Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and Safeguards Information, 49587-49594 [2018-20182]
Download as PDF
amozie on DSK3GDR082PROD with NOTICES1
Federal Register / Vol. 83, No. 191 / Tuesday, October 2, 2018 / Notices
those participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before adjudicatory
documents are filed so that they can
obtain access to the documents via the
E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC’s Electronic Filing Help Desk
through the ‘‘Contact Us’’ link located
on the NRC’s Public Web site at https://
www.nrc.gov/site-help/esubmittals.html, by e-mail to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Electronic Filing Help Desk is available
between 9 a.m. and 6 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing stating why there is good cause for
not filing electronically and requesting
authorization to continue to submit
documents in paper format. Such filings
must be submitted by: (1) first class mail
addressed to the Office of the Secretary
of the Commission, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, Attention: Rulemaking
and Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
11555 Rockville Pike, Rockville,
Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing adjudicatory
documents in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
adams.nrc.gov/ehd, unless excluded
pursuant to an Order of the Commission
or the presiding officer. If you do not
have an NRC-issued digital ID certificate
as described above, click ‘‘Cancel’’
when the link requests certificates and
you will be automatically directed to the
VerDate Sep<11>2014
17:16 Oct 01, 2018
Jkt 247001
NRC’s electronic hearing dockets where
you will be able to access any publicly
available documents in a particular
hearing docket. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
personal phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. For example, in some
instances, individuals provide home
addresses in order to demonstrate
proximity to a facility or site. With
respect to copyrighted works, except for
limited excerpts that serve the purpose
of the adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held and designating the
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
If a person (other than Harman)
requests a hearing, that person shall set
forth with particularity the manner in
which his interest is adversely affected
by this Confirmatory Order and shall
address the criteria set forth in 10 CFR
2.309(d) and (f).
If a hearing is requested by a person
whose interest is adversely affected, the
Commission will issue an Order
designating the time and place of any
hearings. If a hearing is held, the issue
to be considered at such hearing shall be
whether this Confirmatory Order should
be sustained.
Pursuant to 10 CFR 2.202(c)(2)(i), any
person adversely affected by this Order,
may, in addition to demanding a
hearing, at the time the answer is filed
or sooner, move the presiding officer to
set aside the immediate effectiveness of
the Order on the ground that the Order,
including the need for immediate
effectiveness, is not based on adequate
evidence but on mere suspicion,
unfounded allegations, or error. In the
absence of any request for hearing, or
written approval of an extension of time
in which to request a hearing, the
provisions specified in Section V above
shall be final thirty (30) calendar days
from the date of issuance of this
Confirmatory Order without further
order or proceedings. If an extension of
time for requesting a hearing has been
approved, the provisions specified in
Section V shall be final when the
extension expires if a hearing request
has not been received.
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
49587
A request for hearing shall not stay the
effectiveness of this order.
For the Nuclear Regulatory Commission,
Anne T. Boland,
Director, Office of Enforcement.
Dated this 27th day of September 2018.
cc: The State of California
[FR Doc. 2018–21397 Filed 10–1–18; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2018–0199]
Applications and Amendments to
Facility Operating Licenses and
Combined Licenses Involving
Proposed No Significant Hazards
Considerations and Containing
Sensitive Unclassified Non-Safeguards
Information and Safeguards
Information and Order Imposing
Procedures for Access to Sensitive
Unclassified Non-Safeguards
Information and Safeguards
Information
Nuclear Regulatory
Commission.
ACTION: License amendment request;
opportunity to comment, request a
hearing, and petition for leave to
intervene; order imposing procedures.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) received and is
considering approval of two amendment
requests. The amendment requests are
for Oconee Nuclear Station and Wolf
Creek Generating Station. For each
amendment request, the NRC proposes
to determine that they involve no
significant hazards consideration.
Because the amendment requests
contain sensitive unclassified nonsafeguards information (SUNSI) and
safeguards information (SGI) an order
imposes procedures to obtain access to
SUNSI and SGI for contention
preparation.
DATES: Comments must be filed by
November 1, 2018. A request for a
hearing must be filed by December 3,
2018. Any potential party as defined in
§ 2.4 of title 10 of the Code of Federal
Regulations (10 CFR), who believes
access to SUNSI and/or SGI is necessary
to respond to this notice must request
document access by October 12, 2018.
ADDRESSES: You may submit comments
by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0199. Address
questions about NRC DOCKET ID in
Regulations.gov to Jennifer Borges;
telephone: 301–287–9127; email:
SUMMARY:
E:\FR\FM\02OCN1.SGM
02OCN1
49588
Federal Register / Vol. 83, No. 191 / Tuesday, October 2, 2018 / Notices
Jennifer.Borges@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• Mail comments to: May Ma, Office
of Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Lynn Ronewicz, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
7996, email: Lynn.Ronewicz@nrc.gov.
SUPPLEMENTARY INFORMATION:
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
I. Obtaining Information and
Submitting Comments
II. Background
amozie on DSK3GDR082PROD with NOTICES1
A. Obtaining Information
Please refer to Docket ID NRC–2018–
0199, facility name, unit number(s),
plant docket number, application date,
and subject when contacting the NRC
about the availability of information for
this action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal Rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0199.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced (if it is
available in ADAMS) is provided the
first time that it is mentioned in this
document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2018–
0199, facility name, unit number(s),
plant docket number, application date,
and subject in your comment
submission.
The NRC cautions you not to include
identifying or contact information that
VerDate Sep<11>2014
17:16 Oct 01, 2018
Jkt 247001
Pursuant to Section 189a.(2) of the
Atomic Energy Act of 1954, as amended
(the Act), the NRC is publishing this
notice. The Act requires the
Commission to publish notice of any
amendments issued, or proposed to be
issued and grants the Commission the
authority to issue and make
immediately effective any amendment
to an operating license or combined
license, as applicable, upon a
determination by the Commission that
such amendment involves no significant
hazards consideration, notwithstanding
the pendency before the Commission of
a request for a hearing from any person.
This notice includes notices of
amendments containing SUNSI and/or
SGI.
III. Notice of Consideration of Issuance
of Amendments to Facility Operating
Licenses and Combined Licenses,
Proposed No Significant Hazards
Consideration Determination, and
Opportunity for a Hearing
The Commission has made a
proposed determination that the
following amendment requests involve
no significant hazards consideration.
Under the Commission’s regulations in
10 CFR 50.92, this means that operation
of the facility in accordance with the
proposed amendment would not (1)
involve a significant increase in the
probability or consequences of an
accident previously evaluated, or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated, or (3)
involve a significant reduction in a
margin of safety. The basis for this
proposed determination for each
amendment request is shown below.
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period if circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example,
in derating or shutdown of the facility.
If the Commission takes action prior to
the expiration of either the comment
period or the notice period, it will
publish a notice of issuance in the
Federal Register. If the Commission
makes a final no significant hazards
consideration determination, any
hearing will take place after issuance.
The Commission expects that the need
to take this action will occur very
infrequently.
A. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 60 days after the date of
publication of this notice, any persons
(petitioner) whose interest may be
affected by this action may file a request
for a hearing and petition for leave to
intervene (petition) with respect to the
action. Petitions shall be filed in
accordance with the Commission’s
‘‘Agency Rules of Practice and
Procedure’’ in 10 CFR part 2. Interested
persons should consult a current copy
of 10 CFR 2.309. The NRC’s regulations
are accessible electronically from the
NRC Library on the NRC’s website at
https://www.nrc.gov/reading-rm/doccollections/cfr/. Alternatively, a copy of
the regulations is available at the NRC’s
Public Document Room, located at One
White Flint North, Room O1–F21, 11555
Rockville Pike (first floor), Rockville,
Maryland 20852. If a petition is filed,
the Commission or a presiding officer
will rule on the petition and, if
appropriate, a notice of a hearing will be
issued.
As required by 10 CFR 2.309(d) the
petition should specifically explain the
reasons why intervention should be
permitted with particular reference to
the following general requirements for
standing: (1) The name, address, and
E:\FR\FM\02OCN1.SGM
02OCN1
amozie on DSK3GDR082PROD with NOTICES1
Federal Register / Vol. 83, No. 191 / Tuesday, October 2, 2018 / Notices
telephone number of the petitioner; (2)
the nature of the petitioner’s right under
the Act to be made a party to the
proceeding; (3) the nature and extent of
the petitioner’s property, financial, or
other interest in the proceeding; and (4)
the possible effect of any decision or
order which may be entered in the
proceeding on the petitioner’s interest.
In accordance with 10 CFR 2.309(f),
the petition must also set forth the
specific contentions which the
petitioner seeks to have litigated in the
proceeding. Each contention must
consist of a specific statement of the
issue of law or fact to be raised or
controverted. In addition, the petitioner
must provide a brief explanation of the
bases for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner must also
provide references to the specific
sources and documents on which the
petitioner intends to rely to support its
position on the issue. The petition must
include sufficient information to show
that a genuine dispute exists with the
applicant or licensee on a material issue
of law or fact. Contentions must be
limited to matters within the scope of
the proceeding. The contention must be
one which, if proven, would entitle the
petitioner to relief. A petitioner who
fails to satisfy the requirements at 10
CFR 2.309(f) with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene. Parties have the opportunity
to participate fully in the conduct of the
hearing with respect to resolution of
that party’s admitted contentions,
including the opportunity to present
evidence, consistent with the NRC’s
regulations, policies, and procedures.
Petitions must be filed no later than
60 days from the date of publication of
this notice. Petitions and motions for
leave to file new or amended
contentions that are filed after the
deadline will not be entertained absent
a determination by the presiding officer
that the filing demonstrates good cause
by satisfying the three factors in 10 CFR
2.309(c)(1)(i) through (iii). The petition
must be filed in accordance with the
filing instructions in the ‘‘Electronic
Submissions (E-Filing)’’ section of this
document.
A State, local governmental body,
Federally-recognized Indian Tribe, or
agency thereof, may submit a petition to
the Commission to participate as a party
under 10 CFR 2.309(h)(1). The petition
VerDate Sep<11>2014
17:16 Oct 01, 2018
Jkt 247001
should state the nature and extent of the
petitioner’s interest in the proceeding.
The petition should be submitted to the
Commission no later than 60 days from
the date of publication of this notice.
The petition must be filed in accordance
with the filing instructions in the
‘‘Electronic Submissions (E-Filing)’’
section of this document, and should
meet the requirements for petitions set
forth in this section. Alternatively, a
State, local governmental body,
Federally-recognized Indian Tribe, or
agency thereof may participate as a nonparty under 10 CFR 2.315(c).
If a hearing is granted, any person
who is not a party to the proceeding and
is not affiliated with or represented by
a party may, at the discretion of the
presiding officer, be permitted to make
a limited appearance pursuant to the
provisions of 10 CFR 2.315(a). A person
making a limited appearance may make
an oral or written statement of his or her
position on the issues but may not
otherwise participate in the proceeding.
A limited appearance may be made at
any session of the hearing or at any
prehearing conference, subject to the
limits and conditions as may be
imposed by the presiding officer. Details
regarding the opportunity to make a
limited appearance will be provided by
the presiding officer if such sessions are
scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing and petition for
leave to intervene (petition), any motion
or other document filed in the
proceeding prior to the submission of a
request for hearing or petition to
intervene, and documents filed by
interested governmental entities that
request to participate under 10 CFR
2.315(c), must be filed in accordance
with the NRC’s E-Filing rule (72 FR
49139; August 28, 2007, as amended at
77 FR 46562; August 3, 2012). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Detailed guidance on
making electronic submissions may be
found in the Guidance for Electronic
Submissions to the NRC and on the NRC
website at https://www.nrc.gov/site-help/
e-submittals.html. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
49589
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to (1) request a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
submissions and access the E-Filing
system for any proceeding in which it
is participating; and (2) advise the
Secretary that the participant will be
submitting a petition or other
adjudicatory document (even in
instances in which the participant, or its
counsel or representative, already holds
an NRC-issued digital ID certificate).
Based upon this information, the
Secretary will establish an electronic
docket for the hearing in this proceeding
if the Secretary has not already
established an electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public website at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. Once a participant
has obtained a digital ID certificate and
a docket has been created, the
participant can then submit
adjudicatory documents. Submissions
must be in Portable Document Format
(PDF). Additional guidance on PDF
submissions is available on the NRC’s
public website at https://www.nrc.gov/
site-help/electronic-sub-ref-mat.html. A
filing is considered complete at the time
the document is submitted through the
NRC’s E-Filing system. To be timely, an
electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the EFiling system time-stamps the document
and sends the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the document on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before adjudicatory
documents are filed so that they can
obtain access to the documents via the
E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC’s Electronic Filing Help Desk
through the ‘‘Contact Us’’ link located
on the NRC’s public website at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a toll-
E:\FR\FM\02OCN1.SGM
02OCN1
amozie on DSK3GDR082PROD with NOTICES1
49590
Federal Register / Vol. 83, No. 191 / Tuesday, October 2, 2018 / Notices
free call at 1–866–672–7640. The NRC
Electronic Filing Help Desk is available
between 9 a.m. and 6 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing stating why there is good cause for
not filing electronically and requesting
authorization to continue to submit
documents in paper format. Such filings
must be submitted by: (1) First class
mail addressed to the Office of the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemaking and Adjudications Staff; or
(2) courier, express mail, or expedited
delivery service to the Office of the
Secretary, 11555 Rockville Pike,
Rockville, Maryland 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing adjudicatory
documents in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
adams.nrc.gov/ehd, unless excluded
pursuant to an order of the Commission
or the presiding officer. If you do not
have an NRC-issued digital ID certificate
as described above, click cancel when
the link requests certificates and you
will be automatically directed to the
NRC’s electronic hearing dockets where
you will be able to access any publicly
available documents in a particular
hearing docket. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
personal phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. For example, in some
instances, individuals provide home
addresses in order to demonstrate
proximity to a facility or site. With
respect to copyrighted works, except for
limited excerpts that serve the purpose
of the adjudicatory filings and would
VerDate Sep<11>2014
17:16 Oct 01, 2018
Jkt 247001
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
For further details with respect to
these license amendment applications,
see the application for amendment
which is available for public inspection
in ADAMS and at the NRC’s PDR. For
additional direction on accessing
information related to this document,
see the ‘‘Accessing Information and
Submitting Comments’’ section of this
document.
Duke Energy Carolinas, LLC, Docket
Nos. 50–269, 50–270, and 50–287,
Oconee Nuclear Station, Units 1, 2, and
3, Oconee County, South Carolina
Date of amendment request: February
12, 2018, as supplemented by letter
dated August 8, 2018. Publicly-available
versions are in ADAMS under
Accession Nos. ML18046A080 and
ML18225A076, respectively.
Description of amendment request:
This amendment request contains
safeguards information (SGI). The
amendments would revise the Duke
Energy Physical Security Plan for
Oconee Nuclear Station to include
additional protective measures during a
specific infrequent short-term operating
state, including a modification that
provides additional access restriction.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed amendment makes changes
to the Duke Energy Physical Security Plan
(PSP) for Oconee Nuclear Station that
include additional protective measures
during a specific infrequent short-term
operating state as well as a modification that
provides additional access restriction. The
proposed changes do not modify the reactor
coolant system (RCS) pressure boundary, nor
make any physical changes to the facility
design, material, or construction standards.
The proposed changes do not adversely affect
the operation of any safety-related System,
Structure, or Component (SSC) or the ability
of any safety-related SSC to perform its
designed safety function. The probability of
a credited design basis accident (DBA) is not
affected by this change, nor are the
consequences of any credited DBA affected
by this change.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
Response: No.
The proposed amendment makes changes
to the Duke Energy PSP for Oconee Nuclear
Station that include additional protective
measures during a specific infrequent shortterm operating state as well as a modification
that provides additional access restriction.
These proposed changes do not alter the
plant configuration (no new or different type
of equipment will be installed) or make
changes in methods governing normal plant
operation. The proposed changes do not
adversely affect the operation of any safetyrelated SSC or the ability of any safetyrelated SSC to perform its designed safety
function. The physical change being
proposed does not introduce a new failure
mode that would inhibit any safety-related
SSC from performing its safety function.
Therefore, the possibility of a new or
different kind of accident from any kind of
accident previously evaluated is not created.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed amendment makes changes
to the Duke Energy PSP for Oconee Nuclear
Station that include additional protective
measures during a specific infrequent shortterm operating state as well as a modification
that provides additional access restriction.
These proposed PSP changes do not involve:
(1) A physical alteration of the Oconee Units;
(2) the installation of new or different
equipment associated with plant operations;
or (3) any impact on the fission product
barriers or safety limits. Therefore, the
proposed changes do not involve a
significant reduction in a margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Kate Nolan,
Deputy General Counsel, Duke Energy
Carolinas, 550 South Tryon Street,
Charlotte, North Carolina 28202.
NRC Branch Chief: Michael T.
Markley.
Wolf Creek Nuclear Operating
Corporation, Docket No. 50–482, Wolf
Creek Generating Station (WCGS),
Coffey County, Kansas
Date of amendment request: January
17, 2017, as supplemented by letters
dated March 22, May 4, July 13, October
18, and November 14, 2017; and January
15, January 29, April 19, June 19, and
August 9, 2018. Publicly-available
versions are in ADAMS under
Accession Nos. ML17054C103,
ML17088A635, ML17130A915,
ML17200C939, ML17297A478,
ML17325A982, ML18024A477,
ML18033B024, ML18114A115,
ML18177A198, and ML18232A058,
respectively.
E:\FR\FM\02OCN1.SGM
02OCN1
Federal Register / Vol. 83, No. 191 / Tuesday, October 2, 2018 / Notices
amozie on DSK3GDR082PROD with NOTICES1
Description of amendment request:
This amendment request contains
sensitive unclassified non-safeguards
information (SUNSI). The proposed
amendment would revise the WCGS
Technical Specification (TSs) to replace
the existing Wolf Creek Nuclear
Operating Corporation methodology for
performing core design, non-loss-ofcoolant-accident (non-LOCA) and LOCA
safety analyses (for Post-LOCA
Subcriticality and Cooling only) with
standard Westinghouse developed and
NRC-approved analysis methodologies
at WCGS.
In addition, the proposed amendment
would revise the WCGS licensing basis
by adopting the alternative source term
(AST) as described in Regulatory Guide
(RG) 1.183, ‘‘Alternative Radiological
Source Terms for Evaluating Design
Basis Accidents at Nuclear Power
Reactors,’’ dated July 2000 (ADAMS
Accession No. ML003716792).
This notice is being reissued in its
entirety due to the revised scope of the
license amendment request resulting
from supplements dated July 13,
October 18, and November 14, 2017;
and January 15, January 29, April 19,
June 19, and August 9, 2018. The
proposed no significant hazards
consideration determination is identical
to the one published in the Federal
Register on July 5, 2017 (82 FR 31084).
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The new core design, non-LOCA and PostLOCA Subcriticality and Cooling analyses
and resulting TS changes will continue to
ensure the applicable safety limits are not
exceeded during any conditions of normal
operation, for design basis accidents (DBAs)
as well as any Anticipated Operational
Occurrence (AOO). The methods used to
perform the affected safety analyses are based
on methods previously found acceptable by
the NRC and conform to applicable
regulatory guidance. Application of these
NRC approved methods will continue to
ensure that acceptable operating limits are
established to protect the integrity of the RCS
and fuel cladding during normal operation,
DBAs, and any AOOs. The requested TS
changes proposed to conform to the new
methodologies do not involve any
operational changes that could affect system
reliability, performance, or the possibility of
operator error. The proposed changes do not
affect any postulated accident precursors, or
accident mitigation systems, and do not
VerDate Sep<11>2014
17:16 Oct 01, 2018
Jkt 247001
introduce any new accident initiation
mechanisms.
Adoptions of the AST and pursuant TS
changes and the changes to the atmospheric
dispersion factors have no impact to the
initiation of DBAs. Once the occurrence of an
accident has been postulated, the new
accident source term and atmospheric
dispersion factors are an input to analyses
that evaluate the radiological consequences.
The proposed changes do not involve a
revision to the design or manner in which the
facility is operated that could increase the
probability of an accident previously
evaluated in Chapter 15 of the Updated
Safety Analysis Report (USAR).
The structures, systems and components
affected by the proposed changes act to
mitigate the consequences of accidents.
Based on the AST analyses, the proposed
changes do revise certain performance
requirements; however, the proposed
changes do not involve a revision to the
parameters or conditions that could
contribute to the initiation of an accident
previously discussed in Chapter 15 of the
USAR. Plant specific radiological analyses
have been performed using the AST
methodology and new atmospheric
dispersion factors. Based on the results of
these analyses, it has been demonstrated that
the control room dose consequences of the
limiting events considered in the analyses
meet the regulatory guidance provided for
use with the AST, and the offsite doses are
within acceptable limits. This guidance is
presented in 10 CFR 50.67 [‘‘Accident source
term’’] and RG 1.183.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any previously evaluated?
Response: No.
Implementation of the new core design,
non-LOCA and Post-LOCA Subcriticality and
Cooling analyses and resulting TS changes do
not alter or involve any design basis accident
initiators and do not involve a physical
alteration of the plant (no new or different
type of equipment will be installed). The
proposed change does not adversely affect
the design function or mode of operations of
structures, systems and components in the
facility important to safety. The structures,
systems and components important to safety
will continue to operate in the same manner
as before, therefore, no new failure modes are
created by this proposed change. As such, the
proposed change does not create any new
failure modes for existing equipment or any
new limiting single failures. Additionally the
proposed change does not involve a change
in the methods governing normal plant
operation and all safety functions will
continue to perform as previously assumed
in accident analyses. Thus, the proposed
change does not adversely affect the design
function or operation of any structures,
systems, and components important to safety.
The proposed change does not involve
changing any accident initiators.
Implementation of AST and the associated
proposed TS changes and new atmospheric
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
49591
dispersion factors do not alter or involve any
design basis accident initiators. A design
modification will be implemented in support
of the proposed AST change that will
eliminate the need for local operator action
to isolate a failed CREVS [control room
emergency ventilation system] train. The
proposed change does not adversely affect
the design function or mode of operations of
structures, systems and components in the
facility important to safety. The structures,
systems and components important to safety
will continue to function in the same manner
as before after the AST is implemented.
Therefore, no new failure modes are created
by this proposed change.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed methodology and TS
changes will not adversely affect the
operation of plant equipment or the function
of equipment assumed in the accident
analysis. The proposed changes do not
adversely affect the design and performance
of the structures, systems, and components
important to safety. Therefore, the required
safety functions will continue to be
performed consistent with the assumptions
of the applicable safety analyses. In addition,
operation in accordance with the proposed
TS change will continue to ensure that the
previously evaluated accidents will be
mitigated as analyzed. The NRC approved
safety analysis methodologies include
restrictions on the choice of inputs, the
degree of conservatism inherent in the
calculations, and specified event acceptance
criteria. Analyses performed in accordance
with these methodologies will not result in
adverse effects on the regulated margin of
safety. As such, there is no significant
reduction in a margin of safety.
The results of the AST analyses are subject
to the acceptance criteria in 10 CFR 50.67.
The analyzed events have been carefully
selected, and the analyses supporting these
changes have been performed using approved
methodologies to ensure that analyzed events
are bounding and safety margin has not been
reduced. The dose consequences of these
limiting events are within the acceptance
criteria presented in 10 CFR 50.67 and RG
1.183. Thus, by meeting the applicable
regulatory limits for AST, there is no
significant reduction in a margin of safety.
New control room atmospheric dispersion
factors (X/Qs) based on site specific
meteorological data, calculated in accordance
with the guidance of RG 1.194, utilize more
recent data and improved calculation
methodologies.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
E:\FR\FM\02OCN1.SGM
02OCN1
49592
Federal Register / Vol. 83, No. 191 / Tuesday, October 2, 2018 / Notices
amozie on DSK3GDR082PROD with NOTICES1
amendment request involves no
significant hazards consideration.
Attorney for licensee: Jay Silberg,
Pillsbury Winthrop Shaw Pittman LLP,
2300 N Street NW, Washington, DC
20037.
NRC Branch Chief: Robert J.
Pascarelli.
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information and Safeguards
Information for Contention Preparation
Duke Energy Carolinas, LLC, Docket
Nos. 50–269, 50–270, and 50–287,
Oconee Nuclear Station, Units 1, 2, and
3, Oconee County, South Carolina Wolf
Creek Nuclear Operating Corporation,
Docket No. 50–482, Wolf Creek
Generating Station, Coffey County,
Kansas
A. This Order contains instructions
regarding how potential parties to this
proceeding may request access to
documents containing sensitive
unclassified information (including
Sensitive Unclassified Non-Safeguards
Information (SUNSI) and Safeguards
Information (SGI)). Requirements for
access to SGI are primarily set forth in
10 CFR parts 2 and 73. Nothing in this
Order is intended to conflict with the
SGI regulations.
B. Within 10 days after publication of
this notice of hearing and opportunity to
petition for leave to intervene, any
potential party who believes access to
SUNSI or SGI is necessary to respond to
this notice may request access to SUNSI
or SGI. A ‘‘potential party’’ is any
person who intends to participate as a
party by demonstrating standing and
filing an admissible contention under 10
CFR 2.309. Requests for access to SUNSI
or SGI submitted later than 10 days after
publication will not be considered
absent a showing of good cause for the
late filing, addressing why the request
could not have been filed earlier.
C. The requestor shall submit a letter
requesting permission to access SUNSI,
SGI, or both to the Office of the
Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy
to the Deputy General Counsel for
Hearings and Administration, Office of
the General Counsel, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001. The expedited delivery
or courier mail address for both offices
is: U.S. Nuclear Regulatory Commission,
11555 Rockville Pike, Rockville,
Maryland 20852. The email address for
the Office of the Secretary and the
Office of the General Counsel are
Hearing.Docket@nrc.gov and
RidsOgcMailCenter.Resource@nrc.gov,
VerDate Sep<11>2014
17:16 Oct 01, 2018
Jkt 247001
respectively.1 The request must include
the following information:
(1) A description of the licensing
action with a citation to this Federal
Register notice;
(2) The name and address of the
potential party and a description of the
potential party’s particularized interest
that could be harmed by the action
identified in C.(1);
(3) If the request is for SUNSI, the
identity of the individual or entity
requesting access to SUNSI and the
requestor’s basis for the need for the
information in order to meaningfully
participate in this adjudicatory
proceeding. In particular, the request
must explain why publicly available
versions of the information requested
would not be sufficient to provide the
basis and specificity for a proffered
contention; and
(4) If the request is for SGI, the
identity of each individual who would
have access to SGI if the request is
granted, including the identity of any
expert, consultant, or assistant who will
aid the requestor in evaluating the SGI.
In addition, the request must contain
the following information:
(a) A statement that explains each
individual’s ‘‘need to know’’ the SGI, as
required by 10 CFR 73.2 and 10 CFR
73.22(b)(1). Consistent with the
definition of ‘‘need to know’’ as stated
in 10 CFR 73.2, the statement must
explain:
(i) Specifically why the requestor
believes that the information is
necessary to enable the requestor to
proffer and/or adjudicate a specific
contention in this proceeding; 2 and
(ii) The technical competence
(demonstrable knowledge, skill, training
or education) of the requestor to
effectively utilize the requested SGI to
provide the basis and specificity for a
proffered contention. The technical
competence of a potential party or its
counsel may be shown by reliance on a
qualified expert, consultant, or assistant
who satisfies these criteria.
(b) A completed Form SF–85,
‘‘Questionnaire for Non-Sensitive
Positions,’’ for each individual who
1 While a request for hearing or petition to
intervene in this proceeding must comply with the
filing requirements of the NRC’s ‘‘E-Filing Rule,’’
the initial request to access SUNSI and/or SGI
under these procedures should be submitted as
described in this paragraph.
2 Broad SGI requests under these procedures are
unlikely to meet the standard for need to know;
furthermore, NRC staff redaction of information
from requested documents before their release may
be appropriate to comport with this requirement.
These procedures do not authorize unrestricted
disclosure or less scrutiny of a requestor’s need to
know than ordinarily would be applied in
connection with an already-admitted contention or
non-adjudicatory access to SGI.
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
would have access to SGI. The
completed Form SF–85 will be used by
the Office of Administration to conduct
the background check required for
access to SGI, as required by 10 CFR
part 2, subpart C, and 10 CFR
73.22(b)(2), to determine the requestor’s
trustworthiness and reliability. For
security reasons, Form SF–85 can only
be submitted electronically through the
electronic questionnaire for
investigations processing (e-QIP)
website, a secure website that is owned
and operated by the Office of Personnel
Management. To obtain online access to
the form, the requestor should contact
the NRC’s Office of Administration at
301–415–3710.3
(c) A completed Form FD–258
(fingerprint card), signed in original ink,
and submitted in accordance with 10
CFR 73.57(d). Copies of Form FD–258
may be obtained by writing the Office of
Administrative Services, Mail Services
Center, Mail Stop P1–37, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, or by email to
MAILSVC.Resource@nrc.gov. The
fingerprint card will be used to satisfy
the requirements of 10 CFR part 2,
subpart C, 10 CFR 73.22(b)(1), and
Section 149 of the Atomic Energy Act of
1954, as amended, which mandates that
all persons with access to SGI must be
fingerprinted for an FBI identification
and criminal history records check.
(d) A check or money order payable
in the amount of $324.00 4 to the U.S.
Nuclear Regulatory Commission for
each individual for whom the request
for access has been submitted.
(e) If the requestor or any
individual(s) who will have access to
SGI believes they belong to one or more
of the categories of individuals that are
exempt from the criminal history
records check and background check
requirements in 10 CFR 73.59, the
requestor should also provide a
statement identifying which exemption
the requestor is invoking and explaining
the requestor’s basis for believing that
the exemption applies. While
processing the request, the Office of
Administration, Personnel Security
Branch, will make a final determination
whether the claimed exemption applies.
Alternatively, the requestor may contact
the Office of Administration for an
evaluation of their exemption status
3 The requestor will be asked to provide his or her
full name, social security number, date and place
of birth, telephone number, and email address.
After providing this information, the requestor
usually should be able to obtain access to the online
form within one business day.
4 This fee is subject to change pursuant to the
Office of Personnel Management’s adjustable billing
rates.
E:\FR\FM\02OCN1.SGM
02OCN1
Federal Register / Vol. 83, No. 191 / Tuesday, October 2, 2018 / Notices
prior to submitting their request.
Persons who are exempt from the
background check are not required to
complete the SF–85 or Form FD–258;
however, all other requirements for
access to SGI, including the need to
know, are still applicable.
amozie on DSK3GDR082PROD with NOTICES1
Note: Copies of documents and materials
required by paragraphs C.(4)(b), (c), and (d)
of this Order must be sent to the following
address: U.S. Nuclear Regulatory
Commission, ATTN: Personnel Security
Branch, Mail Stop TWFN–03–B46M, 11555
Rockville Pike, Rockville, MD 20852. These
documents and materials should not be
included with the request letter to the Office
of the Secretary, but the request letter should
state that the forms and fees have been
submitted as required.
D. To avoid delays in processing
requests for access to SGI, the requestor
should review all submitted materials
for completeness and accuracy
(including legibility) before submitting
them to the NRC. The NRC will return
incomplete packages to the sender
without processing.
E. Based on an evaluation of the
information submitted under paragraphs
C.(3) or C.(4) above, as applicable, the
NRC staff will determine within 10 days
of receipt of the request whether:
(1) There is a reasonable basis to
believe the petitioner is likely to
establish standing to participate in this
NRC proceeding; and
(2) The requestor has established a
legitimate need for access to SUNSI or
need to know the SGI requested.
F. For requests for access to SUNSI, if
the NRC staff determines that the
requestor satisfies both E.(1) and E.(2)
above, the NRC staff will notify the
requestor in writing that access to
SUNSI has been granted. The written
notification will contain instructions on
how the requestor may obtain copies of
the requested documents, and any other
conditions that may apply to access to
those documents. These conditions may
include, but are not limited to, the
signing of a Non-Disclosure Agreement
or Affidavit, or Protective Order setting
forth terms and conditions to prevent
the unauthorized or inadvertent
disclosure of SUNSI by each individual
who will be granted access to SUNSI.5
G. For requests for access to SGI, if the
NRC staff determines that the requestor
has satisfied both E.(1) and E.(2) above,
the Office of Administration will then
determine, based upon completion of
the background check, whether the
proposed recipient is trustworthy and
reliable, as required for access to SGI by
10 CFR 73.22(b). If the Office of
Administration determines that the
individual or individuals are
trustworthy and reliable, the NRC will
promptly notify the requestor in writing.
The notification will provide the names
of approved individuals as well as the
conditions under which the SGI will be
provided. Those conditions may
include, but are not limited to, the
signing of a Non-Disclosure Agreement
or Affidavit, or Protective Order 6 by
each individual who will be granted
access to SGI.
H. Release and Storage of SGI. Prior
to providing SGI to the requestor, the
NRC staff will conduct (as necessary) an
inspection to confirm that the
recipient’s information protection
system is sufficient to satisfy the
requirements of 10 CFR 73.22.
Alternatively, recipients may opt to
view SGI at an approved SGI storage
location rather than establish their own
SGI protection program to meet SGI
protection requirements.
I. Filing of Contentions. Any
contentions in these proceedings that
are based upon the information received
as a result of the request made for
SUNSI or SGI must be filed by the
requestor no later than 25 days after
receipt of (or access to) that information.
However, if more than 25 days remain
between the petitioner’s receipt of (or
access to) the information and the
deadline for filing all other contentions
(as established in the notice of hearing
or opportunity for hearing), the
petitioner may file its SUNSI or SGI
contentions by that later deadline.
J. Review of Denials of Access.
(1) If the request for access to SUNSI
or SGI is denied by the NRC staff either
after a determination on standing and
requisite need, or after a determination
on trustworthiness and reliability, the
NRC staff shall immediately notify the
requestor in writing, briefly stating the
reason or reasons for the denial.
(2) Before the Office of
Administration makes a final adverse
determination regarding the
trustworthiness and reliability of the
proposed recipient(s) for access to SGI,
the Office of Administration, in
accordance with 10 CFR 2.336(f)(1)(iii),
must provide the proposed recipient(s)
any records that were considered in the
trustworthiness and reliability
6 Any
5 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must
be filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
yet been designated, within 30 days of the deadline
for the receipt of the written access request.
VerDate Sep<11>2014
17:16 Oct 01, 2018
Jkt 247001
motion for Protective Order or draft NonDisclosure Agreement or Affidavit for SGI must be
filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
yet been designated, within 180 days of the
deadline for the receipt of the written access
request.
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
49593
determination, including those required
to be provided under 10 CFR
73.57(e)(1), so that the proposed
recipient(s) have an opportunity to
correct or explain the record.
(3) The requestor may challenge the
NRC staff’s adverse determination with
respect to access to SUNSI or with
respect to standing or need to know for
SGI by filing a challenge within 5 days
of receipt of that determination with: (a)
The presiding officer designated in this
proceeding; (b) if no presiding officer
has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an Administrative Law Judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
(4) The requestor may challenge the
Office of Administration’s final adverse
determination with respect to
trustworthiness and reliability for access
to SGI by filing a request for review in
accordance with 10 CFR 2.336(f)(1)(iv).
(5) Further appeals of decisions under
this paragraph must be made pursuant
to 10 CFR 2.311.
K. Review of Grants of Access. A
party other than the requestor may
challenge an NRC staff determination
granting access to SUNSI whose release
would harm that party’s interest
independent of the proceeding. Such a
challenge must be filed within 5 days of
the notification by the NRC staff of its
grant of access and must be filed with:
(a) The presiding officer designated in
this proceeding; (b) if no presiding
officer has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an Administrative Law Judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
If challenges to the NRC staff
determinations are filed, these
procedures give way to the normal
process for litigating disputes
concerning access to information. The
availability of interlocutory review by
the Commission of orders ruling on
such NRC staff determinations (whether
granting or denying access) is governed
by 10 CFR 2.311.7
L. The Commission expects that the
NRC staff and presiding officers (and
7 Requestors should note that the filing
requirements of the NRC’s E-Filing Rule (72 FR
49139; August 28, 2007, as amended at 77 FR
46562; August 3, 2012) apply to appeals of NRC
staff determinations (because they must be served
on a presiding officer or the Commission, as
applicable), but not to the initial SUNSI/SGI request
submitted to the NRC staff under these procedures.
E:\FR\FM\02OCN1.SGM
02OCN1
49594
Federal Register / Vol. 83, No. 191 / Tuesday, October 2, 2018 / Notices
any other reviewing officers) will
consider and resolve requests for access
to SUNSI or SGI, and motions for
protective orders, in a timely fashion in
order to minimize any unnecessary
delays in identifying those petitioners
who have standing and who have
propounded contentions meeting the
specificity and basis requirements in 10
CFR part 2. The attachment to this
Order summarizes the general target
schedule for processing and resolving
requests under these procedures.
It Is So Ordered.
Dated at Rockville, Maryland, this 12th of
September 2018.
Attachment 1—General Target
Schedule for Processing and Resolving
Requests for Access to Sensitive
Unclassified Non-Safeguards
Information and Safeguards
Information in This Proceeding
Day
Event/activity
0 ........................
Publication of Federal Register notice of hearing and opportunity to petition for leave to intervene, including order with instructions for access requests.
Deadline for submitting requests for access to Sensitive Unclassified Non Safeguards Information (SUNSI) and/or Safeguards
Information (SGI) with information: Supporting the standing of a potential party identified by name and address; describing
the need for the information in order for the potential party to participate meaningfully in an adjudicatory proceeding; demonstrating that access should be granted (e.g., showing technical competence for access to SGI); and, for SGI, including
application fee for fingerprint/background check.
Deadline for submitting petition for intervention containing: (i) Demonstration of standing; (ii) all contentions whose formulation
does not require access to SUNSI and/or SGI (+25 Answers to petition for intervention; +7 requestor/petitioner reply).
U.S. Nuclear Regulatory Commission (NRC) staff informs the requestor of the staff’s determination whether the request for
access provides a reasonable basis to believe standing can be established and shows (1) need for SUNSI or (2) need to
know for SGI. (For SUNSI, NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents). If
NRC staff makes the finding of need to know for SGI and likelihood of standing, NRC staff begins background check (including fingerprinting for a criminal history records check), information processing (preparation of redactions or review of redacted documents), and readiness inspections.
If NRC staff finds no ‘‘need,’’ no ‘‘need to know,’’ or no likelihood of standing, the deadline for requestor/petitioner to file a
motion seeking a ruling to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the
presiding officer (or Chief Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for
SUNSI, the deadline for any party to the proceeding whose interest independent of the proceeding would be harmed by the
release of the information to file a motion seeking a ruling to reverse the NRC staff’s grant of access.
Deadline for NRC staff reply to motions to reverse NRC staff determination(s).
(Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and
file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure
Agreement for SUNSI.
(Receipt +180) If NRC staff finds standing, need to know for SGI, and trustworthiness and reliability, deadline for NRC staff to
file motion for Protective Order and draft Non-disclosure Affidavit (or to make a determination that the proposed recipient of
SGI is not trustworthy or reliable). Note: Before the Office of Administration makes a final adverse determination regarding
access to SGI, the proposed recipient must be provided an opportunity to correct or explain information.
Deadline for petitioner to seek reversal of a final adverse NRC staff trustworthiness or reliability determination under 10 CFR
2.336(f)(1)(iv).
If access granted: Issuance of a decision by a presiding officer or other designated officer on motion for protective order for
access to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a final adverse determination by the NRC staff.
Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI and/or SGI consistent with decision issuing
the protective order.
Deadline for submission of contentions whose development depends upon access to SUNSI and/or SGI. However, if more
than 25 days remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other
contentions (as established in the notice of opportunity to request a hearing and petition for leave to intervene), the petitioner may file its SUNSI or SGI contentions by that later deadline.
(Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI and/or SGI.
(Answer receipt +7) Petitioner/Intervenor reply to answers.
Decision on contention admission.
10 ......................
60 ......................
20 ......................
25 ......................
30 ......................
40 ......................
190 ....................
205 ....................
A .......................
A + 3 .................
A + 28 ...............
A + 53 ...............
A + 60 ...............
>A + 60 .............
[FR Doc. 2018–20182 Filed 10–1–18; 8:45 am]
ACTION:
License renewal; issuance.
BILLING CODE 7590–01–P
The U.S. Nuclear Regulatory
Commission (NRC) is issuing a renewed
license to Power Resources, Inc. (PRI),
doing business as Cameco Resources, for
its Smith Ranch Highland project,
materials license SUA–1548. This
facility is located in Converse County,
Wyoming and has satellite facilities
located in Johnson, Campbell, Natrona,
and Freemont Counties, Wyoming. The
license authorizes PRI to possess
uranium source and byproduct material
SUMMARY:
NUCLEAR REGULATORY
COMMISSION
amozie on DSK3GDR082PROD with NOTICES1
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
[Docket No. 40–8964; NRC–2012–0214]
Power Resources Inc.; Smith Ranch
Highland
Nuclear Regulatory
Commission.
AGENCY:
VerDate Sep<11>2014
17:16 Oct 01, 2018
Jkt 247001
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
at Smith Ranch Highland and its
associated satellite facilities. In
addition, the license authorizes PRI to
operate its facilities as proposed in its
license renewal application, as
amended, and as prescribed in the
license. The renewed license expires on
September 26, 2028.
The license referenced in this
document is available on September 26,
2018.
DATES:
Please refer to Docket ID
NRC–2012–0214 when contacting the
ADDRESSES:
E:\FR\FM\02OCN1.SGM
02OCN1
Agencies
[Federal Register Volume 83, Number 191 (Tuesday, October 2, 2018)]
[Notices]
[Pages 49587-49594]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-20182]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2018-0199]
Applications and Amendments to Facility Operating Licenses and
Combined Licenses Involving Proposed No Significant Hazards
Considerations and Containing Sensitive Unclassified Non-Safeguards
Information and Safeguards Information and Order Imposing Procedures
for Access to Sensitive Unclassified Non-Safeguards Information and
Safeguards Information
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment request; opportunity to comment, request a
hearing, and petition for leave to intervene; order imposing
procedures.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) received and is
considering approval of two amendment requests. The amendment requests
are for Oconee Nuclear Station and Wolf Creek Generating Station. For
each amendment request, the NRC proposes to determine that they involve
no significant hazards consideration. Because the amendment requests
contain sensitive unclassified non-safeguards information (SUNSI) and
safeguards information (SGI) an order imposes procedures to obtain
access to SUNSI and SGI for contention preparation.
DATES: Comments must be filed by November 1, 2018. A request for a
hearing must be filed by December 3, 2018. Any potential party as
defined in Sec. 2.4 of title 10 of the Code of Federal Regulations (10
CFR), who believes access to SUNSI and/or SGI is necessary to respond
to this notice must request document access by October 12, 2018.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0199. Address
questions about NRC DOCKET ID in Regulations.gov to Jennifer Borges;
telephone: 301-287-9127; email:
[[Page 49588]]
[email protected]. For technical questions, contact the
individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Mail comments to: May Ma, Office of Administration, Mail
Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Lynn Ronewicz, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-7996, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2018-0199, facility name, unit
number(s), plant docket number, application date, and subject when
contacting the NRC about the availability of information for this
action. You may obtain publicly-available information related to this
action by any of the following methods:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0199.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced (if it is available in ADAMS) is provided the first
time that it is mentioned in this document.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2018-0199, facility name, unit
number(s), plant docket number, application date, and subject in your
comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Background
Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as
amended (the Act), the NRC is publishing this notice. The Act requires
the Commission to publish notice of any amendments issued, or proposed
to be issued and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license or combined
license, as applicable, upon a determination by the Commission that
such amendment involves no significant hazards consideration,
notwithstanding the pendency before the Commission of a request for a
hearing from any person.
This notice includes notices of amendments containing SUNSI and/or
SGI.
III. Notice of Consideration of Issuance of Amendments to Facility
Operating Licenses and Combined Licenses, Proposed No Significant
Hazards Consideration Determination, and Opportunity for a Hearing
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in 10 CFR 50.92, this means that operation
of the facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated, or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated,
or (3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for each amendment request is shown
below.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period if circumstances change during the 30-day comment
period such that failure to act in a timely way would result, for
example, in derating or shutdown of the facility. If the Commission
takes action prior to the expiration of either the comment period or
the notice period, it will publish a notice of issuance in the Federal
Register. If the Commission makes a final no significant hazards
consideration determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
A. Opportunity To Request a Hearing and Petition for Leave To Intervene
Within 60 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by this action may
file a request for a hearing and petition for leave to intervene
(petition) with respect to the action. Petitions shall be filed in
accordance with the Commission's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2. Interested persons should consult a
current copy of 10 CFR 2.309. The NRC's regulations are accessible
electronically from the NRC Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. Alternatively, a copy of
the regulations is available at the NRC's Public Document Room, located
at One White Flint North, Room O1-F21, 11555 Rockville Pike (first
floor), Rockville, Maryland 20852. If a petition is filed, the
Commission or a presiding officer will rule on the petition and, if
appropriate, a notice of a hearing will be issued.
As required by 10 CFR 2.309(d) the petition should specifically
explain the reasons why intervention should be permitted with
particular reference to the following general requirements for
standing: (1) The name, address, and
[[Page 49589]]
telephone number of the petitioner; (2) the nature of the petitioner's
right under the Act to be made a party to the proceeding; (3) the
nature and extent of the petitioner's property, financial, or other
interest in the proceeding; and (4) the possible effect of any decision
or order which may be entered in the proceeding on the petitioner's
interest.
In accordance with 10 CFR 2.309(f), the petition must also set
forth the specific contentions which the petitioner seeks to have
litigated in the proceeding. Each contention must consist of a specific
statement of the issue of law or fact to be raised or controverted. In
addition, the petitioner must provide a brief explanation of the bases
for the contention and a concise statement of the alleged facts or
expert opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to the specific sources and
documents on which the petitioner intends to rely to support its
position on the issue. The petition must include sufficient information
to show that a genuine dispute exists with the applicant or licensee on
a material issue of law or fact. Contentions must be limited to matters
within the scope of the proceeding. The contention must be one which,
if proven, would entitle the petitioner to relief. A petitioner who
fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene.
Parties have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that party's admitted
contentions, including the opportunity to present evidence, consistent
with the NRC's regulations, policies, and procedures.
Petitions must be filed no later than 60 days from the date of
publication of this notice. Petitions and motions for leave to file new
or amended contentions that are filed after the deadline will not be
entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in
accordance with the filing instructions in the ``Electronic Submissions
(E-Filing)'' section of this document.
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission no later
than 60 days from the date of publication of this notice. The petition
must be filed in accordance with the filing instructions in the
``Electronic Submissions (E-Filing)'' section of this document, and
should meet the requirements for petitions set forth in this section.
Alternatively, a State, local governmental body, Federally-recognized
Indian Tribe, or agency thereof may participate as a non-party under 10
CFR 2.315(c).
If a hearing is granted, any person who is not a party to the
proceeding and is not affiliated with or represented by a party may, at
the discretion of the presiding officer, be permitted to make a limited
appearance pursuant to the provisions of 10 CFR 2.315(a). A person
making a limited appearance may make an oral or written statement of
his or her position on the issues but may not otherwise participate in
the proceeding. A limited appearance may be made at any session of the
hearing or at any prehearing conference, subject to the limits and
conditions as may be imposed by the presiding officer. Details
regarding the opportunity to make a limited appearance will be provided
by the presiding officer if such sessions are scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing and petition for leave to intervene (petition), any
motion or other document filed in the proceeding prior to the
submission of a request for hearing or petition to intervene, and
documents filed by interested governmental entities that request to
participate under 10 CFR 2.315(c), must be filed in accordance with the
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR
46562; August 3, 2012). The E-Filing process requires participants to
submit and serve all adjudicatory documents over the internet, or in
some cases to mail copies on electronic storage media. Detailed
guidance on making electronic submissions may be found in the Guidance
for Electronic Submissions to the NRC and on the NRC website at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit
paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at [email protected], or by
telephone at 301-415-1677, to (1) request a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign submissions and access the E-Filing
system for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition or
other adjudicatory document (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a
digital ID certificate and a docket has been created, the participant
can then submit adjudicatory documents. Submissions must be in Portable
Document Format (PDF). Additional guidance on PDF submissions is
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the
time the document is submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
document on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before adjudicatory documents are
filed so that they can obtain access to the documents via the E-Filing
system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public website at https://www.nrc.gov/site-help/e-submittals.html, by
email to [email protected], or by a toll-
[[Page 49590]]
free call at 1-866-672-7640. The NRC Electronic Filing Help Desk is
available between 9 a.m. and 6 p.m., Eastern Time, Monday through
Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, 11555
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and
Adjudications Staff. Participants filing adjudicatory documents in this
manner are responsible for serving the document on all other
participants. Filing is considered complete by first-class mail as of
the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service. A presiding officer, having granted an
exemption request from using E-Filing, may require a participant or
party to use E-Filing if the presiding officer subsequently determines
that the reason for granting the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the
Commission or the presiding officer. If you do not have an NRC-issued
digital ID certificate as described above, click cancel when the link
requests certificates and you will be automatically directed to the
NRC's electronic hearing dockets where you will be able to access any
publicly available documents in a particular hearing docket.
Participants are requested not to include personal privacy information,
such as social security numbers, home addresses, or personal phone
numbers in their filings, unless an NRC regulation or other law
requires submission of such information. For example, in some
instances, individuals provide home addresses in order to demonstrate
proximity to a facility or site. With respect to copyrighted works,
except for limited excerpts that serve the purpose of the adjudicatory
filings and would constitute a Fair Use application, participants are
requested not to include copyrighted materials in their submission.
For further details with respect to these license amendment
applications, see the application for amendment which is available for
public inspection in ADAMS and at the NRC's PDR. For additional
direction on accessing information related to this document, see the
``Accessing Information and Submitting Comments'' section of this
document.
Duke Energy Carolinas, LLC, Docket Nos. 50-269, 50-270, and 50-287,
Oconee Nuclear Station, Units 1, 2, and 3, Oconee County, South
Carolina
Date of amendment request: February 12, 2018, as supplemented by
letter dated August 8, 2018. Publicly-available versions are in ADAMS
under Accession Nos. ML18046A080 and ML18225A076, respectively.
Description of amendment request: This amendment request contains
safeguards information (SGI). The amendments would revise the Duke
Energy Physical Security Plan for Oconee Nuclear Station to include
additional protective measures during a specific infrequent short-term
operating state, including a modification that provides additional
access restriction.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed amendment makes changes to the Duke Energy Physical
Security Plan (PSP) for Oconee Nuclear Station that include
additional protective measures during a specific infrequent short-
term operating state as well as a modification that provides
additional access restriction. The proposed changes do not modify
the reactor coolant system (RCS) pressure boundary, nor make any
physical changes to the facility design, material, or construction
standards. The proposed changes do not adversely affect the
operation of any safety-related System, Structure, or Component
(SSC) or the ability of any safety-related SSC to perform its
designed safety function. The probability of a credited design basis
accident (DBA) is not affected by this change, nor are the
consequences of any credited DBA affected by this change.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed amendment makes changes to the Duke Energy PSP for
Oconee Nuclear Station that include additional protective measures
during a specific infrequent short-term operating state as well as a
modification that provides additional access restriction. These
proposed changes do not alter the plant configuration (no new or
different type of equipment will be installed) or make changes in
methods governing normal plant operation. The proposed changes do
not adversely affect the operation of any safety-related SSC or the
ability of any safety-related SSC to perform its designed safety
function. The physical change being proposed does not introduce a
new failure mode that would inhibit any safety-related SSC from
performing its safety function. Therefore, the possibility of a new
or different kind of accident from any kind of accident previously
evaluated is not created.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed amendment makes changes to the Duke Energy PSP for
Oconee Nuclear Station that include additional protective measures
during a specific infrequent short-term operating state as well as a
modification that provides additional access restriction. These
proposed PSP changes do not involve: (1) A physical alteration of
the Oconee Units; (2) the installation of new or different equipment
associated with plant operations; or (3) any impact on the fission
product barriers or safety limits. Therefore, the proposed changes
do not involve a significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Kate Nolan, Deputy General Counsel, Duke
Energy Carolinas, 550 South Tryon Street, Charlotte, North Carolina
28202.
NRC Branch Chief: Michael T. Markley.
Wolf Creek Nuclear Operating Corporation, Docket No. 50-482, Wolf Creek
Generating Station (WCGS), Coffey County, Kansas
Date of amendment request: January 17, 2017, as supplemented by
letters dated March 22, May 4, July 13, October 18, and November 14,
2017; and January 15, January 29, April 19, June 19, and August 9,
2018. Publicly-available versions are in ADAMS under Accession Nos.
ML17054C103, ML17088A635, ML17130A915, ML17200C939, ML17297A478,
ML17325A982, ML18024A477, ML18033B024, ML18114A115, ML18177A198, and
ML18232A058, respectively.
[[Page 49591]]
Description of amendment request: This amendment request contains
sensitive unclassified non-safeguards information (SUNSI). The proposed
amendment would revise the WCGS Technical Specification (TSs) to
replace the existing Wolf Creek Nuclear Operating Corporation
methodology for performing core design, non-loss-of-coolant-accident
(non-LOCA) and LOCA safety analyses (for Post-LOCA Subcriticality and
Cooling only) with standard Westinghouse developed and NRC-approved
analysis methodologies at WCGS.
In addition, the proposed amendment would revise the WCGS licensing
basis by adopting the alternative source term (AST) as described in
Regulatory Guide (RG) 1.183, ``Alternative Radiological Source Terms
for Evaluating Design Basis Accidents at Nuclear Power Reactors,''
dated July 2000 (ADAMS Accession No. ML003716792).
This notice is being reissued in its entirety due to the revised
scope of the license amendment request resulting from supplements dated
July 13, October 18, and November 14, 2017; and January 15, January 29,
April 19, June 19, and August 9, 2018. The proposed no significant
hazards consideration determination is identical to the one published
in the Federal Register on July 5, 2017 (82 FR 31084).
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The new core design, non-LOCA and Post-LOCA Subcriticality and
Cooling analyses and resulting TS changes will continue to ensure
the applicable safety limits are not exceeded during any conditions
of normal operation, for design basis accidents (DBAs) as well as
any Anticipated Operational Occurrence (AOO). The methods used to
perform the affected safety analyses are based on methods previously
found acceptable by the NRC and conform to applicable regulatory
guidance. Application of these NRC approved methods will continue to
ensure that acceptable operating limits are established to protect
the integrity of the RCS and fuel cladding during normal operation,
DBAs, and any AOOs. The requested TS changes proposed to conform to
the new methodologies do not involve any operational changes that
could affect system reliability, performance, or the possibility of
operator error. The proposed changes do not affect any postulated
accident precursors, or accident mitigation systems, and do not
introduce any new accident initiation mechanisms.
Adoptions of the AST and pursuant TS changes and the changes to
the atmospheric dispersion factors have no impact to the initiation
of DBAs. Once the occurrence of an accident has been postulated, the
new accident source term and atmospheric dispersion factors are an
input to analyses that evaluate the radiological consequences. The
proposed changes do not involve a revision to the design or manner
in which the facility is operated that could increase the
probability of an accident previously evaluated in Chapter 15 of the
Updated Safety Analysis Report (USAR).
The structures, systems and components affected by the proposed
changes act to mitigate the consequences of accidents. Based on the
AST analyses, the proposed changes do revise certain performance
requirements; however, the proposed changes do not involve a
revision to the parameters or conditions that could contribute to
the initiation of an accident previously discussed in Chapter 15 of
the USAR. Plant specific radiological analyses have been performed
using the AST methodology and new atmospheric dispersion factors.
Based on the results of these analyses, it has been demonstrated
that the control room dose consequences of the limiting events
considered in the analyses meet the regulatory guidance provided for
use with the AST, and the offsite doses are within acceptable
limits. This guidance is presented in 10 CFR 50.67 [``Accident
source term''] and RG 1.183.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any previously evaluated?
Response: No.
Implementation of the new core design, non-LOCA and Post-LOCA
Subcriticality and Cooling analyses and resulting TS changes do not
alter or involve any design basis accident initiators and do not
involve a physical alteration of the plant (no new or different type
of equipment will be installed). The proposed change does not
adversely affect the design function or mode of operations of
structures, systems and components in the facility important to
safety. The structures, systems and components important to safety
will continue to operate in the same manner as before, therefore, no
new failure modes are created by this proposed change. As such, the
proposed change does not create any new failure modes for existing
equipment or any new limiting single failures. Additionally the
proposed change does not involve a change in the methods governing
normal plant operation and all safety functions will continue to
perform as previously assumed in accident analyses. Thus, the
proposed change does not adversely affect the design function or
operation of any structures, systems, and components important to
safety. The proposed change does not involve changing any accident
initiators.
Implementation of AST and the associated proposed TS changes and
new atmospheric dispersion factors do not alter or involve any
design basis accident initiators. A design modification will be
implemented in support of the proposed AST change that will
eliminate the need for local operator action to isolate a failed
CREVS [control room emergency ventilation system] train. The
proposed change does not adversely affect the design function or
mode of operations of structures, systems and components in the
facility important to safety. The structures, systems and components
important to safety will continue to function in the same manner as
before after the AST is implemented. Therefore, no new failure modes
are created by this proposed change.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed methodology and TS changes will not adversely
affect the operation of plant equipment or the function of equipment
assumed in the accident analysis. The proposed changes do not
adversely affect the design and performance of the structures,
systems, and components important to safety. Therefore, the required
safety functions will continue to be performed consistent with the
assumptions of the applicable safety analyses. In addition,
operation in accordance with the proposed TS change will continue to
ensure that the previously evaluated accidents will be mitigated as
analyzed. The NRC approved safety analysis methodologies include
restrictions on the choice of inputs, the degree of conservatism
inherent in the calculations, and specified event acceptance
criteria. Analyses performed in accordance with these methodologies
will not result in adverse effects on the regulated margin of
safety. As such, there is no significant reduction in a margin of
safety.
The results of the AST analyses are subject to the acceptance
criteria in 10 CFR 50.67. The analyzed events have been carefully
selected, and the analyses supporting these changes have been
performed using approved methodologies to ensure that analyzed
events are bounding and safety margin has not been reduced. The dose
consequences of these limiting events are within the acceptance
criteria presented in 10 CFR 50.67 and RG 1.183. Thus, by meeting
the applicable regulatory limits for AST, there is no significant
reduction in a margin of safety. New control room atmospheric
dispersion factors (X/Qs) based on site specific meteorological
data, calculated in accordance with the guidance of RG 1.194,
utilize more recent data and improved calculation methodologies.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
[[Page 49592]]
amendment request involves no significant hazards consideration.
Attorney for licensee: Jay Silberg, Pillsbury Winthrop Shaw Pittman
LLP, 2300 N Street NW, Washington, DC 20037.
NRC Branch Chief: Robert J. Pascarelli.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information and Safeguards Information for Contention
Preparation Duke Energy Carolinas, LLC, Docket Nos. 50-269, 50-270, and
50-287, Oconee Nuclear Station, Units 1, 2, and 3, Oconee County, South
Carolina Wolf Creek Nuclear Operating Corporation, Docket No. 50-482,
Wolf Creek Generating Station, Coffey County, Kansas
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing sensitive
unclassified information (including Sensitive Unclassified Non-
Safeguards Information (SUNSI) and Safeguards Information (SGI)).
Requirements for access to SGI are primarily set forth in 10 CFR parts
2 and 73. Nothing in this Order is intended to conflict with the SGI
regulations.
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI or SGI is necessary to respond to this notice
may request access to SUNSI or SGI. A ``potential party'' is any person
who intends to participate as a party by demonstrating standing and
filing an admissible contention under 10 CFR 2.309. Requests for access
to SUNSI or SGI submitted later than 10 days after publication will not
be considered absent a showing of good cause for the late filing,
addressing why the request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to
access SUNSI, SGI, or both to the Office of the Secretary, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemakings and Adjudications Staff, and provide a copy to the Deputy
General Counsel for Hearings and Administration, Office of the General
Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
The expedited delivery or courier mail address for both offices is:
U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Rockville,
Maryland 20852. The email address for the Office of the Secretary and
the Office of the General Counsel are [email protected] and
[email protected], respectively.\1\ The request must
include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI and/or SGI
under these procedures should be submitted as described in this
paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1);
(3) If the request is for SUNSI, the identity of the individual or
entity requesting access to SUNSI and the requestor's basis for the
need for the information in order to meaningfully participate in this
adjudicatory proceeding. In particular, the request must explain why
publicly available versions of the information requested would not be
sufficient to provide the basis and specificity for a proffered
contention; and
(4) If the request is for SGI, the identity of each individual who
would have access to SGI if the request is granted, including the
identity of any expert, consultant, or assistant who will aid the
requestor in evaluating the SGI. In addition, the request must contain
the following information:
(a) A statement that explains each individual's ``need to know''
the SGI, as required by 10 CFR 73.2 and 10 CFR 73.22(b)(1). Consistent
with the definition of ``need to know'' as stated in 10 CFR 73.2, the
statement must explain:
(i) Specifically why the requestor believes that the information is
necessary to enable the requestor to proffer and/or adjudicate a
specific contention in this proceeding; \2\ and
---------------------------------------------------------------------------
\2\ Broad SGI requests under these procedures are unlikely to
meet the standard for need to know; furthermore, NRC staff redaction
of information from requested documents before their release may be
appropriate to comport with this requirement. These procedures do
not authorize unrestricted disclosure or less scrutiny of a
requestor's need to know than ordinarily would be applied in
connection with an already-admitted contention or non-adjudicatory
access to SGI.
---------------------------------------------------------------------------
(ii) The technical competence (demonstrable knowledge, skill,
training or education) of the requestor to effectively utilize the
requested SGI to provide the basis and specificity for a proffered
contention. The technical competence of a potential party or its
counsel may be shown by reliance on a qualified expert, consultant, or
assistant who satisfies these criteria.
(b) A completed Form SF-85, ``Questionnaire for Non-Sensitive
Positions,'' for each individual who would have access to SGI. The
completed Form SF-85 will be used by the Office of Administration to
conduct the background check required for access to SGI, as required by
10 CFR part 2, subpart C, and 10 CFR 73.22(b)(2), to determine the
requestor's trustworthiness and reliability. For security reasons, Form
SF-85 can only be submitted electronically through the electronic
questionnaire for investigations processing (e-QIP) website, a secure
website that is owned and operated by the Office of Personnel
Management. To obtain online access to the form, the requestor should
contact the NRC's Office of Administration at 301-415-3710.\3\
---------------------------------------------------------------------------
\3\ The requestor will be asked to provide his or her full name,
social security number, date and place of birth, telephone number,
and email address. After providing this information, the requestor
usually should be able to obtain access to the online form within
one business day.
---------------------------------------------------------------------------
(c) A completed Form FD-258 (fingerprint card), signed in original
ink, and submitted in accordance with 10 CFR 73.57(d). Copies of Form
FD-258 may be obtained by writing the Office of Administrative
Services, Mail Services Center, Mail Stop P1-37, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, or by email to
[email protected]. The fingerprint card will be used to satisfy
the requirements of 10 CFR part 2, subpart C, 10 CFR 73.22(b)(1), and
Section 149 of the Atomic Energy Act of 1954, as amended, which
mandates that all persons with access to SGI must be fingerprinted for
an FBI identification and criminal history records check.
(d) A check or money order payable in the amount of $324.00 \4\ to
the U.S. Nuclear Regulatory Commission for each individual for whom the
request for access has been submitted.
---------------------------------------------------------------------------
\4\ This fee is subject to change pursuant to the Office of
Personnel Management's adjustable billing rates.
---------------------------------------------------------------------------
(e) If the requestor or any individual(s) who will have access to
SGI believes they belong to one or more of the categories of
individuals that are exempt from the criminal history records check and
background check requirements in 10 CFR 73.59, the requestor should
also provide a statement identifying which exemption the requestor is
invoking and explaining the requestor's basis for believing that the
exemption applies. While processing the request, the Office of
Administration, Personnel Security Branch, will make a final
determination whether the claimed exemption applies. Alternatively, the
requestor may contact the Office of Administration for an evaluation of
their exemption status
[[Page 49593]]
prior to submitting their request. Persons who are exempt from the
background check are not required to complete the SF-85 or Form FD-258;
however, all other requirements for access to SGI, including the need
---------------------------------------------------------------------------
to know, are still applicable.
Note: Copies of documents and materials required by paragraphs
C.(4)(b), (c), and (d) of this Order must be sent to the following
address: U.S. Nuclear Regulatory Commission, ATTN: Personnel
Security Branch, Mail Stop TWFN-03-B46M, 11555 Rockville Pike,
Rockville, MD 20852. These documents and materials should not be
included with the request letter to the Office of the Secretary, but
the request letter should state that the forms and fees have been
submitted as required.
D. To avoid delays in processing requests for access to SGI, the
requestor should review all submitted materials for completeness and
accuracy (including legibility) before submitting them to the NRC. The
NRC will return incomplete packages to the sender without processing.
E. Based on an evaluation of the information submitted under
paragraphs C.(3) or C.(4) above, as applicable, the NRC staff will
determine within 10 days of receipt of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI or need to know the SGI requested.
F. For requests for access to SUNSI, if the NRC staff determines
that the requestor satisfies both E.(1) and E.(2) above, the NRC staff
will notify the requestor in writing that access to SUNSI has been
granted. The written notification will contain instructions on how the
requestor may obtain copies of the requested documents, and any other
conditions that may apply to access to those documents. These
conditions may include, but are not limited to, the signing of a Non-
Disclosure Agreement or Affidavit, or Protective Order setting forth
terms and conditions to prevent the unauthorized or inadvertent
disclosure of SUNSI by each individual who will be granted access to
SUNSI.\5\
---------------------------------------------------------------------------
\5\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
G. For requests for access to SGI, if the NRC staff determines that
the requestor has satisfied both E.(1) and E.(2) above, the Office of
Administration will then determine, based upon completion of the
background check, whether the proposed recipient is trustworthy and
reliable, as required for access to SGI by 10 CFR 73.22(b). If the
Office of Administration determines that the individual or individuals
are trustworthy and reliable, the NRC will promptly notify the
requestor in writing. The notification will provide the names of
approved individuals as well as the conditions under which the SGI will
be provided. Those conditions may include, but are not limited to, the
signing of a Non-Disclosure Agreement or Affidavit, or Protective Order
\6\ by each individual who will be granted access to SGI.
---------------------------------------------------------------------------
\6\ Any motion for Protective Order or draft Non- Disclosure
Agreement or Affidavit for SGI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 180 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
H. Release and Storage of SGI. Prior to providing SGI to the
requestor, the NRC staff will conduct (as necessary) an inspection to
confirm that the recipient's information protection system is
sufficient to satisfy the requirements of 10 CFR 73.22. Alternatively,
recipients may opt to view SGI at an approved SGI storage location
rather than establish their own SGI protection program to meet SGI
protection requirements.
I. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI or SGI must be filed by the requestor no later than 25 days
after receipt of (or access to) that information. However, if more than
25 days remain between the petitioner's receipt of (or access to) the
information and the deadline for filing all other contentions (as
established in the notice of hearing or opportunity for hearing), the
petitioner may file its SUNSI or SGI contentions by that later
deadline.
J. Review of Denials of Access.
(1) If the request for access to SUNSI or SGI is denied by the NRC
staff either after a determination on standing and requisite need, or
after a determination on trustworthiness and reliability, the NRC staff
shall immediately notify the requestor in writing, briefly stating the
reason or reasons for the denial.
(2) Before the Office of Administration makes a final adverse
determination regarding the trustworthiness and reliability of the
proposed recipient(s) for access to SGI, the Office of Administration,
in accordance with 10 CFR 2.336(f)(1)(iii), must provide the proposed
recipient(s) any records that were considered in the trustworthiness
and reliability determination, including those required to be provided
under 10 CFR 73.57(e)(1), so that the proposed recipient(s) have an
opportunity to correct or explain the record.
(3) The requestor may challenge the NRC staff's adverse
determination with respect to access to SUNSI or with respect to
standing or need to know for SGI by filing a challenge within 5 days of
receipt of that determination with: (a) The presiding officer
designated in this proceeding; (b) if no presiding officer has been
appointed, the Chief Administrative Judge, or if he or she is
unavailable, another administrative judge, or an Administrative Law
Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if another
officer has been designated to rule on information access issues, with
that officer.
(4) The requestor may challenge the Office of Administration's
final adverse determination with respect to trustworthiness and
reliability for access to SGI by filing a request for review in
accordance with 10 CFR 2.336(f)(1)(iv).
(5) Further appeals of decisions under this paragraph must be made
pursuant to 10 CFR 2.311.
K. Review of Grants of Access. A party other than the requestor may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed within 5 days of the notification by the
NRC staff of its grant of access and must be filed with: (a) The
presiding officer designated in this proceeding; (b) if no presiding
officer has been appointed, the Chief Administrative Judge, or if he or
she is unavailable, another administrative judge, or an Administrative
Law Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if
another officer has been designated to rule on information access
issues, with that officer.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\7\
---------------------------------------------------------------------------
\7\ Requestors should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007, as amended at 77
FR 46562; August 3, 2012) apply to appeals of NRC staff
determinations (because they must be served on a presiding officer
or the Commission, as applicable), but not to the initial SUNSI/SGI
request submitted to the NRC staff under these procedures.
---------------------------------------------------------------------------
L. The Commission expects that the NRC staff and presiding officers
(and
[[Page 49594]]
any other reviewing officers) will consider and resolve requests for
access to SUNSI or SGI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have propounded contentions
meeting the specificity and basis requirements in 10 CFR part 2. The
attachment to this Order summarizes the general target schedule for
processing and resolving requests under these procedures.
It Is So Ordered.
Dated at Rockville, Maryland, this 12th of September 2018.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards
Information and Safeguards Information in This Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0........................ Publication of Federal Register notice of
hearing and opportunity to petition for
leave to intervene, including order with
instructions for access requests.
10....................... Deadline for submitting requests for access
to Sensitive Unclassified Non Safeguards
Information (SUNSI) and/or Safeguards
Information (SGI) with information:
Supporting the standing of a potential party
identified by name and address; describing
the need for the information in order for
the potential party to participate
meaningfully in an adjudicatory proceeding;
demonstrating that access should be granted
(e.g., showing technical competence for
access to SGI); and, for SGI, including
application fee for fingerprint/background
check.
60....................... Deadline for submitting petition for
intervention containing: (i) Demonstration
of standing; (ii) all contentions whose
formulation does not require access to SUNSI
and/or SGI (+25 Answers to petition for
intervention; +7 requestor/petitioner
reply).
20....................... U.S. Nuclear Regulatory Commission (NRC)
staff informs the requestor of the staff's
determination whether the request for access
provides a reasonable basis to believe
standing can be established and shows (1)
need for SUNSI or (2) need to know for SGI.
(For SUNSI, NRC staff also informs any party
to the proceeding whose interest independent
of the proceeding would be harmed by the
release of the information.) If NRC staff
makes the finding of need for SUNSI and
likelihood of standing, NRC staff begins
document processing (preparation of
redactions or review of redacted documents).
If NRC staff makes the finding of need to
know for SGI and likelihood of standing, NRC
staff begins background check (including
fingerprinting for a criminal history
records check), information processing
(preparation of redactions or review of
redacted documents), and readiness
inspections.
25....................... If NRC staff finds no ``need,'' no ``need to
know,'' or no likelihood of standing, the
deadline for requestor/petitioner to file a
motion seeking a ruling to reverse the NRC
staff's denial of access; NRC staff files
copy of access determination with the
presiding officer (or Chief Administrative
Judge or other designated officer, as
appropriate). If NRC staff finds ``need''
for SUNSI, the deadline for any party to the
proceeding whose interest independent of the
proceeding would be harmed by the release of
the information to file a motion seeking a
ruling to reverse the NRC staff's grant of
access.
30....................... Deadline for NRC staff reply to motions to
reverse NRC staff determination(s).
40....................... (Receipt +30) If NRC staff finds standing and
need for SUNSI, deadline for NRC staff to
complete information processing and file
motion for Protective Order and draft Non-
Disclosure Affidavit. Deadline for applicant/
licensee to file Non-Disclosure Agreement
for SUNSI.
190...................... (Receipt +180) If NRC staff finds standing,
need to know for SGI, and trustworthiness
and reliability, deadline for NRC staff to
file motion for Protective Order and draft
Non-disclosure Affidavit (or to make a
determination that the proposed recipient of
SGI is not trustworthy or reliable). Note:
Before the Office of Administration makes a
final adverse determination regarding access
to SGI, the proposed recipient must be
provided an opportunity to correct or
explain information.
205...................... Deadline for petitioner to seek reversal of a
final adverse NRC staff trustworthiness or
reliability determination under 10 CFR
2.336(f)(1)(iv).
A........................ If access granted: Issuance of a decision by
a presiding officer or other designated
officer on motion for protective order for
access to sensitive information (including
schedule for providing access and submission
of contentions) or decision reversing a
final adverse determination by the NRC
staff.
A + 3.................... Deadline for filing executed Non-Disclosure
Affidavits. Access provided to SUNSI and/or
SGI consistent with decision issuing the
protective order.
A + 28................... Deadline for submission of contentions whose
development depends upon access to SUNSI and/
or SGI. However, if more than 25 days remain
between the petitioner's receipt of (or
access to) the information and the deadline
for filing all other contentions (as
established in the notice of opportunity to
request a hearing and petition for leave to
intervene), the petitioner may file its
SUNSI or SGI contentions by that later
deadline.
A + 53................... (Contention receipt +25) Answers to
contentions whose development depends upon
access to SUNSI and/or SGI.
A + 60................... (Answer receipt +7) Petitioner/Intervenor
reply to answers.
>A + 60.................. Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. 2018-20182 Filed 10-1-18; 8:45 am]