Notice of Application for Amendment of License, Soliciting Comments, Motions To Intervene, and Protests; Brookfield White Pine Hydro, LLC, 49555-49556 [2018-21414]
Download as PDF
Federal Register / Vol. 83, No. 191 / Tuesday, October 2, 2018 / Notices
Accession Number: 20180926–5095.
Comments Due: 5 p.m. ET 10/17/18.
Docket Numbers: ER18–2482–000.
Applicants: Wolverine Power Supply
Cooperative, Inc.
Description: Tariff Cancellation:
Notice of Cancellation of Rate Schedules
to be effective 9/27/2018.
Filed Date: 9/26/18.
Accession Number: 20180926–5113.
Comments Due: 5 p.m. ET 10/17/18.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES18–62–000.
Applicants: Oklahoma Gas and
Electric Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Oklahoma Gas and Electric Company.
Filed Date: 9/26/18.
Accession Number: 20180926–5088.
Comments Due: 5 p.m. ET 10/17/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 26, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–21411 Filed 10–1–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
amozie on DSK3GDR082PROD with NOTICES1
[Project No. 11834–068]
Notice of Application for Amendment
of License, Soliciting Comments,
Motions To Intervene, and Protests;
Brookfield White Pine Hydro, LLC
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
VerDate Sep<11>2014
17:16 Oct 01, 2018
Jkt 247001
a. Type of Proceeding: Application for
amendment of license.
b. Project No.: 11834–068.
c. Date Filed: August 28, 2018.
d. Licensee: Brookfield White Pine
Hydro, LLC.
e. Name of Project: Upper and Middle
Dams Storage Project.
f. Location: The project is located on
the Rapid River in Oxford and Franklin
counties, Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a—825r.
h. Licensee Contact: Ms. Kelly
Maloney, Brookfield Renewable, 150
Main Street, Lewiston, ME, (207) 233–
1995, Kelly.maloney@
brookfieldrenewable.com.
i. FERC Contact: Ms. Rebecca Martin,
(202) 502–6012, Rebecca.martin@
ferc.gov.
j. Deadline for filing comments,
interventions, and protests is 30 days
from the issuance date of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file motions to intervene, protests
and comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–11834–068.
k. Description of Project Facilities:
The project includes two developments:
Upper Dam, which impounds
Mooselookmeguntic Lake, and Middle
Dam, which impounds Richardson
Lake. The two dams operate as a single
water storage project to regulate flows to
the Androscoggin River for downstream
hydroelectric generation, reduction of
flood flows, and other beneficial uses.
The proposed work would only occur at
Middle Dam. Project works at the
Middle Dam Development consist of the
244-foot-long Middle Dam equipped
with a gatehouse containing: (a) Three
15-foot-wide by 12-foot-deep sluice
gates: (b) five 6-foot-wide by 14.7-footdeep gates; (c) six 7-foot-wide 14.7-footdeep shoal gates; and (d) six 9-foot-wide
by 12.3-foot deep spillway gates; a 560foot-long earthen dike extending north
of the gatehouse; a 200-foot-long earthen
dike extending south of the gatehouse;
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
49555
the 7,470 acre reservoir; the 180-footlong earthen dike (Black Cat Dike)
located 2,000 feet to the southeast of
Middle Dam; and appurtenant facilities.
l. Description of Request: The licensee
has filed a copy of its application with
the Maine Land Use Planning
Commission and the US Army Corps of
Engineers for its proposed replacement
of the spillway at the Middle Dam
Development. Replacement of the
Middle Dam Development spillway is
being required under Part 12 of the
Commission’s regulations for safety of
water power projects and project works.
The proposal involves a multi-year,
phased approach beginning with the
installation of a bypass gate to pass all
river flow during the removal of the
existing dam and installation of the new
dam. Black Cat Dike embankment
would also be modified to meet
Commission requirements. The
proposed measures would not alter the
basic footprint of the existing dam or
involve substantial modification of the
licensed operation of the project. Work
is proposed to begin in May 2019 and
be completed by December 15, 2023.
m. This filing may be viewed on the
Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction in the Commission’s
Public Reference Room located at 888
First Street NE, Room 2A, Washington,
DC 20426, or by calling (202) 502–8371.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .212
and .214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
E:\FR\FM\02OCN1.SGM
02OCN1
49556
Federal Register / Vol. 83, No. 191 / Tuesday, October 2, 2018 / Notices
p. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the surrender
application that is the subject of this
notice. Agencies may obtain copies of
the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
q. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If any agency does not file comments
within the time specified for filing
comments, it will be presumed to have
no comments.
Dated: September 26, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
The regular meeting of the Board
will be held at the offices of the Farm
Credit Administration in McLean,
Virginia, on October 11, 2018, from 9:00
a.m. until such time as the Board
concludes its business.
ADDRESSES: Farm Credit
Administration, 1501 Farm Credit Drive,
McLean, Virginia 22102–5090. Submit
attendance requests via email to
VisitorRequest@FCA.gov. See
SUPPLEMENTARY INFORMATION for further
information about attendance requests.
FOR FURTHER INFORMATION CONTACT: Dale
Aultman, Secretary to the Farm Credit
Administration Board, (703) 883–4009,
TTY (703) 883–4056, aultmand@
fca.gov.
SUPPLEMENTARY INFORMATION: Parts of
this meeting of the Board will be open
to the public (limited space available)
and parts will be closed to the public.
Please send an email to VisitorRequest@
FCA.gov at least 24 hours before the
meeting. In your email include: Name,
postal address, entity you are
representing (if applicable), and
telephone number. You will receive an
email confirmation from us. Please be
prepared to show a photo identification
when you arrive. If you need assistance
for accessibility reasons, or if you have
any questions, contact Dale Aultman,
Secretary to the Farm Credit
Administration Board, at (703) 883–
4009. The matters to be considered at
the meeting are:
DATES:
Open Session
A. Approval of Minutes
• September 13, 2018
B. New Business
• AgFirst Farm Credit Bank Rural
Housing Mortgage-backed Securities
Program
Closed Session *
• Office of Secondary Market Oversight
Periodic Report
Dated: September 28, 2018.
Dale Aultman,
Secretary, Farm Credit Administration Board.
[FR Doc. 2018–21414 Filed 10–1–18; 8:45 am]
BILLING CODE 6717–01–P
on the agreements to the Secretary by
email at Secretary@fmc.gov, or by mail,
Federal Maritime Commission,
Washington, DC 20573, within twelve
days of the date this notice appears in
the Federal Register. Copies of
agreements are available through the
Commission’s website (www.fmc.gov) or
by contacting the Office of Agreements
at (202) 523–5793 or tradeanalysis@
fmc.gov.
Agreement No.: 201208–002.
Agreement Name: Amended and
Restated Marine Terminal Services
Agreement Port of Houston Authority
and NYK Line (North America) Inc.
Parties: Nippon Yusen Kaisha; Ocean
Network Express Pte. Ltd.; and Port of
Houston Authority.
Filing Party: Chasless Yancy, Port of
Houston Authority.
Synopsis: The amendment assigns the
MTSA such that ONE will assume all of
NYK’s rights, title, obligations, and
liabilities under the MTSA, effective as
of the date of the transfer of such
entities’ container shipping divisions to
ONE.
Proposed Effective Date: 9/20/2018.
Location: https://www2.fmc.gov/
FMC.Agreements.Web/Public/
AgreementHistory/16293.
Agreement No.: 011730–008.
Agreement Name: GWF/Dole Space
Charter and Sailing Agreement.
Parties: Dole Ocean Cargo Express,
LLC; Great White Fleet Corp.; and Great
White Fleet Liner Services, Ltd.
Filing Party: Wayne Rohde; Cozen
O’Connor.
Synopsis: The amendment removes
Dole Ocean Cargo Express, Inc. as a
party to the Agreement and replaces it
with Dole Ocean Cargo Express, LLC.
Proposed Effective Date: 11/10/2018.
Location: https://www2.fmc.gov/
FMC.Agreements.Web/Public/
AgreementHistory/698.
Dated: September 27, 2018.
Rachel Dickon,
Secretary.
[FR Doc. 2018–21407 Filed 10–1–18; 8:45 am]
BILLING CODE 6731–AA–P
[FR Doc. 2018–21580 Filed 9–28–18; 4:15 pm]
BILLING CODE 6705–01–P
FEDERAL RESERVE SYSTEM
FARM CREDIT ADMINISTRATION
amozie on DSK3GDR082PROD with NOTICES1
Sunshine Act Meeting: Farm Credit
Administration Board
FEDERAL MARITIME COMMISSION
Notice of Agreements Filed
Farm Credit Administration.
ACTION: Notice, regular meeting.
AGENCY:
Notice is hereby given,
pursuant to the Government in the
Sunshine Act, of the regular meeting of
the Farm Credit Administration Board
(Board).
SUMMARY:
VerDate Sep<11>2014
17:16 Oct 01, 2018
Jkt 247001
The Commission hereby gives notice
of the filing of the following agreements
under the Shipping Act of 1984.
Interested parties may submit comments
* Session Closed—Exempt pursuant to 5 U.S.C.
552b(c)(8) and (9).
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
Formations of, Acquisitions by, and
Mergers of Bank Holding Companies
The companies listed in this notice
have applied to the Board for approval,
pursuant to the Bank Holding Company
Act of 1956 (12 U.S.C. 1841 et seq.)
(BHC Act), Regulation Y (12 CFR part
225), and all other applicable statutes
and regulations to become a bank
holding company and/or to acquire the
E:\FR\FM\02OCN1.SGM
02OCN1
Agencies
[Federal Register Volume 83, Number 191 (Tuesday, October 2, 2018)]
[Notices]
[Pages 49555-49556]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-21414]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 11834-068]
Notice of Application for Amendment of License, Soliciting
Comments, Motions To Intervene, and Protests; Brookfield White Pine
Hydro, LLC
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Proceeding: Application for amendment of license.
b. Project No.: 11834-068.
c. Date Filed: August 28, 2018.
d. Licensee: Brookfield White Pine Hydro, LLC.
e. Name of Project: Upper and Middle Dams Storage Project.
f. Location: The project is located on the Rapid River in Oxford
and Franklin counties, Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a--825r.
h. Licensee Contact: Ms. Kelly Maloney, Brookfield Renewable, 150
Main Street, Lewiston, ME, (207) 233-1995,
[email protected].
i. FERC Contact: Ms. Rebecca Martin, (202) 502-6012,
[email protected].
j. Deadline for filing comments, interventions, and protests is 30
days from the issuance date of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file motions
to intervene, protests and comments using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426. The first page of any filing should
include docket number P-11834-068.
k. Description of Project Facilities: The project includes two
developments: Upper Dam, which impounds Mooselookmeguntic Lake, and
Middle Dam, which impounds Richardson Lake. The two dams operate as a
single water storage project to regulate flows to the Androscoggin
River for downstream hydroelectric generation, reduction of flood
flows, and other beneficial uses. The proposed work would only occur at
Middle Dam. Project works at the Middle Dam Development consist of the
244-foot-long Middle Dam equipped with a gatehouse containing: (a)
Three 15-foot-wide by 12-foot-deep sluice gates: (b) five 6-foot-wide
by 14.7-foot-deep gates; (c) six 7-foot-wide 14.7-foot-deep shoal
gates; and (d) six 9-foot-wide by 12.3-foot deep spillway gates; a 560-
foot-long earthen dike extending north of the gatehouse; a 200-foot-
long earthen dike extending south of the gatehouse; the 7,470 acre
reservoir; the 180-foot-long earthen dike (Black Cat Dike) located
2,000 feet to the southeast of Middle Dam; and appurtenant facilities.
l. Description of Request: The licensee has filed a copy of its
application with the Maine Land Use Planning Commission and the US Army
Corps of Engineers for its proposed replacement of the spillway at the
Middle Dam Development. Replacement of the Middle Dam Development
spillway is being required under Part 12 of the Commission's
regulations for safety of water power projects and project works. The
proposal involves a multi-year, phased approach beginning with the
installation of a bypass gate to pass all river flow during the removal
of the existing dam and installation of the new dam. Black Cat Dike
embankment would also be modified to meet Commission requirements. The
proposed measures would not alter the basic footprint of the existing
dam or involve substantial modification of the licensed operation of
the project. Work is proposed to begin in May 2019 and be completed by
December 15, 2023.
m. This filing may be viewed on the Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number
excluding the last three digits in the docket number field to access
the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or email [email protected], for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction in the Commission's Public Reference Room located at 888
First Street NE, Room 2A, Washington, DC 20426, or by calling (202)
502-8371.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
o. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.212 and .214. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
[[Page 49556]]
p. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to the surrender application that is the subject of this notice.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
q. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described proceeding. If any agency does not
file comments within the time specified for filing comments, it will be
presumed to have no comments.
Dated: September 26, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-21414 Filed 10-1-18; 8:45 am]
BILLING CODE 6717-01-P