ORNI 41 LLC, Supplemental Notice that Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 48300-48301 [2018-20732]

Download as PDF 48300 Federal Register / Vol. 83, No. 185 / Monday, September 24, 2018 / Notices Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: September 12, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–20684 Filed 9–21–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–506–000] amozie on DSK3GDR082PROD with NOTICES1 Portland Natural Gas Transmission System; Notice of Schedule for Environmental Review of the Portland Xpress Project On June 18, 2018, Portland Natural Gas Transmission System filed an application in Docket No. CP18–506– 000 requesting a Certificate of Public Convenience and Necessity pursuant to Section 7(c) of the Natural Gas Act to construct and operate certain natural gas pipeline facilities in Cumberland and York Counties, Maine and Middlesex County, Massachusetts. The proposed project is known as the Portland Xpress Project (Project), and it would provide transportation of natural gas to New England and Atlantic Canada markets by supplying 214,375 million cubic feet per day (Mcf/d) of natural gas to New England on wholly-owned PNGTS facilities and 22,339 Mcf/d on the PNGTS and Maritimes jointly-owned facilities. On June 28, 2018, the Federal Energy Regulatory Commission (Commission or FERC) issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s Environmental Assessment (EA) for the Project. This instant notice identifies the FERC staff’s planned VerDate Sep<11>2014 17:40 Sep 21, 2018 Jkt 244001 schedule for the completion of the EA for the Project. Schedule for Environmental Review Issuance of EA—November 27, 2018. 90-day Federal—Authorization Decision Deadline February 25, 2019. If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. Project Description The Project would require modifications at the existing Westbrook Compressor Station in Cumberland County, Maine; the addition of one new 6,300 horsepower gas-fired compression unit at the Eliot Compressor Station in York County, Maine; and installation of miscellaneous facilities at the Dracut Meter and Regulator Station in Middlesex County, Massachusetts. Background On July 12, 2018, the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the Proposed Portland Xpress Project and Request for Comments on Environmental Issues (NOI). The NOI was sent to affected landowners within 0.5 mile of the existing facilities; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. In response to the NOI, the Commission received comments regarding vegetated areas of concern at the Eliot Compressor Station and well water testing. Additional Information In order to receive notification of the issuance of the EA and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC website (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP18–506), and follow the instructions. For assistance with access PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: September 18, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–20678 Filed 9–21–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–2435–000] ORNI 41 LLC, Supplemental Notice that Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of ORNI 41 LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is October 9, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the E:\FR\FM\24SEN1.SGM 24SEN1 Federal Register / Vol. 83, No. 185 / Monday, September 24, 2018 / Notices Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 18, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–20732 Filed 9–21–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: amozie on DSK3GDR082PROD with NOTICES1 Filings Instituting Proceedings Docket Number: PR18–67–001. Applicants: Pacific Gas and Electric Company. Description: Tariff filing per 284.123(b),(e)+(g): Amendment to Revisions to SOC 2018 Annual Gas True-Up filing to be effective 1/1/2018. Filed Date: 9/12/18. Accession Number: 201809125034. Comments Due: 5 p.m. ET 10/3/18. 284.123(g) Protests Due: 5 p.m. ET 10/3/18. Docket Numbers: RP18–1183–000. Applicants: SWN Energy Services Company, LLC, Flywheel Energy Operating, LLC. Description: Joint Petition for Temporary Waivers of Capacity Release Regulations and Policies, et al. of SWN Energy Services Company, LLC, et al. Filed Date: 9/17/18. Accession Number: 20180917–5084. Comments Due: 5 p.m. ET 9/24/18. Docket Numbers: RP18–1184–000. Applicants: El Paso Natural Gas Company, L.L.C. Description: Penalty Crediting Report of El Paso Natural Gas Company, L.L.C. Filed Date: 9/17/18. Accession Number: 20180917–5092. Comments Due: 5 p.m. ET 10/1/18. VerDate Sep<11>2014 17:40 Sep 21, 2018 Jkt 244001 Docket Numbers: RP18–1185–000 Applicants: Northern Natural Gas Company. Description: § 4(d) Rate Filing: 20180917 Negotiated Rates to be effective 9/18/2018. Filed Date: 9/17/18. Accession Number: 20180917–5115. Comments Due: 5 p.m. ET 10/1/18. Docket Numbers: RP18–1186–000. Applicants: Northern Natural Gas Company. Description: § 4(d) Rate Filing: 20180917 Remove Non Conforming to be effective 11/1/2018. Filed Date: 9/17/18. Accession Number: 20180917–5116. Comments Due: 5 p.m. ET 10/1/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 18, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–20730 Filed 9–21–18; 8:45 am] BILLING CODE 6717–01–P 48301 the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 3, 2018. Dated: September 12, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–20680 Filed 9–21–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. ID–8547–000] Rogers, Bryan S.; Notice of Filing Take notice that on September 12, 2018, Bryan S. Rogers, submitted for filing an, application for authority to hold interlocking positions, pursuant to section 305(b) of the Federal Power Act, 16 U.S.C. 825d(b) and section 45 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR part 45 (2018). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG18–127–000. Applicants: Latitude Solar Center, LLC. Description: Self-Certification of EG of Latitude Solar Center, LLC. Filed Date: 9/17/18. Accession Number: 20180917–5126. Comments Due: 5 p.m. ET 10/9/18. Take notice that the Commission received the following electric rate filings: E:\FR\FM\24SEN1.SGM 24SEN1

Agencies

[Federal Register Volume 83, Number 185 (Monday, September 24, 2018)]
[Notices]
[Pages 48300-48301]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-20732]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER18-2435-000]


ORNI 41 LLC, Supplemental Notice that Initial Market-Based Rate 
Filing Includes Request for Blanket Section 204 Authorization

    This is a supplemental notice in the above-referenced proceeding of 
ORNI 41 LLC's application for market-based rate authority, with an 
accompanying rate tariff, noting that such application includes a 
request for blanket authorization, under 18 CFR part 34, of future 
issuances of securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is October 9, 2018.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the

[[Page 48301]]

Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the website that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
[email protected]. or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: September 18, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-20732 Filed 9-21-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.