Combined Notice of Filings, 49077-49078 [2018-21128]

Download as PDF Federal Register / Vol. 83, No. 189 / Friday, September 28, 2018 / Notices wetland and riparian habitat and wildlife; climate change; transportation; recreation; land use; Tribal resources, including Tribal treaty rights; environmental health and safety, and public services and utilities. c. The Corps will serve as the lead agency for compliance with NEPA. The Corps has invited the U.S. Environmental Protection Agency, the Chehalis Tribe, and the Quinault Indian Nation to serve as cooperating agencies under NEPA. The Corps will consult with the Washington State Historic Preservation Officer and applicable Tribes to comply with the National Historic Preservation Act; and applicable Tribes to comply with treaty provisions. d. Development of the draft EIS will begin after the close of the scoping period. The draft EIS is currently scheduled to be available for public review and comment in early 2020. e. A 31-day public review period will be provided for all interested parties, individuals, and agencies to review and comment on the draft EIS. All interested parties are encouraged to respond to this notice and provide a current address if they wish to be notified when the draft EIS is issued. f. All comments received will become part of the administrative record and are subject to public release, as appropriate, in their entirety, including any personally identifiable information such as names, phone numbers, and addresses if included in the comment. Dated: September 19, 2018. Ryan A. Baum, Major, Corps of Engineers, Acting Commander. [FR Doc. 2018–21154 Filed 9–27–18; 8:45 a.m.] BILLING CODE 3720–58–P DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Notice of Availability of the Final Missouri River Recovery Management Plan and Environmental Impact Statement Department of the Army, U.S. Army Corps of Engineers, DoD. ACTION: Notice; extension of final EIS waiting period. amozie on DSK3GDR082PROD with NOTICES1 AGENCY: The Notice of Availability for the Final Missouri River Recovery Management Plan and Environmental Impact Statement (MRRMP–FEIS) published in the Federal Register on Friday, August 31, 2018, stated the waiting period for signature of the SUMMARY: VerDate Sep<11>2014 19:22 Sep 27, 2018 Jkt 244001 MRRMP–FEIS Record of Decision would end on October 9, 2018. The U.S. Army Corps of Engineers is extending the waiting period through October 22, 2018. FOR FURTHER INFORMATION CONTACT: Tiffany Vanosdall, U.S. Army Corps of Engineers at (402) 995–2695 or by email at tiffany.k.vanosdall@usace.army.mil. SUPPLEMENTARY INFORMATION: The MRRMP–FEIS can be downloaded online at: https://www.nwo. usace.army.mil/mrrp/mgmt-plan/ or at: https://parkplanning.nps.gov/MRRMP. Brenda S. Bowen, Army Federal Register Liaison Officer. [FR Doc. 2018–21155 Filed 9–27–18; 8:45 am] BILLING CODE 3720–58–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL18–203–000] Notice of Complaint; Owensboro Municipal Utilities v. Louisville Gas and Electric Company, Kentucky Utilities Company Take notice that on September 21, 2018, pursuant to sections 206, 306, 309, and 316 1 of the Federal Power Act and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure,2 Owensboro Municipal Utilities (Complainant) filed a formal complaint against Louisville Gas and Electric Company and Kentucky Utilities Company, (Respondents) alleging that, from February 1, 2018 forward, Respondents violated and continue to violate its joint obligation, under First Revised Rate Schedule No. 402 to reimburse Complainant for pancaked transmission service charges incurred to Drive-Out from the Midcontinent Independent System Operator, all as more fully explained in the complaint. The Complainants certify that copies of the Complaint were served on contacts for Respondents. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of 1 16 2 18 PO 00000 U.S.C. 825e, 824e, 825h, and 825o. CFR 385.206. Frm 00030 Fmt 4703 Sfmt 4703 49077 intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 11, 2018. Dated: September 24, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–21129 Filed 9–27–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Number: PR18–82–000. Applicants: Banquete Hub LLC. Description: Tariff filing per 284.123(b),(e)/: Baseline Filing— Banquete Hub SOC and the Errata to be effective 10/1/2018. Filed Date: 9/19/18. Accession Number: 201809195092. Comments/Protests Due: 5 p.m. ET 10/10/18. Docket Numbers: RP18–1192–000. Applicants: Texas Eastern Transmission, LP. Description: Compliance filing TETLP OFO September 2018 Penalty Disbursement Report. Filed Date: 9/20/18. E:\FR\FM\28SEN1.SGM 28SEN1 amozie on DSK3GDR082PROD with NOTICES1 49078 Federal Register / Vol. 83, No. 189 / Friday, September 28, 2018 / Notices Accession Number: 20180920–5031. Comments Due: 5 p.m. ET 10/2/18. Docket Numbers: RP18–1193–000. Applicants: Enable Gas Transmission, LLC. Description: § 4(d) Rate Filing: Fuel Tracker Filing Effective November 1, 2018 to be effective 11/1/2018. Filed Date: 9/20/18. Accession Number: 20180920–5047. Comments Due: 5 p.m. ET 10/2/18. Docket Numbers: RP18–1194–000. Applicants: Enable Mississippi River Transmission, LLC. Description: 2018 Annual Penalty Revenue Credit Filing. Filed Date: 9/20/18. Accession Number: 20180920–5151. Comments Due: 5 p.m. ET 10/2/18. Docket Numbers: RP18–1195–000. Applicants: Enable Gas Transmission, LLC. Description: Annual Report of Total Penalty Revenue Credits of Enable Gas Transmission, LLC. Filed Date: 9/20/18. Accession Number: 20180920–5152. Comments Due: 5 p.m. ET 10/2/18. Docket Numbers: RP18–1196–000. Applicants: Enable Gas Transmission, LLC. Description: Annual Report of Linked Firm Service Penalty Revenue Credits of Enable Gas Transmission, LLC. Filed Date: 9/20/18. Accession Number: 20180920–5153. Comments Due: 5 p.m. ET 10/2/18. Docket Numbers: RP18–1197–000. Applicants: Enable Mississippi River Transmission, LLC. Description: § 4(d) Rate Filing: 2018 MRT Annual Fuel Filing to be effective 11/1/2018. Filed Date: 9/20/18. Accession Number: 20180920–5157. Comments Due: 5 p.m. ET 10/2/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. VerDate Sep<11>2014 19:22 Sep 27, 2018 Jkt 244001 Dated: September 24, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–21128 Filed 9–27–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC14–78–005. Applicants: NRG Energy, Inc., Clearway Energy, Inc. Description: Request for Termination of Blanket Authorization and Conditions of NRG Energy, Inc., et al. Filed Date: 9/21/18. Accession Number: 20180921–5160. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: EC18–159–000. Applicants: AltaGas San Joaquin Energy Inc. Description: Application for Authorization Under Section 203 of the Federal Power Act of AltaGas San Joaquin Energy Inc. Filed Date: 9/21/18. Accession Number: 20180921–5233. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: EC18–160–000. Applicants: Alpaugh 50, LLC, Alpaugh North, LLC, Broken Bow Wind II, LLC, CED White River Solar, LLC, Copper Mountain Solar 1, LLC, Copper Mountain Solar 2, LLC, Copper Mountain Solar 3, LLC, Copper Mountain Solar 4, LLC, Great Valley Solar 1, LLC, Great Valley Solar 2, LLC, Great Valley Solar 3, LLC, Mesquite Solar 1, LLC, Mesquite Solar 2, LLC, Mesquite Solar 3, LLC, SEP II, LLC. Description: Application for Authorization of Transaction Pursuant to Section 203 of the Federal Power Act and Request for Expedited Action of Alpaugh 50, LLC, et. al. Filed Date: 9/21/18. Accession Number: 20180921–5235. Comments Due: 5 p.m. ET 10/12/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–2214–001. Applicants: Stryker 22, LLC. Description: Tariff Amendment: Supplemental—MBRA Tariff to be effective 9/25/2018. Filed Date: 9/24/18. Accession Number: 20180924–5029. Comments Due: 5 p.m. ET 10/15/18. Docket Numbers: ER18–2216–001. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 Applicants: Plumsted 537 LLC. Description: Tariff Amendment: Supplemental—MBRA Tariff to be effective 9/22/2018. Filed Date: 9/21/18. Accession Number: 20180921–5210. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–2464–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2482R1 KCPL & Westar Energy Interconnection & Interchange Ag to be effective 12/1/2018. Filed Date: 9/24/18. Accession Number: 20180924–5001. Comments Due: 5 p.m. ET 10/15/18. Docket Numbers: ER18–2465–000. Applicants: Potter Road Powerhouse LLC. Description: Baseline eTariff Filing: Application and MBR Tariff to be effective 9/25/2018. Filed Date: 9/24/18. Accession Number: 20180924–5054. Comments Due: 5 p.m. ET 10/15/18. Docket Numbers: ER18–2466–000. Applicants: Federal Way Powerhouse LLC. Description: Baseline eTariff Filing: Application and MBR Tariff to be effective 9/25/2018. Filed Date: 9/24/18. Accession Number: 20180924–5055. Comments Due: 5 p.m. ET 10/15/18. Docket Numbers: ER18–2467–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of Original Service Agreement No. 3408; Queue No. X3–002 to be effective 10/1/2018. Filed Date: 9/24/18. Accession Number: 20180924–5113. Comments Due: 5 p.m. ET 10/15/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. E:\FR\FM\28SEN1.SGM 28SEN1

Agencies

[Federal Register Volume 83, Number 189 (Friday, September 28, 2018)]
[Notices]
[Pages 49077-49078]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-21128]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Number: PR18-82-000.
    Applicants: Banquete Hub LLC.
    Description: Tariff filing per 284.123(b),(e)/: Baseline Filing--
Banquete Hub SOC and the Errata to be effective 10/1/2018.
    Filed Date: 9/19/18.
    Accession Number: 201809195092.
    Comments/Protests Due: 5 p.m. ET 10/10/18.

    Docket Numbers: RP18-1192-000.
    Applicants: Texas Eastern Transmission, LP.
    Description: Compliance filing TETLP OFO September 2018 Penalty 
Disbursement Report.
    Filed Date: 9/20/18.

[[Page 49078]]

    Accession Number: 20180920-5031.
    Comments Due: 5 p.m. ET 10/2/18.

    Docket Numbers: RP18-1193-000.
    Applicants: Enable Gas Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: Fuel Tracker Filing Effective 
November 1, 2018 to be effective 11/1/2018.
    Filed Date: 9/20/18.
    Accession Number: 20180920-5047.
    Comments Due: 5 p.m. ET 10/2/18.

    Docket Numbers: RP18-1194-000.
    Applicants: Enable Mississippi River Transmission, LLC.
    Description: 2018 Annual Penalty Revenue Credit Filing.
    Filed Date: 9/20/18.
    Accession Number: 20180920-5151.
    Comments Due: 5 p.m. ET 10/2/18.

    Docket Numbers: RP18-1195-000.
    Applicants: Enable Gas Transmission, LLC.
    Description: Annual Report of Total Penalty Revenue Credits of 
Enable Gas Transmission, LLC.
    Filed Date: 9/20/18.
    Accession Number: 20180920-5152.
    Comments Due: 5 p.m. ET 10/2/18.

    Docket Numbers: RP18-1196-000.
    Applicants: Enable Gas Transmission, LLC.
    Description: Annual Report of Linked Firm Service Penalty Revenue 
Credits of Enable Gas Transmission, LLC.
    Filed Date: 9/20/18.
    Accession Number: 20180920-5153.
    Comments Due: 5 p.m. ET 10/2/18.

    Docket Numbers: RP18-1197-000.
    Applicants: Enable Mississippi River Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: 2018 MRT Annual Fuel Filing to 
be effective 11/1/2018.
    Filed Date: 9/20/18.
    Accession Number: 20180920-5157.
    Comments Due: 5 p.m. ET 10/2/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 24, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-21128 Filed 9-27-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.