Georgia Power Company; Notice of Modification of Procedural Schedule and Waiver of the Commission's Regulatory Deadline for Scoping and Environmental Site Review, 48812-48813 [2018-21054]

Download as PDF daltland on DSKBBV9HB2PROD with NOTICES 48812 Federal Register / Vol. 83, No. 188 / Thursday, September 27, 2018 / Notices Filed Date: 9/21/18. Accession Number: 20180921–5163. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–2110–001. Applicants: Buckeye Power, Inc., PJM Interconnection, L.L.C. Description: Tariff Amendment: Amendment to July 31 Filing re NITSA Among PJM and Buckeye Power, Inc. to be effective 10/1/2018. Filed Date: 9/21/2018. Accession Number: 20180921–5110. Comments Due: 5 p.m. ET 10/3/18. Docket Numbers: ER18–2457–000. Applicants: ISO New England Inc. Description: ISO New England Inc. Resource Termination—Clear River Unit 1. Filed Date: 9/20/18. Accession Number: 20180920–5149. Comments Due: 5 p.m. ET 10/11/18. Docket Numbers: ER18–2458–000. Applicants: Duke Energy Ohio, Inc., PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Duke submits Amended and Restated Interconnection Agreement, SA No. 3141 to be effective 6/30/2018. Filed Date: 9/20/18. Accession Number: 20180920–5156. Comments Due: 5 p.m. ET 10/11/18. Docket Numbers: ER18–2459–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: WAPA Work Performance Agreement for Cottonwood Airport Reconductoring (RS 228) to be effective 9/24/2018. Filed Date: 9/21/18. Accession Number: 20180921–5103. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–2460–000. Applicants: New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: 205 filing re: Use of constraint reliability margin values less than 20 MW to be effective 11/21/2018. Filed Date: 9/21/18. Accession Number: 20180921–5107. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–2461–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MAIT submits five ECSAs, Service Agreement Nos. 5112, 5113, 5116, 5130, and 5131 to be effective 11/21/2018. Filed Date: 9/21/18. Accession Number: 20180921–5109. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–2462–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MAIT submits five ECSAs, Service VerDate Sep<11>2014 17:20 Sep 26, 2018 Jkt 244001 Agreement Nos. 5019, 5020, 5021, 5022, and 5023 to be effective 11/21/2018. Filed Date: 9/21/18. Accession Number: 20180921–5159. Comments Due: 5 p.m. ET 10/12/18. Docket Numbers: ER18–2463–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–09–21_SA 3115 LCM–ELL GIA (C042) to be effective 6/10/2018. Filed Date: 9/21/18. Accession Number: 20180921–5186. Comments Due: 5 p.m. ET 10/12/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 21, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–21068 Filed 9–26–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2336–094] Georgia Power Company; Notice of Modification of Procedural Schedule and Waiver of the Commission’s Regulatory Deadline for Scoping and Environmental Site Review Take notice that the Commission’s regulatory deadline for scoping and environmental site review for the following hydroelectric application is waived, and the schedule for processing the hydroelectric application has been modified. a. Type of Filing: Notice of Intent to File License Application for a New License and Commencing Pre-filing Process. b. Project No.: 2336–094. c. Dated Filed: July 3, 2018. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 d. Submitted By: Georgia Power Company (Georgia Power). e. Name of Project: Lloyd Shoals Hydroelectric Project. f. Location: The project is located on the Ocmulgee River in Butts, Henry, Jasper, and Newton Counties, Georgia. No federal lands have been identified within the project boundary. g. Filed Pursuant to: 18 CFR part 5 of the Commission’s Regulations. h. Potential Applicant Contact: Courtenay R. O’Mara, P.E., Hydro Licensing and Compliance Supervisor, Southern Company Generation, 241 Ralph McGill Boulevard NE, BIN 10193, Atlanta, GA 30308–3374; (404) 506– 7219; or g2jacksonrel@southernco.com. i. FERC Contact: Navreet Deo at (202) 502–6304, or email at navreet.deo@ ferc.gov. j. Scoping Meetings: The Commission’s August 20, 2018, Notice of Commencement of Proceedings, and Commission staff’s Scoping Document 1, established September 13, 2018, as the date for the public scoping meetings, and September 14, 2018, as the date for the environmental site review. The Commission’s September 12, 2018, Notice of Cancellation of Scoping and Site Review canceled the meetings until further notice due to Hurricane Florence. With this notice, the Commission waives the regulatory deadline of scoping and site review within 30 days of the Notice of Commencement of Proceedings and Scoping Document 1, and establishes the following revised dates and locations for the scoping meetings and site review: Daytime Scoping Meeting—Jackson, Georgia Date & Time: Tuesday, October 9, 2018, at 1 p.m. Location: Pepper Sprout Barn, 562 Old Bethel Road, Jackson, Georgia 30233, (678) 752–1550 Evening Scoping Meeting—Jackson, Georgia Date & Time: Tuesday, October 9, 2018, at 6:30 p.m. Location: Pepper Sprout Barn, 562 Old Bethel Road, Jackson, Georgia 30233, (678) 752–1550 Environmental Site Review The potential applicant and Commission staff will conduct an environmental site review of the project on Wednesday, October 10, 2018, consisting of facility tours from 9:00 a.m. to 12:00 p.m., and boat tours from 1:00 p.m. to 4:00 p.m. All participants should meet at the Jackson Land Management Office located at 180 Dam Road, Jackson, Georgia 30233. E:\FR\FM\27SEN1.SGM 27SEN1 Federal Register / Vol. 83, No. 188 / Thursday, September 27, 2018 / Notices Participants must notify Courtenay O’Mara at g2jacksonrel@ southernco.com, or (404) 506–7219, on or before October 3, 2018, if they plan to attend the environmental site review. k. Procedural Schedule: The application will be processed according to the following schedule. Revisions to the schedule may be made as appropriate. If a date falls on a weekend or holiday, the due date will be the following business day. Milestone Target date Public Scoping Meetings and Environmental Site Review. October 9, 2018 & October 10, 2018. November 5, 2018. File Comments on PAD, SD1, and Study Requests. Commission Issues SD2, if necessary. File Proposed Study Plan ....... Study Plan Meetings ............... File Comments on Proposed Study Plan. File Revised Proposed Study Plan. File Comments on Revised Proposed Study Plan. Commission Issues Study Plan Determination. December 20, 2018. December 20, 2018. January 22, 2019. March 20, 2019. April 19, 2019. forwarded to: Ms. Melissa Melvin, Secretary, Lake Upchurch Dam Preservation Association, Inc., 127 Bayshore Drive, Parkton, NC 28371, Phone: 910–864–3191, email: Hmelvin1@nc.rr.com. Dated: September 20, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–21063 Filed 9–26–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC18–19–000] Commission Information Collection Activities (FERC–725); Comment Request; Extension September 21, 2018 Federal Energy Regulatory Commission, DOE. ACTION: Notice of information collection and request for comments. AGENCY: May 6, 2019. May 20, 2019. In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC– 725 (Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards). DATES: Comments on the collection of information are due November 26, 2018. ADDRESSES: You may submit comments (identified by Docket No. IC18–19–000) by either of the following methods: • eFiling at Commission’s Website: https://www.ferc.gov/docs-filing/ efiling.asp. • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance, contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email SUMMARY: Dated: September 20, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–21054 Filed 9–26–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6619–022] daltland on DSKBBV9HB2PROD with NOTICES Lake Upchurch Power, Inc., Lake Upchurch Dam Preservation Association, Inc.; Notice of Transfer of Exemption 1. By letter filed August 1, 2018 and supplemented on August 17 and September 4, 2018, Lake Upchurch Dam Preservation Association, Inc., informed the Commission that the exemption from licensing for the Raeford Dam Hydroelectric Project No. 6619, originally issued October 22, 1982 1 has been transferred to Lake Upchurch Dam Preservation Association, Inc. The project is located on Rockfish Creek in Cumberland County, North Carolina. The transfer of an exemption does not require Commission approval. 2. Lake Upchurch Dam Preservation Association, Inc. is now the exemptee of the Raeford Dam Hydroelectric Project No. 6619. All correspondence should be 1 Notice of Exemption From Licensing. Raeford Hydropower Corporation, 21 FERC ¶ 62,114 (1982). VerDate Sep<11>2014 17:20 Sep 26, 2018 Jkt 244001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 48813 at DataClearance@FERC.gov, telephone at (202) 502–8663, and fax at (202) 273– 0873. SUPPLEMENTARY INFORMATION: Title: FERC–725, Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards. OMB Control No.: 1902–0225. Type of Request: Three-year extension of the FERC–725 information collection requirements with no changes to the current reporting and recordkeeping requirements.1 Abstract: The FERC–725 contains the following information collection elements: Self Assessment and ERO (Electric Reliability Organization) Application: The Commission requires the ERO to submit to FERC a performance assessment report every five years. The next assessment is due in 2019. Each Regional Entity submits a performance assessment report to the ERO. Submitting an application to become the ERO is also part of this collection.2 Reliability Assessments: 18 CFR 39.11 requires the ERO to assess the reliability and adequacy of the Bulk-Power System in North America. Subsequently, the ERO must report to the Commission on its findings. Regional entities perform similar assessments within individual regions. Currently the ERO submits to FERC three assessments each year: Long term, winter, and summer. In addition, the North American Electric Reliability Corporation (NERC, the Commissionapproved ERO) also submits various other assessments as needed. Reliability Standards Development: Under section 215 of the FPA, the ERO is charged with developing Reliability Standards. Regional Entities may also develop regional specific standards. Reliability Compliance: Reliability Standards are mandatory and enforceable upon approval by the Commission. In addition to the specific information collection requirements contained in each standard (cleared under other information collections), there are general compliance, monitoring and enforcement 1 As of 9/19/2018, a package for the ‘‘nonsubstantive’’ changes to FERC–725, implemented in the Final Rule in Docket No. RM18–2–000, is pending review at the Office of Management and Budget (OMB). The burden estimates provided in this Notice use those same burden estimates. 2 The Commission does not expect any new ERO applications to be submitted in the next five years and is not including any burden for this requirement in the burden estimate. FERC still seeks to renew the regulations pertaining to a new ERO application under this renewal but is expecting the burden to be zero for the foreseeable future. 18 CFR 39.3 contains the regulation pertaining to ERO applications. E:\FR\FM\27SEN1.SGM 27SEN1

Agencies

[Federal Register Volume 83, Number 188 (Thursday, September 27, 2018)]
[Notices]
[Pages 48812-48813]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-21054]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2336-094]


Georgia Power Company; Notice of Modification of Procedural 
Schedule and Waiver of the Commission's Regulatory Deadline for Scoping 
and Environmental Site Review

    Take notice that the Commission's regulatory deadline for scoping 
and environmental site review for the following hydroelectric 
application is waived, and the schedule for processing the 
hydroelectric application has been modified.
    a. Type of Filing: Notice of Intent to File License Application for 
a New License and Commencing Pre-filing Process.
    b. Project No.: 2336-094.
    c. Dated Filed: July 3, 2018.
    d. Submitted By: Georgia Power Company (Georgia Power).
    e. Name of Project: Lloyd Shoals Hydroelectric Project.
    f. Location: The project is located on the Ocmulgee River in Butts, 
Henry, Jasper, and Newton Counties, Georgia. No federal lands have been 
identified within the project boundary.
    g. Filed Pursuant to: 18 CFR part 5 of the Commission's 
Regulations.
    h. Potential Applicant Contact: Courtenay R. O'Mara, P.E., Hydro 
Licensing and Compliance Supervisor, Southern Company Generation, 241 
Ralph McGill Boulevard NE, BIN 10193, Atlanta, GA 30308-3374; (404) 
506-7219; or [email protected].
    i. FERC Contact: Navreet Deo at (202) 502-6304, or email at 
[email protected].
    j. Scoping Meetings: The Commission's August 20, 2018, Notice of 
Commencement of Proceedings, and Commission staff's Scoping Document 1, 
established September 13, 2018, as the date for the public scoping 
meetings, and September 14, 2018, as the date for the environmental 
site review. The Commission's September 12, 2018, Notice of 
Cancellation of Scoping and Site Review canceled the meetings until 
further notice due to Hurricane Florence. With this notice, the 
Commission waives the regulatory deadline of scoping and site review 
within 30 days of the Notice of Commencement of Proceedings and Scoping 
Document 1, and establishes the following revised dates and locations 
for the scoping meetings and site review:

Daytime Scoping Meeting--Jackson, Georgia
    Date & Time: Tuesday, October 9, 2018, at 1 p.m.
    Location: Pepper Sprout Barn, 562 Old Bethel Road, Jackson, Georgia 
30233, (678) 752-1550

Evening Scoping Meeting--Jackson, Georgia
    Date & Time: Tuesday, October 9, 2018, at 6:30 p.m.
    Location: Pepper Sprout Barn, 562 Old Bethel Road, Jackson, Georgia 
30233, (678) 752-1550

Environmental Site Review

    The potential applicant and Commission staff will conduct an 
environmental site review of the project on Wednesday, October 10, 
2018, consisting of facility tours from 9:00 a.m. to 12:00 p.m., and 
boat tours from 1:00 p.m. to 4:00 p.m. All participants should meet at 
the Jackson Land Management Office located at 180 Dam Road, Jackson, 
Georgia 30233.

[[Page 48813]]

Participants must notify Courtenay O'Mara at 
[email protected], or (404) 506-7219, on or before October 3, 
2018, if they plan to attend the environmental site review.
    k. Procedural Schedule: The application will be processed according 
to the following schedule. Revisions to the schedule may be made as 
appropriate. If a date falls on a weekend or holiday, the due date will 
be the following business day.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Public Scoping Meetings and Environmental   October 9, 2018 & October
 Site Review.                                10, 2018.
File Comments on PAD, SD1, and Study        November 5, 2018.
 Requests.
Commission Issues SD2, if necessary.......  December 20, 2018.
File Proposed Study Plan..................  December 20, 2018.
Study Plan Meetings.......................  January 22, 2019.
File Comments on Proposed Study Plan......  March 20, 2019.
File Revised Proposed Study Plan..........  April 19, 2019.
File Comments on Revised Proposed Study     May 6, 2019.
 Plan.
Commission Issues Study Plan Determination  May 20, 2019.
------------------------------------------------------------------------


    Dated: September 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-21054 Filed 9-26-18; 8:45 am]