Combined Notice of Filings #1, 48811-48812 [2018-21068]

Download as PDF Federal Register / Vol. 83, No. 188 / Thursday, September 27, 2018 / Notices daltland on DSKBBV9HB2PROD with NOTICES The Commission strongly encourages electronic filing. Please file all documents using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov. In lieu of electronic filing, you may send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–3133–032. All filings with the Commission must bear the appropriate heading: ‘‘Comments on Pre-Application Document,’’ ‘‘Study Requests,’’ ‘‘Comments on Scoping Document 1,’’ ‘‘Request for Cooperating Agency Status,’’ or ‘‘Communications to and from Commission Staff.’’ Any individual or entity interested in submitting study requests, commenting on the PAD or SD1, and any agency requesting cooperating status must do so by November 30, 2018. p. Although our current intent is to prepare an environmental assessment (EA), there is the possibility that an Environmental Impact Statement (EIS) will be required. Nevertheless, this notice, associated scoping meeting, and our scoping process will satisfy the NEPA scoping requirements, irrespective of whether an EA or EIS is issued by the Commission. Scoping Meetings Commission staff will hold two scoping meetings in the vicinity of the project at the times and places noted below. The daytime meeting will focus on resource agency, Indian tribes, and non-governmental organization concerns, while the evening meeting is primarily for receiving input from the public. We invite all interested individuals, organizations, and agencies to attend one or both of the meetings, and to assist staff in identifying particular study needs, as well as the scope of environmental issues to be addressed in the environmental document. The times and locations of these meetings are as follows: Daytime Scoping Meeting Date and Time: Thursday, October 25, 2018 at 1:00 p.m. Location: Errol Town Hall, 33 Main St., Errol, New Hampshire 03579. Phone Number: (603) 482–3351. VerDate Sep<11>2014 17:20 Sep 26, 2018 Jkt 244001 Evening Scoping Meeting Date and Time: Thursday, October 25, 2018 at 7:00 p.m. Location: Errol Town Hall, 33 Main St., Errol, New Hampshire 03579. Phone Number: (603) 482–3351. SD1, which outlines the subject areas to be addressed in the environmental document, was mailed to the individuals and entities on the Commission’s mailing list. Copies of SD1 will be available at the scoping meetings, or may be viewed on the web at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Follow the directions for accessing information in paragraph n. Based on all oral and written comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a revised process plan and schedule, as well as a list of issues, identified through the scoping process. Environmental Site Review The potential applicant and Commission staff will conduct an Environmental Site Review of the project on Wednesday, October 24, 2018, starting at 1:00 p.m. All participants should meet at the Errol Town Hall, located at: 33 Main Street, Errol, New Hampshire 03579. All participants are responsible for their own transportation. Anyone with questions about the site visit should contact Mr. Randy Dorman with Brookfield Renewable at (207) 755– 5605. Meeting Objectives At the scoping meetings, staff will: (1) Initiate scoping of the issues; (2) review and discuss existing conditions and resource management objectives; (3) review and discuss existing information and identify preliminary information and study needs; (4) review and discuss the process plan and schedule for prefiling activity that incorporates the time frames provided for in Part 5 of the Commission’s regulations and, to the extent possible, maximizes coordination of federal, state, and tribal permitting and certification processes; and (5) discuss the appropriateness of any federal or state agency or Indian tribe acting as a cooperating agency for development of an environmental document. Meeting participants should come prepared to discuss their issues and/or concerns. Please review the PAD in preparation for the scoping meetings. Directions on how to obtain a copy of the PAD and SD1 are included in item n. of this document. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 48811 Meeting Procedures The meetings will be recorded by a stenographer and will be placed in the public records of the project. Dated: September 19, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–21055 Filed 9–26–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–145–000. Applicants: Choice Energy, LLC. Description: Amendment to August 29, 2018 Application for Authorization Under Section 203 of the Federal Power Act, et al. of Choice Energy LLC. Filed Date: 9/20/18. Accession Number: 20180920–5066. Comments Due: 5 p.m. ET 10/04/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2718–031; ER10–2719–031. Applicants: Cogen Technologies Linden Venture, L.P., East Coast Power Linden Holding, L.L.C. Description: Notice of Non-Material Change in Status of Cogen Technologies Linden Venture, L.P. Filed Date: 9/21/18. Accession Number: 20180921–5085. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–15–002. Applicants: Rausch Creek Generation, LLC. Description: Report Filing: Refund Report to be effective N/A. Filed Date: 9/21/18. Accession Number: 20180921–5079. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–1159–002. Applicants: Pioneer Transmission, LLC, Midcontinent Independent System Operator, Inc. Description: Compliance filing: 2018– 09–21_Pioneer Attachment O Compliance Filing to be effective 6/1/2018. Filed Date: 9/21/18. Accession Number: 20180921–5078. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–1248–002. Applicants: Southern California Edison Company. Description: Compliance filing: SCE Compliance Filing Revised WDAT ER18–1248 to be effective 5/30/2018. E:\FR\FM\27SEN1.SGM 27SEN1 daltland on DSKBBV9HB2PROD with NOTICES 48812 Federal Register / Vol. 83, No. 188 / Thursday, September 27, 2018 / Notices Filed Date: 9/21/18. Accession Number: 20180921–5163. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–2110–001. Applicants: Buckeye Power, Inc., PJM Interconnection, L.L.C. Description: Tariff Amendment: Amendment to July 31 Filing re NITSA Among PJM and Buckeye Power, Inc. to be effective 10/1/2018. Filed Date: 9/21/2018. Accession Number: 20180921–5110. Comments Due: 5 p.m. ET 10/3/18. Docket Numbers: ER18–2457–000. Applicants: ISO New England Inc. Description: ISO New England Inc. Resource Termination—Clear River Unit 1. Filed Date: 9/20/18. Accession Number: 20180920–5149. Comments Due: 5 p.m. ET 10/11/18. Docket Numbers: ER18–2458–000. Applicants: Duke Energy Ohio, Inc., PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Duke submits Amended and Restated Interconnection Agreement, SA No. 3141 to be effective 6/30/2018. Filed Date: 9/20/18. Accession Number: 20180920–5156. Comments Due: 5 p.m. ET 10/11/18. Docket Numbers: ER18–2459–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: WAPA Work Performance Agreement for Cottonwood Airport Reconductoring (RS 228) to be effective 9/24/2018. Filed Date: 9/21/18. Accession Number: 20180921–5103. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–2460–000. Applicants: New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: 205 filing re: Use of constraint reliability margin values less than 20 MW to be effective 11/21/2018. Filed Date: 9/21/18. Accession Number: 20180921–5107. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–2461–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MAIT submits five ECSAs, Service Agreement Nos. 5112, 5113, 5116, 5130, and 5131 to be effective 11/21/2018. Filed Date: 9/21/18. Accession Number: 20180921–5109. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–2462–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MAIT submits five ECSAs, Service VerDate Sep<11>2014 17:20 Sep 26, 2018 Jkt 244001 Agreement Nos. 5019, 5020, 5021, 5022, and 5023 to be effective 11/21/2018. Filed Date: 9/21/18. Accession Number: 20180921–5159. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–2463–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–09–21_SA 3115 LCM–ELL GIA (C042) to be effective 6/10/2018. Filed Date: 9/21/18. Accession Number: 20180921–5186. Comments Due: 5 p.m. ET 10/12/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 21, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–21068 Filed 9–26–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2336–094] Georgia Power Company; Notice of Modification of Procedural Schedule and Waiver of the Commission’s Regulatory Deadline for Scoping and Environmental Site Review Take notice that the Commission’s regulatory deadline for scoping and environmental site review for the following hydroelectric application is waived, and the schedule for processing the hydroelectric application has been modified. a. Type of Filing: Notice of Intent to File License Application for a New License and Commencing Pre-filing Process. b. Project No.: 2336–094. c. Dated Filed: July 3, 2018. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 d. Submitted By: Georgia Power Company (Georgia Power). e. Name of Project: Lloyd Shoals Hydroelectric Project. f. Location: The project is located on the Ocmulgee River in Butts, Henry, Jasper, and Newton Counties, Georgia. No federal lands have been identified within the project boundary. g. Filed Pursuant to: 18 CFR part 5 of the Commission’s Regulations. h. Potential Applicant Contact: Courtenay R. O’Mara, P.E., Hydro Licensing and Compliance Supervisor, Southern Company Generation, 241 Ralph McGill Boulevard NE, BIN 10193, Atlanta, GA 30308–3374; (404) 506– 7219; or g2jacksonrel@southernco.com. i. FERC Contact: Navreet Deo at (202) 502–6304, or email at navreet.deo@ ferc.gov. j. Scoping Meetings: The Commission’s August 20, 2018, Notice of Commencement of Proceedings, and Commission staff’s Scoping Document 1, established September 13, 2018, as the date for the public scoping meetings, and September 14, 2018, as the date for the environmental site review. The Commission’s September 12, 2018, Notice of Cancellation of Scoping and Site Review canceled the meetings until further notice due to Hurricane Florence. With this notice, the Commission waives the regulatory deadline of scoping and site review within 30 days of the Notice of Commencement of Proceedings and Scoping Document 1, and establishes the following revised dates and locations for the scoping meetings and site review: Daytime Scoping Meeting—Jackson, Georgia Date & Time: Tuesday, October 9, 2018, at 1 p.m. Location: Pepper Sprout Barn, 562 Old Bethel Road, Jackson, Georgia 30233, (678) 752–1550 Evening Scoping Meeting—Jackson, Georgia Date & Time: Tuesday, October 9, 2018, at 6:30 p.m. Location: Pepper Sprout Barn, 562 Old Bethel Road, Jackson, Georgia 30233, (678) 752–1550 Environmental Site Review The potential applicant and Commission staff will conduct an environmental site review of the project on Wednesday, October 10, 2018, consisting of facility tours from 9:00 a.m. to 12:00 p.m., and boat tours from 1:00 p.m. to 4:00 p.m. All participants should meet at the Jackson Land Management Office located at 180 Dam Road, Jackson, Georgia 30233. E:\FR\FM\27SEN1.SGM 27SEN1

Agencies

[Federal Register Volume 83, Number 188 (Thursday, September 27, 2018)]
[Notices]
[Pages 48811-48812]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-21068]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC18-145-000.
    Applicants: Choice Energy, LLC.
    Description: Amendment to August 29, 2018 Application for 
Authorization Under Section 203 of the Federal Power Act, et al. of 
Choice Energy LLC.
    Filed Date: 9/20/18.
    Accession Number: 20180920-5066.
    Comments Due: 5 p.m. ET 10/04/18.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2718-031; ER10-2719-031.
    Applicants: Cogen Technologies Linden Venture, L.P., East Coast 
Power Linden Holding, L.L.C.
    Description: Notice of Non-Material Change in Status of Cogen 
Technologies Linden Venture, L.P.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5085.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-15-002.
    Applicants: Rausch Creek Generation, LLC.
    Description: Report Filing: Refund Report to be effective N/A.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5079.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-1159-002.
    Applicants: Pioneer Transmission, LLC, Midcontinent Independent 
System Operator, Inc.
    Description: Compliance filing: 2018-09-21_Pioneer Attachment O 
Compliance Filing to be effective 6/1/2018.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5078.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-1248-002.
    Applicants: Southern California Edison Company.
    Description: Compliance filing: SCE Compliance Filing Revised WDAT 
ER18-1248 to be effective 5/30/2018.

[[Page 48812]]

    Filed Date: 9/21/18.
    Accession Number: 20180921-5163.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-2110-001.
    Applicants: Buckeye Power, Inc., PJM Interconnection, L.L.C.
    Description: Tariff Amendment: Amendment to July 31 Filing re NITSA 
Among PJM and Buckeye Power, Inc. to be effective 10/1/2018.
    Filed Date: 9/21/2018.
    Accession Number: 20180921-5110.
    Comments Due: 5 p.m. ET 10/3/18.

    Docket Numbers: ER18-2457-000.
    Applicants: ISO New England Inc.
    Description: ISO New England Inc. Resource Termination--Clear River 
Unit 1.
    Filed Date: 9/20/18.
    Accession Number: 20180920-5149.
    Comments Due: 5 p.m. ET 10/11/18.

    Docket Numbers: ER18-2458-000.
    Applicants: Duke Energy Ohio, Inc., PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Duke submits Amended and 
Restated Interconnection Agreement, SA No. 3141 to be effective 6/30/
2018.
    Filed Date: 9/20/18.
    Accession Number: 20180920-5156.
    Comments Due: 5 p.m. ET 10/11/18.

    Docket Numbers: ER18-2459-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: WAPA Work Performance 
Agreement for Cottonwood Airport Reconductoring (RS 228) to be 
effective 9/24/2018.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5103.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-2460-000.
    Applicants: New York Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 205 filing re: Use of 
constraint reliability margin values less than 20 MW to be effective 
11/21/2018.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5107.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-2461-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: MAIT submits five ECSAs, 
Service Agreement Nos. 5112, 5113, 5116, 5130, and 5131 to be effective 
11/21/2018.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5109.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-2462-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: MAIT submits five ECSAs, 
Service Agreement Nos. 5019, 5020, 5021, 5022, and 5023 to be effective 
11/21/2018.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5159.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-2463-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2018-09-21_SA 3115 LCM-ELL 
GIA (C042) to be effective 6/10/2018.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5186.
    Comments Due: 5 p.m. ET 10/12/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 21, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-21068 Filed 9-26-18; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.