Preparation of Environmental Reports for Nuclear Power Stations, 48346 [2018-20699]
Download as PDF
48346
Federal Register / Vol. 83, No. 185 / Monday, September 24, 2018 / Notices
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
For the Nuclear Regulatory Commission.
Bruce A. Watson,
Chief, Reactor Decommissioning Branch,
Division of Decommissioning, Uranium
Recovery, and Waste Programs, Office of
Nuclear Material Safety and Safeguards.
FOR FURTHER INFORMATION CONTACT:
[FR Doc. 2018–20645 Filed 9–21–18; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2017–0041]
Preparation of Environmental Reports
for Nuclear Power Stations
amozie on DSK3GDR082PROD with NOTICES1
I. Discussion
The U.S. Nuclear Regulatory
Commission (NRC) is issuing Revision 3
of Regulatory Guide (RG) 4.2,
‘‘Preparation of Environmental Reports
for Nuclear Power Stations.’’ This
revision provides general guidance to
applicants for the format and content of
environmental reports (ERs) that are
submitted as part of an application for
a permit, license, or other approval for
a new nuclear power plant.
DATES: Revision 3 to RG 4.2 is available
on September 24, 2018.
ADDRESSES: Please refer to Docket ID
NRC–2017–0041 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2017–0041. Address
questions about dockets IDs in
Regulations.gov to Jennifer Borges;
telephone: 301–287–9127; email:
Jennifer.Borges@nrc.gov. For technical
questions, contact the individuals listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. Revision 3 to RG 4.2 and the
regulatory analysis may be found in
ADAMS under Accession Nos.
ML18071A400 and ML16116A067,
respectfully.
VerDate Sep<11>2014
17:40 Sep 21, 2018
Jkt 244001
The NRC is issuing Revision 3 of RG
4.2, ‘‘Preparation of Environmental
Reports for Nuclear Power Stations,’’ as
a guide in the NRC’s ‘‘Regulatory
Guide’’ series. This series was
developed to describe and make
available to the public information
regarding methods that are acceptable to
the NRC staff for implementing specific
parts of the NRC’s regulations,
techniques that the staff uses in
evaluating specific problems or
postulated events, and data that the staff
needs from applicants in its review of
applications for permits and licenses.
The present guide dates to 1976, and an
update was needed to align it with
changes in NRC regulations since 1976,
changes in environmental statutes and
regulations, and Executive Orders.
Consequently the guide was updated to
provide general guidelines for the
preparation of environmental reports
supporting an application for a permit,
license, or other approval for a new
nuclear power plant. The information
requested from applicants in this RG is
based on the requirements contained in
part 51 of title 10 of the Code of Federal
Regulations (10 CFR), ‘‘Environmental
Protection Regulations for Domestic
Licensing and Related Regulatory
Functions.’’ Guidance from the interim
staff guidance, as it relates to
information that applicants should
include in an environmental report, was
incorporated into this RG, as
appropriate. The entirety of interim staff
guidance will be terminated when it is
incorporated into permanent staff
guidance in consistent with staff
guidance such as NUREG–1555,
‘‘Environmental Standard Review Plan:
Standard Review Plans for
Environmental Reviews for Nuclear
Power Plants’’ (ADAMS Accession Nos.
ML003702134 and ML003701937).
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
The NRC published a notice of the
availability of the proposed revision,
temporarily identified by draft
regulatory guide (DG) number, DG–4026
for public comment in the Federal
Register on February 13, 2017 (82 FR
10502) for a 60-day period. The public
comment period was extended to May
31, 2017 (82 FR 15544), based upon a
request from the Nuclear Energy
Institute. The staff responses to the
public comments are available under
ADAMS under Accession No.
ML18071A401.
III. Congressional Review Act
SUPPLEMENTARY INFORMATION:
Nuclear Regulatory
Commission.
ACTION: Regulatory Guide; issuance.
AGENCY:
SUMMARY:
Jennifer Davis, Office of New Reactors,
telephone: 301–415–3835, email:
Jennifer.Davis@nrc.gov and Edward
O’Donnell, Office of Nuclear Regulatory
Research, telephone: 301–415–3317,
email: Edward.ODonnell@nrc.gov. Both
are staff of the U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
II. Additional Information
This RG is a rule as defined in the
Congressional Review Act (5 U.S.C.
801–808). However, the Office of
Management and Budget has not found
it to be a major rule as defined in the
Congressional Review Act.
IV. Backfitting and Issue Finality
Issuance of this RG does not
constitute backfitting as defined in 10
CFR 50.109 (the Backfit Rule), nor
would it be regarded as backfitting
under Commission and Executive
Director for Operations guidance, and is
not otherwise inconsistent with the
issue finality provisions in 10 CFR part
52.
Dated at Rockville, Maryland, this 19th day
of September 2018.
For the Nuclear Regulatory Commission.
Thomas H. Boyce,
Chief, Regulatory Guidance and Generic
Issues Branch, Division of Engineering, Office
of Nuclear Regulatory Research.
[FR Doc. 2018–20699 Filed 9–21–18; 8:45 am]
BILLING CODE 7590–01–P
SECURITIES AND EXCHANGE
COMMISSION
[Securities Exchange Act of 1934; Release
No. 84210/September 19, 2018; Investment
Company Act of 1940; Release No. 33240/
September 19, 2018]
Order Under Section 15B, Section 17A
and Section 36 of the Securities
Exchange Act of 1934 Granting
Exemptions From Specified Provisions
of the Exchange Act and Certain Rules
Thereunder; Order Under Section 6(c)
and Section 38(a) of the Investment
Company Act of 1940 Granting
Exemptions From Specified Provisions
of the Investment Company Act and
Certain Rules Thereunder
On September 14, 2018, Hurricane
Florence made landfall near the North
Carolina and South Carolina border. The
storm and subsequent flooding has
E:\FR\FM\24SEN1.SGM
24SEN1
Agencies
[Federal Register Volume 83, Number 185 (Monday, September 24, 2018)]
[Notices]
[Page 48346]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-20699]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2017-0041]
Preparation of Environmental Reports for Nuclear Power Stations
AGENCY: Nuclear Regulatory Commission.
ACTION: Regulatory Guide; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing
Revision 3 of Regulatory Guide (RG) 4.2, ``Preparation of Environmental
Reports for Nuclear Power Stations.'' This revision provides general
guidance to applicants for the format and content of environmental
reports (ERs) that are submitted as part of an application for a
permit, license, or other approval for a new nuclear power plant.
DATES: Revision 3 to RG 4.2 is available on September 24, 2018.
ADDRESSES: Please refer to Docket ID NRC-2017-0041 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2017-0041. Address
questions about dockets IDs in Regulations.gov to Jennifer Borges;
telephone: 301-287-9127; email: [email protected]. For technical
questions, contact the individuals listed in the FOR FURTHER
INFORMATION CONTACT section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. Revision 3 to RG 4.2 and the
regulatory analysis may be found in ADAMS under Accession Nos.
ML18071A400 and ML16116A067, respectfully.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Jennifer Davis, Office of New
Reactors, telephone: 301-415-3835, email: [email protected] and
Edward O'Donnell, Office of Nuclear Regulatory Research, telephone:
301-415-3317, email: [email protected]. Both are staff of the
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Discussion
The NRC is issuing Revision 3 of RG 4.2, ``Preparation of
Environmental Reports for Nuclear Power Stations,'' as a guide in the
NRC's ``Regulatory Guide'' series. This series was developed to
describe and make available to the public information regarding methods
that are acceptable to the NRC staff for implementing specific parts of
the NRC's regulations, techniques that the staff uses in evaluating
specific problems or postulated events, and data that the staff needs
from applicants in its review of applications for permits and licenses.
The present guide dates to 1976, and an update was needed to align it
with changes in NRC regulations since 1976, changes in environmental
statutes and regulations, and Executive Orders. Consequently the guide
was updated to provide general guidelines for the preparation of
environmental reports supporting an application for a permit, license,
or other approval for a new nuclear power plant. The information
requested from applicants in this RG is based on the requirements
contained in part 51 of title 10 of the Code of Federal Regulations (10
CFR), ``Environmental Protection Regulations for Domestic Licensing and
Related Regulatory Functions.'' Guidance from the interim staff
guidance, as it relates to information that applicants should include
in an environmental report, was incorporated into this RG, as
appropriate. The entirety of interim staff guidance will be terminated
when it is incorporated into permanent staff guidance in consistent
with staff guidance such as NUREG-1555, ``Environmental Standard Review
Plan: Standard Review Plans for Environmental Reviews for Nuclear Power
Plants'' (ADAMS Accession Nos. ML003702134 and ML003701937).
II. Additional Information
The NRC published a notice of the availability of the proposed
revision, temporarily identified by draft regulatory guide (DG) number,
DG-4026 for public comment in the Federal Register on February 13, 2017
(82 FR 10502) for a 60-day period. The public comment period was
extended to May 31, 2017 (82 FR 15544), based upon a request from the
Nuclear Energy Institute. The staff responses to the public comments
are available under ADAMS under Accession No. ML18071A401.
III. Congressional Review Act
This RG is a rule as defined in the Congressional Review Act (5
U.S.C. 801-808). However, the Office of Management and Budget has not
found it to be a major rule as defined in the Congressional Review Act.
IV. Backfitting and Issue Finality
Issuance of this RG does not constitute backfitting as defined in
10 CFR 50.109 (the Backfit Rule), nor would it be regarded as
backfitting under Commission and Executive Director for Operations
guidance, and is not otherwise inconsistent with the issue finality
provisions in 10 CFR part 52.
Dated at Rockville, Maryland, this 19th day of September 2018.
For the Nuclear Regulatory Commission.
Thomas H. Boyce,
Chief, Regulatory Guidance and Generic Issues Branch, Division of
Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2018-20699 Filed 9-21-18; 8:45 am]
BILLING CODE 7590-01-P