Combined Notice of Filings, 49077-49078 [2018-21128]
Download as PDF
Federal Register / Vol. 83, No. 189 / Friday, September 28, 2018 / Notices
wetland and riparian habitat and
wildlife; climate change; transportation;
recreation; land use; Tribal resources,
including Tribal treaty rights;
environmental health and safety, and
public services and utilities.
c. The Corps will serve as the lead
agency for compliance with NEPA. The
Corps has invited the U.S.
Environmental Protection Agency, the
Chehalis Tribe, and the Quinault Indian
Nation to serve as cooperating agencies
under NEPA. The Corps will consult
with the Washington State Historic
Preservation Officer and applicable
Tribes to comply with the National
Historic Preservation Act; and
applicable Tribes to comply with treaty
provisions.
d. Development of the draft EIS will
begin after the close of the scoping
period. The draft EIS is currently
scheduled to be available for public
review and comment in early 2020.
e. A 31-day public review period will
be provided for all interested parties,
individuals, and agencies to review and
comment on the draft EIS. All interested
parties are encouraged to respond to this
notice and provide a current address if
they wish to be notified when the draft
EIS is issued.
f. All comments received will become
part of the administrative record and are
subject to public release, as appropriate,
in their entirety, including any
personally identifiable information such
as names, phone numbers, and
addresses if included in the comment.
Dated: September 19, 2018.
Ryan A. Baum,
Major, Corps of Engineers, Acting
Commander.
[FR Doc. 2018–21154 Filed 9–27–18; 8:45 a.m.]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Army, Corps of
Engineers
Notice of Availability of the Final
Missouri River Recovery Management
Plan and Environmental Impact
Statement
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice; extension of final EIS
waiting period.
amozie on DSK3GDR082PROD with NOTICES1
AGENCY:
The Notice of Availability for
the Final Missouri River Recovery
Management Plan and Environmental
Impact Statement (MRRMP–FEIS)
published in the Federal Register on
Friday, August 31, 2018, stated the
waiting period for signature of the
SUMMARY:
VerDate Sep<11>2014
19:22 Sep 27, 2018
Jkt 244001
MRRMP–FEIS Record of Decision
would end on October 9, 2018. The U.S.
Army Corps of Engineers is extending
the waiting period through October 22,
2018.
FOR FURTHER INFORMATION CONTACT:
Tiffany Vanosdall, U.S. Army Corps of
Engineers at (402) 995–2695 or by email
at tiffany.k.vanosdall@usace.army.mil.
SUPPLEMENTARY INFORMATION: The
MRRMP–FEIS can be downloaded
online at: https://www.nwo.
usace.army.mil/mrrp/mgmt-plan/ or at:
https://parkplanning.nps.gov/MRRMP.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 2018–21155 Filed 9–27–18; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–203–000]
Notice of Complaint; Owensboro
Municipal Utilities v. Louisville Gas
and Electric Company, Kentucky
Utilities Company
Take notice that on September 21,
2018, pursuant to sections 206, 306,
309, and 316 1 of the Federal Power Act
and Rule 206 of the Federal Energy
Regulatory Commission’s (Commission)
Rules of Practice and Procedure,2
Owensboro Municipal Utilities
(Complainant) filed a formal complaint
against Louisville Gas and Electric
Company and Kentucky Utilities
Company, (Respondents) alleging that,
from February 1, 2018 forward,
Respondents violated and continue to
violate its joint obligation, under First
Revised Rate Schedule No. 402 to
reimburse Complainant for pancaked
transmission service charges incurred to
Drive-Out from the Midcontinent
Independent System Operator, all as
more fully explained in the complaint.
The Complainants certify that copies
of the Complaint were served on
contacts for Respondents.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
1 16
2 18
PO 00000
U.S.C. 825e, 824e, 825h, and 825o.
CFR 385.206.
Frm 00030
Fmt 4703
Sfmt 4703
49077
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 11, 2018.
Dated: September 24, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–21129 Filed 9–27–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18–82–000.
Applicants: Banquete Hub LLC.
Description: Tariff filing per
284.123(b),(e)/: Baseline Filing—
Banquete Hub SOC and the Errata to be
effective 10/1/2018.
Filed Date: 9/19/18.
Accession Number: 201809195092.
Comments/Protests Due: 5 p.m. ET
10/10/18.
Docket Numbers: RP18–1192–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing TETLP
OFO September 2018 Penalty
Disbursement Report.
Filed Date: 9/20/18.
E:\FR\FM\28SEN1.SGM
28SEN1
amozie on DSK3GDR082PROD with NOTICES1
49078
Federal Register / Vol. 83, No. 189 / Friday, September 28, 2018 / Notices
Accession Number: 20180920–5031.
Comments Due: 5 p.m. ET 10/2/18.
Docket Numbers: RP18–1193–000.
Applicants: Enable Gas Transmission,
LLC.
Description: § 4(d) Rate Filing: Fuel
Tracker Filing Effective November 1,
2018 to be effective 11/1/2018.
Filed Date: 9/20/18.
Accession Number: 20180920–5047.
Comments Due: 5 p.m. ET 10/2/18.
Docket Numbers: RP18–1194–000.
Applicants: Enable Mississippi River
Transmission, LLC.
Description: 2018 Annual Penalty
Revenue Credit Filing.
Filed Date: 9/20/18.
Accession Number: 20180920–5151.
Comments Due: 5 p.m. ET 10/2/18.
Docket Numbers: RP18–1195–000.
Applicants: Enable Gas Transmission,
LLC.
Description: Annual Report of Total
Penalty Revenue Credits of Enable Gas
Transmission, LLC.
Filed Date: 9/20/18.
Accession Number: 20180920–5152.
Comments Due: 5 p.m. ET 10/2/18.
Docket Numbers: RP18–1196–000.
Applicants: Enable Gas Transmission,
LLC.
Description: Annual Report of Linked
Firm Service Penalty Revenue Credits of
Enable Gas Transmission, LLC.
Filed Date: 9/20/18.
Accession Number: 20180920–5153.
Comments Due: 5 p.m. ET 10/2/18.
Docket Numbers: RP18–1197–000.
Applicants: Enable Mississippi River
Transmission, LLC.
Description: § 4(d) Rate Filing: 2018
MRT Annual Fuel Filing to be effective
11/1/2018.
Filed Date: 9/20/18.
Accession Number: 20180920–5157.
Comments Due: 5 p.m. ET 10/2/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
19:22 Sep 27, 2018
Jkt 244001
Dated: September 24, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–21128 Filed 9–27–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC14–78–005.
Applicants: NRG Energy, Inc.,
Clearway Energy, Inc.
Description: Request for Termination
of Blanket Authorization and
Conditions of NRG Energy, Inc., et al.
Filed Date: 9/21/18.
Accession Number: 20180921–5160.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: EC18–159–000.
Applicants: AltaGas San Joaquin
Energy Inc.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of AltaGas San
Joaquin Energy Inc.
Filed Date: 9/21/18.
Accession Number: 20180921–5233.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: EC18–160–000.
Applicants: Alpaugh 50, LLC,
Alpaugh North, LLC, Broken Bow Wind
II, LLC, CED White River Solar, LLC,
Copper Mountain Solar 1, LLC, Copper
Mountain Solar 2, LLC, Copper
Mountain Solar 3, LLC, Copper
Mountain Solar 4, LLC, Great Valley
Solar 1, LLC, Great Valley Solar 2, LLC,
Great Valley Solar 3, LLC, Mesquite
Solar 1, LLC, Mesquite Solar 2, LLC,
Mesquite Solar 3, LLC, SEP II, LLC.
Description: Application for
Authorization of Transaction Pursuant
to Section 203 of the Federal Power Act
and Request for Expedited Action of
Alpaugh 50, LLC, et. al.
Filed Date: 9/21/18.
Accession Number: 20180921–5235.
Comments Due: 5 p.m. ET 10/12/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–2214–001.
Applicants: Stryker 22, LLC.
Description: Tariff Amendment:
Supplemental—MBRA Tariff to be
effective 9/25/2018.
Filed Date: 9/24/18.
Accession Number: 20180924–5029.
Comments Due: 5 p.m. ET 10/15/18.
Docket Numbers: ER18–2216–001.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Applicants: Plumsted 537 LLC.
Description: Tariff Amendment:
Supplemental—MBRA Tariff to be
effective 9/22/2018.
Filed Date: 9/21/18.
Accession Number: 20180921–5210.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18–2464–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2482R1 KCPL & Westar Energy
Interconnection & Interchange Ag to be
effective 12/1/2018.
Filed Date: 9/24/18.
Accession Number: 20180924–5001.
Comments Due: 5 p.m. ET 10/15/18.
Docket Numbers: ER18–2465–000.
Applicants: Potter Road Powerhouse
LLC.
Description: Baseline eTariff Filing:
Application and MBR Tariff to be
effective 9/25/2018.
Filed Date: 9/24/18.
Accession Number: 20180924–5054.
Comments Due: 5 p.m. ET 10/15/18.
Docket Numbers: ER18–2466–000.
Applicants: Federal Way Powerhouse
LLC.
Description: Baseline eTariff Filing:
Application and MBR Tariff to be
effective 9/25/2018.
Filed Date: 9/24/18.
Accession Number: 20180924–5055.
Comments Due: 5 p.m. ET 10/15/18.
Docket Numbers: ER18–2467–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of Original
Service Agreement No. 3408; Queue No.
X3–002 to be effective 10/1/2018.
Filed Date: 9/24/18.
Accession Number: 20180924–5113.
Comments Due: 5 p.m. ET 10/15/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 83, Number 189 (Friday, September 28, 2018)]
[Notices]
[Pages 49077-49078]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-21128]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18-82-000.
Applicants: Banquete Hub LLC.
Description: Tariff filing per 284.123(b),(e)/: Baseline Filing--
Banquete Hub SOC and the Errata to be effective 10/1/2018.
Filed Date: 9/19/18.
Accession Number: 201809195092.
Comments/Protests Due: 5 p.m. ET 10/10/18.
Docket Numbers: RP18-1192-000.
Applicants: Texas Eastern Transmission, LP.
Description: Compliance filing TETLP OFO September 2018 Penalty
Disbursement Report.
Filed Date: 9/20/18.
[[Page 49078]]
Accession Number: 20180920-5031.
Comments Due: 5 p.m. ET 10/2/18.
Docket Numbers: RP18-1193-000.
Applicants: Enable Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Fuel Tracker Filing Effective
November 1, 2018 to be effective 11/1/2018.
Filed Date: 9/20/18.
Accession Number: 20180920-5047.
Comments Due: 5 p.m. ET 10/2/18.
Docket Numbers: RP18-1194-000.
Applicants: Enable Mississippi River Transmission, LLC.
Description: 2018 Annual Penalty Revenue Credit Filing.
Filed Date: 9/20/18.
Accession Number: 20180920-5151.
Comments Due: 5 p.m. ET 10/2/18.
Docket Numbers: RP18-1195-000.
Applicants: Enable Gas Transmission, LLC.
Description: Annual Report of Total Penalty Revenue Credits of
Enable Gas Transmission, LLC.
Filed Date: 9/20/18.
Accession Number: 20180920-5152.
Comments Due: 5 p.m. ET 10/2/18.
Docket Numbers: RP18-1196-000.
Applicants: Enable Gas Transmission, LLC.
Description: Annual Report of Linked Firm Service Penalty Revenue
Credits of Enable Gas Transmission, LLC.
Filed Date: 9/20/18.
Accession Number: 20180920-5153.
Comments Due: 5 p.m. ET 10/2/18.
Docket Numbers: RP18-1197-000.
Applicants: Enable Mississippi River Transmission, LLC.
Description: Sec. 4(d) Rate Filing: 2018 MRT Annual Fuel Filing to
be effective 11/1/2018.
Filed Date: 9/20/18.
Accession Number: 20180920-5157.
Comments Due: 5 p.m. ET 10/2/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 24, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-21128 Filed 9-27-18; 8:45 am]
BILLING CODE 6717-01-P