed Date: 9/26/18.
Accession Number: 20180926–5159.
Comments Due: 5 p.m. ET 10/17/18.
Docket Numbers: ER18–2487–000.
Applicants: Rail Splitter Wind Farm,
LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 11/26/2018.
Filed Date: 9/27/18.
Accession Number: 20180927–5035.
Comments Due: 5 p.m. ET 10/18/18.
Docket Numbers: ER18–2488–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Urban Grid Solar Projects (Chase Solar)
LGIA Filing to be effective 9/13/2018.
Filed Date: 9/27/18.
Accession Number: 20180927–5055.
Comments Due: 5 p.m. ET 10/18/18.
Docket Numbers: ER18–2489–000.
Applicants: ISO New England Inc.
Description: § 205(d) Rate Filing:
Ministerial Filing to Conform Sections
III.2, III.12, III.13.7 and III.13.8 to be
effective 6/1/2018.
Filed Date: 9/27/18.
Accession Number: 20180927–5056.
Comments Due: 5 p.m. ET 10/18/18.
Docket Numbers: ER18–2490–000.
Applicants: Arizona Public Service
Company.
Description: Tariff Cancellation:
Cancellation of Service Agreement No.
366 to be effective 11/27/2018.
Filed Date: 9/27/18.
Accession Number: 20180927–5061.
Comments Due: 5 p.m. ET 10/18/18.
Docket Numbers: ER18–2491–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 368—LCWCD to
be effective 9/1/2018.
Filed Date: 9/27/18.
Accession Number: 20180927–5063.
Comments Due: 5 p.m. ET 10/18/18.
Docket Numbers: ER18–2492–000.
Applicants: FTS Master Tenant 2,
LLC.
Description: Baseline eTariff Filing:
FTS Master Tenant 2 MBR Tariff to be
effective 10/1/2018.
VerDate Sep<11>2014
18:05 Oct 02, 2018
Jkt 247001
Filed Date: 9/27/18.
Accession Number: 20180927–5074.
Comments Due: 5 p.m. ET 10/18/18.
Docket Numbers: ER18–2493–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–09–27_SA 3084 St. Joseph Phase
II–NIPSCO GIA 1st Rev (J351) to be
effective 6/27/2018.
Filed Date: 9/27/18.
Accession Number: 20180927–5079.
Comments Due: 5 p.m. ET 10/18/18.
Docket Numbers: ER18–2494–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2881R6 City of Chanute, KS NITSA
NOA to be effective 9/1/2018.
Filed Date: 9/27/18.
Accession Number: 20180927–5082.
Comments Due: 5 p.m. ET 10/18/18.
Docket Numbers: ER18–2495–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
Orion Wind E&P Agmt to be effective 9/
19/2018.
Filed Date: 9/27/18.
Accession Number: 20180927–5090.
Comments Due: 5 p.m. ET 10/18/18.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR18–11–000.
Applicants: North American Electric
Reliability Corporation, ReliabilityFirst
Corporation, Midwest Reliability
Organization.
Description: Joint Petition of the
North American Electric Reliability
Corporation, et al. for Approval of
Registration Transfer Request of
Wisconsin Public Service Corporation
and Upper Michigan Energy Resources.
Filed Date: 9/26/18.
Accession Number: 20180926–5184.
Comments Due: 5 p.m. ET 10/16/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
49919
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 27, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–21495 Filed 10–2–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2808–017]
Notice of Availability of Draft
Environmental Assessment: KEI
(Maine) Power Management (III) LLC
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
subsequent license application for the
Barker’s Mill Hydroelectric Project,
located on the Little Androscoggin River
in Androscoggin County, Maine, and
has prepared a draft Environmental
Assessment (EA) for the project. The
project does not occupy lands of the
United States.
The draft EA contains staff’s analysis
of the potential effects of continued
operation and maintenance of the
project and concludes that licensing the
project, with appropriate environmental
protection measures, would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
A copy of the draft EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov/ using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/ferconline.asp
to be notified via email of new filings
and issuances related to these or other
pending projects. For assistance, contact
FERC Online Support.
Any comments should be filed within
30 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
E:\FR\FM\03OCN1.SGM
03OCN1
49920
Federal Register / Vol. 83, No. 192 / Wednesday, October 3, 2018 / Notices
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number 2808–017.
For further information, please
contact Karen Sughrue at (202) 502–
8556 or by email at karen.sughrue@
ferc.gov.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–21496 Filed 10–2–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–548–000]
daltland on DSKBBV9HB2PROD with NOTICES
Notice of Application: Eastern Shore
Natural Gas Company
Take notice that on September 14,
2018, Eastern Shore Natural Gas
Company (Eastern Shore), 500 Energy
Lane, Suite 200, Dover, Delaware,
19901, filed in Docket No. CP18–548–
000 an application pursuant to section
7(c) of the Natural Gas Act (NGA) and
Part 157 of the Commission’s
regulations for authorization to
construct, own and operate: (i) About
4.9 miles of 16-inch-diameter loop line
and appurtenant facilities in Kent
County, Delaware; (ii) about 7.39 miles
of 8-inch-diameter mainline extension
and appurtenant facilities in Sussex
County, Delaware; (iii) about 6.83 miles
of 10-inch-diameter mainline extension
in Wicomico and Somerset Counties,
Maryland; (iv) upgrades to an existing
pressure control facility, including 0.35
miles of 10-inch-diameter mainline
extension in Sussex County, Delaware;
and (v) delivery point measurement and
regulating facilities in Sussex County,
Delaware and Somerset County,
Maryland (Del-Mar Energy Pathway
Project). Eastern Shore states that the
proposed facilities will result in an
increase of 11,800 dekatherms per day
of additional firm transportation service
and 2,500 dekatherms per day of offpeak transportation service, or 14,300
dekatherms per day total. Eastern Shore
estimates the cost of the Del-Mar Energy
Pathway Project to be $37,100,000, all as
more fully set forth in the application
VerDate Sep<11>2014
18:05 Oct 02, 2018
Jkt 247001
which is on file with the Commission
and open to public inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Mark
C. Parker, P.E., Engineering Manager,
Eastern Shore Natural Gas Company;
500 Energy Lane, Suite 200, Dover, DE,
19901 at 1 (844) 366–3764, or by email
at maparker@esng.com.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
3 copies of filings made with the
Commission and must provide a copy to
the applicant and to every other party in
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commentors
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
CP16–4–001, the Commission will
apply its revised practice concerning
out-of-time motions to intervene in any
new Natural Gas Act section 3 or section
7 proceeding.1 Persons desiring to
become a party to a certificate
proceeding are to intervene in a timely
manner. If seeking to intervene out-oftime, the movant is required to ‘‘show
good cause why the time limitation
should be waived,’’ and should provide
justification by reference to factors set
forth in Rule 214(d)(1) of the
Commission’s Rules and Regulations.2
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
1 Tennessee Gas Pipeline Company, L.L.C., 162
FERC ¶61,167 at ¶50 (2018).
2 18 CFR 385.214(d)(1).
E:\FR\FM\03OCN1.SGM
03OCN1
Agencies
[Federal Register Volume 83, Number 192 (Wednesday, October 3, 2018)]
[Notices]
[Pages 49919-49920]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-21496]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2808-017]
Notice of Availability of Draft Environmental Assessment: KEI
(Maine) Power Management (III) LLC
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the subsequent license application for the Barker's Mill
Hydroelectric Project, located on the Little Androscoggin River in
Androscoggin County, Maine, and has prepared a draft Environmental
Assessment (EA) for the project. The project does not occupy lands of
the United States.
The draft EA contains staff's analysis of the potential effects of
continued operation and maintenance of the project and concludes that
licensing the project, with appropriate environmental protection
measures, would not constitute a major federal action that would
significantly affect the quality of the human environment.
A copy of the draft EA is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
at https://www.ferc.gov/ using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits, in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected] or toll-free at 1-866-208-3676, or for TTY,
(202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/ferconline.asp to be notified via email of new filings and issuances
related to these or other pending projects. For assistance, contact
FERC Online Support.
Any comments should be filed within 30 days from the date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters,
[[Page 49920]]
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments. For assistance, please
contact FERC Online Support. In lieu of electronic filing, please send
a paper copy to: Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. The first page of any filing
should include docket number 2808-017.
For further information, please contact Karen Sughrue at (202) 502-
8556 or by email at [email protected].
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-21496 Filed 10-2-18; 8:45 am]
BILLING CODE 6717-01-P