Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests; Brookfield White Pine Hydro LLC & Errol Hydroelectric Co., LLC, 48810-48811 [2018-21055]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
48810
Federal Register / Vol. 83, No. 188 / Thursday, September 27, 2018 / Notices
the Traditional Licensing Process on
July 31, 2018. Winooski Hydro provided
public notice of its request on July 24,
2018. In a letter dated September 21,
2018, the Director of the Division of
Hydropower Licensing approved
Winooski Hydro’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
part 402; and NOAA Fisheries under
section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management
Act and implementing regulations at 50
CFR 600.920. We are also initiating
consultation with the Vermont State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Winooski Hydro as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act
and section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act; and consultation
pursuant to section 106 of the National
Historic Preservation Act.
m. Winooski Hydro filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 6470.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by July 31, 2021.
VerDate Sep<11>2014
17:20 Sep 26, 2018
Jkt 244001
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: September 21, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–21061 Filed 9–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3133–032]
Notice of Intent To File License
Application, Filing of Pre-Application
Document (PAD), Commencement of
Pre-Filing Process, and Scoping;
Request for Comments on the PAD
and Scoping Document, and
Identification of Issues and Associated
Study Requests; Brookfield White Pine
Hydro LLC & Errol Hydroelectric Co.,
LLC
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Pre-filing
Process.
b. Project No.: 3133–032.
c. Dated Filed: July 31, 2018.
d. Submitted by: Brookfield White
Pine Hydro, LLC & Errol Hydroelectric
Co., LLC.
e. Name of Project: Errol
Hydroelectric Project.
f. Location: On the Androscoggin
River and Lake Umbagog in Coos
County, New Hampshire and Oxford
County Maine. The project occupies an
undetermined amount of United States
lands under the jurisdiction of the U.S.
Fish and Wildlife Service.
g. Filed Pursuant to: 18 CFR part 5 of
the Commission’s Regulations.
h. Potential Applicant Contact: Tom
Uncher, Vice President, Brookfield
White Pine Hydro, LLC, 339B Big Bay
Rd., Qeensbury, NY 12804.
i. FERC Contact: Kenneth Hogan at
(202) 502–8434 or email at:
Kenneth.Hogan@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item o below. Cooperating
agencies should note the Commission’s
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402 and (b) the State Historic
Preservation Officer, as required by
section 106, National Historic
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Brookfield White Pine Hydro, LLC, and
Errol Hydroelectric Co., LLC, as the
Commission’s non-federal
representatives for carrying out informal
consultation, pursuant to section 7 of
the Endangered Species Act and section
106 of the National Historic
Preservation Act.
m. Brookfield White Pine Hydro, LLC,
and Errol Hydroelectric Co., LLC filed
with the Commission a Pre-Application
Document (PAD; including a proposed
process plan and schedule), pursuant to
18 CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at:
Brookfield Renewable, 150 Main Street,
Lewiston, ME 04240.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are soliciting
comments on the PAD and
Commission’s staff Scoping Document 1
(SD1), as well as study requests. All
comments on the PAD and SD1, and
study requests should be sent to the
address above in paragraph h. In
addition, all comments on the PAD and
SD1, study requests, requests for
cooperating agency status, and all
communications to and from
Commission staff related to the merits of
the potential application must be filed
with the Commission.
E:\FR\FM\27SEN1.SGM
27SEN1
Federal Register / Vol. 83, No. 188 / Thursday, September 27, 2018 / Notices
daltland on DSKBBV9HB2PROD with NOTICES
The Commission strongly encourages
electronic filing. Please file all
documents using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. In lieu of
electronic filing, you may send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–3133–032.
All filings with the Commission must
bear the appropriate heading:
‘‘Comments on Pre-Application
Document,’’ ‘‘Study Requests,’’
‘‘Comments on Scoping Document 1,’’
‘‘Request for Cooperating Agency
Status,’’ or ‘‘Communications to and
from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by November 30, 2018.
p. Although our current intent is to
prepare an environmental assessment
(EA), there is the possibility that an
Environmental Impact Statement (EIS)
will be required. Nevertheless, this
notice, associated scoping meeting, and
our scoping process will satisfy the
NEPA scoping requirements,
irrespective of whether an EA or EIS is
issued by the Commission.
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the times and places noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and locations of
these meetings are as follows:
Daytime Scoping Meeting
Date and Time: Thursday, October 25,
2018 at 1:00 p.m.
Location: Errol Town Hall, 33 Main
St., Errol, New Hampshire 03579.
Phone Number: (603) 482–3351.
VerDate Sep<11>2014
17:20 Sep 26, 2018
Jkt 244001
Evening Scoping Meeting
Date and Time: Thursday, October 25,
2018 at 7:00 p.m.
Location: Errol Town Hall, 33 Main
St., Errol, New Hampshire 03579.
Phone Number: (603) 482–3351.
SD1, which outlines the subject areas
to be addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and
Commission staff will conduct an
Environmental Site Review of the
project on Wednesday, October 24,
2018, starting at 1:00 p.m. All
participants should meet at the Errol
Town Hall, located at: 33 Main Street,
Errol, New Hampshire 03579. All
participants are responsible for their
own transportation. Anyone with
questions about the site visit should
contact Mr. Randy Dorman with
Brookfield Renewable at (207) 755–
5605.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
48811
Meeting Procedures
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
Dated: September 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–21055 Filed 9–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–145–000.
Applicants: Choice Energy, LLC.
Description: Amendment to August
29, 2018 Application for Authorization
Under Section 203 of the Federal Power
Act, et al. of Choice Energy LLC.
Filed Date: 9/20/18.
Accession Number: 20180920–5066.
Comments Due: 5 p.m. ET 10/04/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2718–031;
ER10–2719–031.
Applicants: Cogen Technologies
Linden Venture, L.P., East Coast Power
Linden Holding, L.L.C.
Description: Notice of Non-Material
Change in Status of Cogen Technologies
Linden Venture, L.P.
Filed Date: 9/21/18.
Accession Number: 20180921–5085.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18–15–002.
Applicants: Rausch Creek Generation,
LLC.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 9/21/18.
Accession Number: 20180921–5079.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18–1159–002.
Applicants: Pioneer Transmission,
LLC, Midcontinent Independent System
Operator, Inc.
Description: Compliance filing: 2018–
09–21_Pioneer Attachment O
Compliance Filing to be effective
6/1/2018.
Filed Date: 9/21/18.
Accession Number: 20180921–5078.
Comments Due: 5 p.m. ET 10/12/18.
Docket Numbers: ER18–1248–002.
Applicants: Southern California
Edison Company.
Description: Compliance filing: SCE
Compliance Filing Revised WDAT
ER18–1248 to be effective 5/30/2018.
E:\FR\FM\27SEN1.SGM
27SEN1
Agencies
[Federal Register Volume 83, Number 188 (Thursday, September 27, 2018)]
[Notices]
[Pages 48810-48811]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-21055]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3133-032]
Notice of Intent To File License Application, Filing of Pre-
Application Document (PAD), Commencement of Pre-Filing Process, and
Scoping; Request for Comments on the PAD and Scoping Document, and
Identification of Issues and Associated Study Requests; Brookfield
White Pine Hydro LLC & Errol Hydroelectric Co., LLC
a. Type of Filing: Notice of Intent to File License Application for
a New License and Commencing Pre-filing Process.
b. Project No.: 3133-032.
c. Dated Filed: July 31, 2018.
d. Submitted by: Brookfield White Pine Hydro, LLC & Errol
Hydroelectric Co., LLC.
e. Name of Project: Errol Hydroelectric Project.
f. Location: On the Androscoggin River and Lake Umbagog in Coos
County, New Hampshire and Oxford County Maine. The project occupies an
undetermined amount of United States lands under the jurisdiction of
the U.S. Fish and Wildlife Service.
g. Filed Pursuant to: 18 CFR part 5 of the Commission's
Regulations.
h. Potential Applicant Contact: Tom Uncher, Vice President,
Brookfield White Pine Hydro, LLC, 339B Big Bay Rd., Qeensbury, NY
12804.
i. FERC Contact: Kenneth Hogan at (202) 502-8434 or email at:
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item o below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See 94 FERC ]
61,076 (2001).
k. With this notice, we are initiating informal consultation with:
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under
section 7 of the Endangered Species Act and the joint agency
regulations thereunder at 50 CFR, Part 402 and (b) the State Historic
Preservation Officer, as required by section 106, National Historic
Preservation Act, and the implementing regulations of the Advisory
Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Brookfield White Pine
Hydro, LLC, and Errol Hydroelectric Co., LLC, as the Commission's non-
federal representatives for carrying out informal consultation,
pursuant to section 7 of the Endangered Species Act and section 106 of
the National Historic Preservation Act.
m. Brookfield White Pine Hydro, LLC, and Errol Hydroelectric Co.,
LLC filed with the Commission a Pre-Application Document (PAD;
including a proposed process plan and schedule), pursuant to 18 CFR 5.6
of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction
at: Brookfield Renewable, 150 Main Street, Lewiston, ME 04240.
o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. With this notice, we are soliciting comments on the PAD and
Commission's staff Scoping Document 1 (SD1), as well as study requests.
All comments on the PAD and SD1, and study requests should be sent to
the address above in paragraph h. In addition, all comments on the PAD
and SD1, study requests, requests for cooperating agency status, and
all communications to and from Commission staff related to the merits
of the potential application must be filed with the Commission.
[[Page 48811]]
The Commission strongly encourages electronic filing. Please file
all documents using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected] In lieu of electronic filing, you may send
a paper copy to: Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-3133-032.
All filings with the Commission must bear the appropriate heading:
``Comments on Pre-Application Document,'' ``Study Requests,''
``Comments on Scoping Document 1,'' ``Request for Cooperating Agency
Status,'' or ``Communications to and from Commission Staff.'' Any
individual or entity interested in submitting study requests,
commenting on the PAD or SD1, and any agency requesting cooperating
status must do so by November 30, 2018.
p. Although our current intent is to prepare an environmental
assessment (EA), there is the possibility that an Environmental Impact
Statement (EIS) will be required. Nevertheless, this notice, associated
scoping meeting, and our scoping process will satisfy the NEPA scoping
requirements, irrespective of whether an EA or EIS is issued by the
Commission.
Scoping Meetings
Commission staff will hold two scoping meetings in the vicinity of
the project at the times and places noted below. The daytime meeting
will focus on resource agency, Indian tribes, and non-governmental
organization concerns, while the evening meeting is primarily for
receiving input from the public. We invite all interested individuals,
organizations, and agencies to attend one or both of the meetings, and
to assist staff in identifying particular study needs, as well as the
scope of environmental issues to be addressed in the environmental
document. The times and locations of these meetings are as follows:
Daytime Scoping Meeting
Date and Time: Thursday, October 25, 2018 at 1:00 p.m.
Location: Errol Town Hall, 33 Main St., Errol, New Hampshire 03579.
Phone Number: (603) 482-3351.
Evening Scoping Meeting
Date and Time: Thursday, October 25, 2018 at 7:00 p.m.
Location: Errol Town Hall, 33 Main St., Errol, New Hampshire 03579.
Phone Number: (603) 482-3351.
SD1, which outlines the subject areas to be addressed in the
environmental document, was mailed to the individuals and entities on
the Commission's mailing list. Copies of SD1 will be available at the
scoping meetings, or may be viewed on the web at https://www.ferc.gov,
using the ``eLibrary'' link. Follow the directions for accessing
information in paragraph n. Based on all oral and written comments, a
Scoping Document 2 (SD2) may be issued. SD2 may include a revised
process plan and schedule, as well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and Commission staff will conduct an
Environmental Site Review of the project on Wednesday, October 24,
2018, starting at 1:00 p.m. All participants should meet at the Errol
Town Hall, located at: 33 Main Street, Errol, New Hampshire 03579. All
participants are responsible for their own transportation. Anyone with
questions about the site visit should contact Mr. Randy Dorman with
Brookfield Renewable at (207) 755-5605.
Meeting Objectives
At the scoping meetings, staff will: (1) Initiate scoping of the
issues; (2) review and discuss existing conditions and resource
management objectives; (3) review and discuss existing information and
identify preliminary information and study needs; (4) review and
discuss the process plan and schedule for pre-filing activity that
incorporates the time frames provided for in Part 5 of the Commission's
regulations and, to the extent possible, maximizes coordination of
federal, state, and tribal permitting and certification processes; and
(5) discuss the appropriateness of any federal or state agency or
Indian tribe acting as a cooperating agency for development of an
environmental document.
Meeting participants should come prepared to discuss their issues
and/or concerns. Please review the PAD in preparation for the scoping
meetings. Directions on how to obtain a copy of the PAD and SD1 are
included in item n. of this document.
Meeting Procedures
The meetings will be recorded by a stenographer and will be placed
in the public records of the project.
Dated: September 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-21055 Filed 9-26-18; 8:45 am]