Combined Notice of Filings #1, 48811-48812 [2018-21068]
Download as PDF
Federal Register / Vol. 83, No. 188 / Thursday, September 27, 2018 / Notices
daltland on DSKBBV9HB2PROD with NOTICES
The Commission strongly encourages
electronic filing. Please file all
documents using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. In lieu of
electronic filing, you may send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–3133–032.
All filings with the Commission must
bear the appropriate heading:
‘‘Comments on Pre-Application
Document,’’ ‘‘Study Requests,’’
‘‘Comments on Scoping Document 1,’’
‘‘Request for Cooperating Agency
Status,’’ or ‘‘Communications to and
from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by November 30, 2018.
p. Although our current intent is to
prepare an environmental assessment
(EA), there is the possibility that an
Environmental Impact Statement (EIS)
will be required. Nevertheless, this
notice, associated scoping meeting, and
our scoping process will satisfy the
NEPA scoping requirements,
irrespective of whether an EA or EIS is
issued by the Commission.
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the times and places noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and locations of
these meetings are as follows:
Daytime Scoping Meeting
Date and Time: Thursday, October 25,
2018 at 1:00 p.m.
Location: Errol Town Hall, 33 Main
St., Errol, New Hampshire 03579.
Phone Number: (603) 482–3351.
VerDate Sep<11>2014
17:20 Sep 26, 2018
Jkt 244001
Evening Scoping Meeting
Date and Time: Thursday, October 25,
2018 at 7:00 p.m.
Location: Errol Town Hall, 33 Main
St., Errol, New Hampshire 03579.
Phone Number: (603) 482–3351.
SD1, which outlines the subject areas
to be addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and
Commission staff will conduct an
Environmental Site Review of the
project on Wednesday, October 24,
2018, starting at 1:00 p.m. All
participants should meet at the Errol
Town Hall, located at: 33 Main Street,
Errol, New Hampshire 03579. All
participants are responsible for their
own transportation. Anyone with
questions about the site visit should
contact Mr. Randy Dorman with
Brookfield Renewable at (207) 755–
5605.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
48811
Meeting Procedures
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
Dated: September 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–21055 Filed 9–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–145–000.
Applicants: Choice Energy, LLC.
Description: Amendment to August
29, 2018 Application for Authorization
Under Section 203 of the Federal Power
Act, et al. of Choice Energy LLC.
Filed Date: 9/20/18.
Accession Number: 20180920–5066.
Comments Due: 5 p.m. ET 10/04/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2718–031;
ER10–2719–031.
Applicants: Cogen Technologies
Linden Venture, L.P., East Coast Power
Linden Holding, L.L.C.
Description: Notice of Non-Material
Change in Status of Cogen Technologies
Linden Venture, L.P.
Filed Date: 9/21/18.
Accession Number: 20180921–5085.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18–15–002.
Applicants: Rausch Creek Generation,
LLC.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 9/21/18.
Accession Number: 20180921–5079.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18–1159–002.
Applicants: Pioneer Transmission,
LLC, Midcontinent Independent System
Operator, Inc.
Description: Compliance filing: 2018–
09–21_Pioneer Attachment O
Compliance Filing to be effective
6/1/2018.
Filed Date: 9/21/18.
Accession Number: 20180921–5078.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18–1248–002.
Applicants: Southern California
Edison Company.
Description: Compliance filing: SCE
Compliance Filing Revised WDAT
ER18–1248 to be effective 5/30/2018.
E:\FR\FM\27SEN1.SGM
27SEN1
daltland on DSKBBV9HB2PROD with NOTICES
48812
Federal Register / Vol. 83, No. 188 / Thursday, September 27, 2018 / Notices
Filed Date: 9/21/18.
Accession Number: 20180921–5163.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18–2110–001.
Applicants: Buckeye Power, Inc., PJM
Interconnection, L.L.C.
Description: Tariff Amendment:
Amendment to July 31 Filing re NITSA
Among PJM and Buckeye Power, Inc. to
be effective 10/1/2018.
Filed Date: 9/21/2018.
Accession Number: 20180921–5110.
Comments Due: 5 p.m. ET 10/3/18.
Docket Numbers: ER18–2457–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
Resource Termination—Clear River
Unit 1.
Filed Date: 9/20/18.
Accession Number: 20180920–5149.
Comments Due: 5 p.m. ET 10/11/18.
Docket Numbers: ER18–2458–000.
Applicants: Duke Energy Ohio, Inc.,
PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Duke submits Amended and Restated
Interconnection Agreement, SA No.
3141 to be effective 6/30/2018.
Filed Date: 9/20/18.
Accession Number: 20180920–5156.
Comments Due: 5 p.m. ET 10/11/18.
Docket Numbers: ER18–2459–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
WAPA Work Performance Agreement
for Cottonwood Airport Reconductoring
(RS 228) to be effective 9/24/2018.
Filed Date: 9/21/18.
Accession Number: 20180921–5103.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18–2460–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing: 205
filing re: Use of constraint reliability
margin values less than 20 MW to be
effective 11/21/2018.
Filed Date: 9/21/18.
Accession Number: 20180921–5107.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18–2461–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
MAIT submits five ECSAs, Service
Agreement Nos. 5112, 5113, 5116, 5130,
and 5131 to be effective 11/21/2018.
Filed Date: 9/21/18.
Accession Number: 20180921–5109.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18–2462–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
MAIT submits five ECSAs, Service
VerDate Sep<11>2014
17:20 Sep 26, 2018
Jkt 244001
Agreement Nos. 5019, 5020, 5021, 5022,
and 5023 to be effective 11/21/2018.
Filed Date: 9/21/18.
Accession Number: 20180921–5159.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18–2463–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–09–21_SA 3115 LCM–ELL GIA
(C042) to be effective 6/10/2018.
Filed Date: 9/21/18.
Accession Number: 20180921–5186.
Comments Due: 5 p.m. ET 10/12/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 21, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–21068 Filed 9–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2336–094]
Georgia Power Company; Notice of
Modification of Procedural Schedule
and Waiver of the Commission’s
Regulatory Deadline for Scoping and
Environmental Site Review
Take notice that the Commission’s
regulatory deadline for scoping and
environmental site review for the
following hydroelectric application is
waived, and the schedule for processing
the hydroelectric application has been
modified.
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Pre-filing
Process.
b. Project No.: 2336–094.
c. Dated Filed: July 3, 2018.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
d. Submitted By: Georgia Power
Company (Georgia Power).
e. Name of Project: Lloyd Shoals
Hydroelectric Project.
f. Location: The project is located on
the Ocmulgee River in Butts, Henry,
Jasper, and Newton Counties, Georgia.
No federal lands have been identified
within the project boundary.
g. Filed Pursuant to: 18 CFR part 5 of
the Commission’s Regulations.
h. Potential Applicant Contact:
Courtenay R. O’Mara, P.E., Hydro
Licensing and Compliance Supervisor,
Southern Company Generation, 241
Ralph McGill Boulevard NE, BIN 10193,
Atlanta, GA 30308–3374; (404) 506–
7219; or g2jacksonrel@southernco.com.
i. FERC Contact: Navreet Deo at (202)
502–6304, or email at navreet.deo@
ferc.gov.
j. Scoping Meetings: The
Commission’s August 20, 2018, Notice
of Commencement of Proceedings, and
Commission staff’s Scoping Document
1, established September 13, 2018, as
the date for the public scoping meetings,
and September 14, 2018, as the date for
the environmental site review. The
Commission’s September 12, 2018,
Notice of Cancellation of Scoping and
Site Review canceled the meetings until
further notice due to Hurricane
Florence. With this notice, the
Commission waives the regulatory
deadline of scoping and site review
within 30 days of the Notice of
Commencement of Proceedings and
Scoping Document 1, and establishes
the following revised dates and
locations for the scoping meetings and
site review:
Daytime Scoping Meeting—Jackson,
Georgia
Date & Time: Tuesday, October 9,
2018, at 1 p.m.
Location: Pepper Sprout Barn, 562
Old Bethel Road, Jackson, Georgia
30233, (678) 752–1550
Evening Scoping Meeting—Jackson,
Georgia
Date & Time: Tuesday, October 9,
2018, at 6:30 p.m.
Location: Pepper Sprout Barn, 562
Old Bethel Road, Jackson, Georgia
30233, (678) 752–1550
Environmental Site Review
The potential applicant and
Commission staff will conduct an
environmental site review of the project
on Wednesday, October 10, 2018,
consisting of facility tours from 9:00
a.m. to 12:00 p.m., and boat tours from
1:00 p.m. to 4:00 p.m. All participants
should meet at the Jackson Land
Management Office located at 180 Dam
Road, Jackson, Georgia 30233.
E:\FR\FM\27SEN1.SGM
27SEN1
Agencies
[Federal Register Volume 83, Number 188 (Thursday, September 27, 2018)]
[Notices]
[Pages 48811-48812]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-21068]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-145-000.
Applicants: Choice Energy, LLC.
Description: Amendment to August 29, 2018 Application for
Authorization Under Section 203 of the Federal Power Act, et al. of
Choice Energy LLC.
Filed Date: 9/20/18.
Accession Number: 20180920-5066.
Comments Due: 5 p.m. ET 10/04/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2718-031; ER10-2719-031.
Applicants: Cogen Technologies Linden Venture, L.P., East Coast
Power Linden Holding, L.L.C.
Description: Notice of Non-Material Change in Status of Cogen
Technologies Linden Venture, L.P.
Filed Date: 9/21/18.
Accession Number: 20180921-5085.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18-15-002.
Applicants: Rausch Creek Generation, LLC.
Description: Report Filing: Refund Report to be effective N/A.
Filed Date: 9/21/18.
Accession Number: 20180921-5079.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18-1159-002.
Applicants: Pioneer Transmission, LLC, Midcontinent Independent
System Operator, Inc.
Description: Compliance filing: 2018-09-21_Pioneer Attachment O
Compliance Filing to be effective 6/1/2018.
Filed Date: 9/21/18.
Accession Number: 20180921-5078.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18-1248-002.
Applicants: Southern California Edison Company.
Description: Compliance filing: SCE Compliance Filing Revised WDAT
ER18-1248 to be effective 5/30/2018.
[[Page 48812]]
Filed Date: 9/21/18.
Accession Number: 20180921-5163.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18-2110-001.
Applicants: Buckeye Power, Inc., PJM Interconnection, L.L.C.
Description: Tariff Amendment: Amendment to July 31 Filing re NITSA
Among PJM and Buckeye Power, Inc. to be effective 10/1/2018.
Filed Date: 9/21/2018.
Accession Number: 20180921-5110.
Comments Due: 5 p.m. ET 10/3/18.
Docket Numbers: ER18-2457-000.
Applicants: ISO New England Inc.
Description: ISO New England Inc. Resource Termination--Clear River
Unit 1.
Filed Date: 9/20/18.
Accession Number: 20180920-5149.
Comments Due: 5 p.m. ET 10/11/18.
Docket Numbers: ER18-2458-000.
Applicants: Duke Energy Ohio, Inc., PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Duke submits Amended and
Restated Interconnection Agreement, SA No. 3141 to be effective 6/30/
2018.
Filed Date: 9/20/18.
Accession Number: 20180920-5156.
Comments Due: 5 p.m. ET 10/11/18.
Docket Numbers: ER18-2459-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: WAPA Work Performance
Agreement for Cottonwood Airport Reconductoring (RS 228) to be
effective 9/24/2018.
Filed Date: 9/21/18.
Accession Number: 20180921-5103.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18-2460-000.
Applicants: New York Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 205 filing re: Use of
constraint reliability margin values less than 20 MW to be effective
11/21/2018.
Filed Date: 9/21/18.
Accession Number: 20180921-5107.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18-2461-000.
Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: MAIT submits five ECSAs,
Service Agreement Nos. 5112, 5113, 5116, 5130, and 5131 to be effective
11/21/2018.
Filed Date: 9/21/18.
Accession Number: 20180921-5109.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18-2462-000.
Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: MAIT submits five ECSAs,
Service Agreement Nos. 5019, 5020, 5021, 5022, and 5023 to be effective
11/21/2018.
Filed Date: 9/21/18.
Accession Number: 20180921-5159.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18-2463-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-09-21_SA 3115 LCM-ELL
GIA (C042) to be effective 6/10/2018.
Filed Date: 9/21/18.
Accession Number: 20180921-5186.
Comments Due: 5 p.m. ET 10/12/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 21, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-21068 Filed 9-26-18; 8:45 am]
BILLING CODE 6717-01-P