Participants must notify Courtenay
O’Mara at g2jacksonrel@
southernco.com, or (404) 506–7219, on
or before October 3, 2018, if they plan
to attend the environmental site review.
k. Procedural Schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule may be made as
appropriate. If a date falls on a weekend
or holiday, the due date will be the
following business day.
Milestone
Target date
Public Scoping Meetings and
Environmental Site Review.
October 9, 2018 &
October 10,
2018.
November 5, 2018.
File Comments on PAD, SD1,
and Study Requests.
Commission Issues SD2, if
necessary.
File Proposed Study Plan .......
Study Plan Meetings ...............
File Comments on Proposed
Study Plan.
File Revised Proposed Study
Plan.
File Comments on Revised
Proposed Study Plan.
Commission Issues Study
Plan Determination.
December 20,
2018.
December 20,
2018.
January 22, 2019.
March 20, 2019.
April 19, 2019.
forwarded to: Ms. Melissa Melvin,
Secretary, Lake Upchurch Dam
Preservation Association, Inc., 127
Bayshore Drive, Parkton, NC 28371,
Phone: 910–864–3191, email:
Hmelvin1@nc.rr.com.
Dated: September 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–21063 Filed 9–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC18–19–000]
Commission Information Collection
Activities (FERC–725); Comment
Request; Extension September 21,
2018
Federal Energy Regulatory
Commission, DOE.
ACTION: Notice of information collection
and request for comments.
AGENCY:
May 6, 2019.
May 20, 2019.
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
approved information collection, FERC–
725 (Certification of Electric Reliability
Organization; Procedures for Electric
Reliability Standards).
DATES: Comments on the collection of
information are due November 26, 2018.
ADDRESSES: You may submit comments
(identified by Docket No. IC18–19–000)
by either of the following methods:
• eFiling at Commission’s Website:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance, contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
SUMMARY:
Dated: September 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–21054 Filed 9–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6619–022]
daltland on DSKBBV9HB2PROD with NOTICES
Lake Upchurch Power, Inc., Lake
Upchurch Dam Preservation
Association, Inc.; Notice of Transfer of
Exemption
1. By letter filed August 1, 2018 and
supplemented on August 17 and
September 4, 2018, Lake Upchurch Dam
Preservation Association, Inc., informed
the Commission that the exemption
from licensing for the Raeford Dam
Hydroelectric Project No. 6619,
originally issued October 22, 1982 1 has
been transferred to Lake Upchurch Dam
Preservation Association, Inc. The
project is located on Rockfish Creek in
Cumberland County, North Carolina.
The transfer of an exemption does not
require Commission approval.
2. Lake Upchurch Dam Preservation
Association, Inc. is now the exemptee of
the Raeford Dam Hydroelectric Project
No. 6619. All correspondence should be
1 Notice of Exemption From Licensing. Raeford
Hydropower Corporation, 21 FERC ¶ 62,114 (1982).
VerDate Sep<11>2014
17:20 Sep 26, 2018
Jkt 244001
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
48813
at DataClearance@FERC.gov, telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–725, Certification of
Electric Reliability Organization;
Procedures for Electric Reliability
Standards.
OMB Control No.: 1902–0225.
Type of Request: Three-year extension
of the FERC–725 information collection
requirements with no changes to the
current reporting and recordkeeping
requirements.1
Abstract: The FERC–725 contains the
following information collection
elements:
Self Assessment and ERO (Electric
Reliability Organization) Application:
The Commission requires the ERO to
submit to FERC a performance
assessment report every five years. The
next assessment is due in 2019. Each
Regional Entity submits a performance
assessment report to the ERO.
Submitting an application to become
the ERO is also part of this collection.2
Reliability Assessments: 18 CFR 39.11
requires the ERO to assess the reliability
and adequacy of the Bulk-Power System
in North America. Subsequently, the
ERO must report to the Commission on
its findings. Regional entities perform
similar assessments within individual
regions. Currently the ERO submits to
FERC three assessments each year: Long
term, winter, and summer. In addition,
the North American Electric Reliability
Corporation (NERC, the Commissionapproved ERO) also submits various
other assessments as needed.
Reliability Standards Development:
Under section 215 of the FPA, the ERO
is charged with developing Reliability
Standards. Regional Entities may also
develop regional specific standards.
Reliability Compliance: Reliability
Standards are mandatory and
enforceable upon approval by the
Commission. In addition to the specific
information collection requirements
contained in each standard (cleared
under other information collections),
there are general compliance,
monitoring and enforcement
1 As of 9/19/2018, a package for the ‘‘nonsubstantive’’ changes to FERC–725, implemented in
the Final Rule in Docket No. RM18–2–000, is
pending review at the Office of Management and
Budget (OMB). The burden estimates provided in
this Notice use those same burden estimates.
2 The Commission does not expect any new ERO
applications to be submitted in the next five years
and is not including any burden for this
requirement in the burden estimate. FERC still
seeks to renew the regulations pertaining to a new
ERO application under this renewal but is
expecting the burden to be zero for the foreseeable
future. 18 CFR 39.3 contains the regulation
pertaining to ERO applications.
E:\FR\FM\27SEN1.SGM
27SEN1
Agencies
[Federal Register Volume 83, Number 188 (Thursday, September 27, 2018)]
[Notices]
[Page 48813]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-21063]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6619-022]
Lake Upchurch Power, Inc., Lake Upchurch Dam Preservation
Association, Inc.; Notice of Transfer of Exemption
1. By letter filed August 1, 2018 and supplemented on August 17 and
September 4, 2018, Lake Upchurch Dam Preservation Association, Inc.,
informed the Commission that the exemption from licensing for the
Raeford Dam Hydroelectric Project No. 6619, originally issued October
22, 1982 \1\ has been transferred to Lake Upchurch Dam Preservation
Association, Inc. The project is located on Rockfish Creek in
Cumberland County, North Carolina. The transfer of an exemption does
not require Commission approval.
---------------------------------------------------------------------------
\1\ Notice of Exemption From Licensing. Raeford Hydropower
Corporation, 21 FERC ] 62,114 (1982).
---------------------------------------------------------------------------
2. Lake Upchurch Dam Preservation Association, Inc. is now the
exemptee of the Raeford Dam Hydroelectric Project No. 6619. All
correspondence should be forwarded to: Ms. Melissa Melvin, Secretary,
Lake Upchurch Dam Preservation Association, Inc., 127 Bayshore Drive,
Parkton, NC 28371, Phone: 910-864-3191, email: [email protected].
Dated: September 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-21063 Filed 9-26-18; 8:45 am]