Combined Notice of Filings, 48303 [2018-20735]

Download as PDF amozie on DSK3GDR082PROD with NOTICES1 Federal Register / Vol. 83, No. 185 / Monday, September 24, 2018 / Notices Dated: September 18, 2018. Kimberly D. Bose, Secretary. Dated: September 12, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–20688 Filed 9–21–18; 8:45 am] [FR Doc. 2018–20685 Filed 9–21–18; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project No. 2336–094] Combined Notice of Filings Georgia Power Company; Notice of Cancellation of Scoping and Site Review Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Take notice that the scoping meetings and site review for the following hydroelectric application are cancelled and will be rescheduled for a future date. a. Type of Application: Notice of Intent to File License Application for a New License and Commencing Prefiling Process. b. Project No.: 2336–094. c. Dated Filed: July 3, 2018. d. Applicant: Georgia Power Company (Georgia Power). e. Name of Project: Lloyd Shoals Hydroelectric Project (Lloyd Shoals Project, or project). f. Location: The project is located on the Ocmulgee River in Butts, Henry, Jasper, and Newton Counties, Georgia. No federal lands have been identified within the project boundary. g. Filed Pursuant to: 18 CFR part 5 of the Commission’s Regulations. h. Potential Applicant Contact: Courtenay R. O’Mara, P.E., Hydro Licensing and Compliance Supervisor, Southern Company Generation, 241 Ralph McGill Boulevard NE, BIN 10193, Atlanta, GA 30308–3374; (404) 506– 7219, or g2jacksonrel@southernco.com. i. FERC Contact: Navreet Deo at (202) 502–6304, or by email at navreet.deo@ ferc.gov. j. Scoping Meetings: The Commission’s August 20, 2018, Notice of Commencement of Proceedings, and Commission staff’s Scoping Document 1, established September 13, 2018, as the date for the project scoping meetings, and September 14, 2018, as the date for the environmental site review. Due to Hurricane Florence, the Commission is postponing the scoping meetings and site review until further notice. As soon as new plans can be established, the Commission will issue a new notice of scoping, along with a modification to the procedural schedule, including revised dates for the scoping meetings and site review. The application will be processed according to the revised schedule. Filings Instituting Proceedings VerDate Sep<11>2014 17:40 Sep 21, 2018 Jkt 244001 Docket Numbers: RP18–1179–000. Applicants: BP Energy Company, Riverbend Oil & Gas VIII, L.L.C. Description: Joint Petition for Temporary Waivers of Capacity Release Policies and Regulations, et al. of BP Energy Company, et al. Filed Date: 9/14/18. Accession Number: 20180914–5082. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: RP18–1180–000. Applicants: Columbia Gas Transmission, LLC. Description: § 4(d) Rate Filing: TCO Essential Power Neg Rate Agmt to be effective 9/14/2018. Filed Date: 9/14/18. Accession Number: 20180914–5083. Comments Due: 5 p.m. ET 9/26/18. Docket Numbers: RP18–1181–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 091418 Negotiated Rates—Mercuria Energy America, Inc. H–7540–89 to be effective 11/1/2018. Filed Date: 9/14/18. Accession Number: 20180914–5108. Comments Due: 5 p.m. ET 9/26/18. Docket Numbers: RP18–1182–000. Applicants: Tallgrass Interstate Gas Transmission, LLC. Description: § 4(d) Rate Filing: Neg Rate 2018–09–14 Valero to be effective 9/14/2018. Filed Date: 9/14/18. Accession Number: 20180914–5182. Comments Due: 5 p.m. ET 9/26/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 48303 intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 17, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–20735 Filed 9–21–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–156–000. Applicants: American Transmission Systems, Incorporated. Description: Application for Authorization of Transaction under Section 203 of the Federal Power Act, et al. of American Transmission Systems, Incorporated. Filed Date: 9/14/18. Accession Number: 20180914–5186. Comments Due: 5 p.m. ET 10/5/18. Docket Numbers: EC18–157–000. Applicants: Wisconsin Public Service Corporation, Wisconsin Power and Light Company, Wisconsin River Power Company. Description: Joint Application for Authorization under Section 203 of the Federal Power Act of Wisconsin Public Service Corporation, et al. Filed Date: 9/14/18. Accession Number: 20180914–5197. Comments Due: 5 p.m. ET 10/5/18. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG18–125–000. Applicants: MC Project Company LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of MC Project Company LLC. Filed Date: 9/17/18. Accession Number: 20180917–5103. Comments Due: 5 p.m. ET 10/9/18. Docket Numbers: EG18–126–000. Applicants: LMBE Project Company LLC. Description: Notice of SelfCertification of Exempt Wholesale E:\FR\FM\24SEN1.SGM 24SEN1

Agencies

[Federal Register Volume 83, Number 185 (Monday, September 24, 2018)]
[Notices]
[Page 48303]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-20735]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP18-1179-000.
    Applicants: BP Energy Company, Riverbend Oil & Gas VIII, L.L.C.
    Description: Joint Petition for Temporary Waivers of Capacity 
Release Policies and Regulations, et al. of BP Energy Company, et al.
    Filed Date: 9/14/18.
    Accession Number: 20180914-5082.
    Comments Due: 5 p.m. ET 9/21/18.

    Docket Numbers: RP18-1180-000.
    Applicants: Columbia Gas Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: TCO Essential Power Neg Rate 
Agmt to be effective 9/14/2018.
    Filed Date: 9/14/18.
    Accession Number: 20180914-5083.
    Comments Due: 5 p.m. ET 9/26/18.

    Docket Numbers: RP18-1181-000.
    Applicants: Iroquois Gas Transmission System, L.P.
    Description: Sec.  4(d) Rate Filing: 091418 Negotiated Rates--
Mercuria Energy America, Inc. H-7540-89 to be effective 11/1/2018.
    Filed Date: 9/14/18.
    Accession Number: 20180914-5108.
    Comments Due: 5 p.m. ET 9/26/18.

    Docket Numbers: RP18-1182-000.
    Applicants: Tallgrass Interstate Gas Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: Neg Rate 2018-09-14 Valero to 
be effective 9/14/2018.
    Filed Date: 9/14/18.
    Accession Number: 20180914-5182.
    Comments Due: 5 p.m. ET 9/26/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 17, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-20735 Filed 9-21-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.