Environmental Impact Statements; Notice of Availability, 47922 [2018-20531]

Download as PDF 47922 Federal Register / Vol. 83, No. 184 / Friday, September 21, 2018 / Notices authority to confirm, approve, and place such rates into effect on an interim basis to the Deputy Secretary of Energy; and (3) the authority to confirm, approve, and place into effect on a final basis, to remand, or to disapprove such rates to the Federal Energy Regulatory Commission (FERC). This extension is issued pursuant to the Delegation Order and DOE rate extension procedures documented at 10 CFR 903.23(a). BACKGROUND On August 22, 2013, FERC confirmed, approved, and placed into effect on a final basis Intertie Transmission Service Rate Schedules INT-FT5 and INT-NFT4 under Rate Order No. WAPA-157.1 These transmission service rate schedules were approved for 5-year period beginning May 1, 2013, and ending April 30, 2018. Pursuant to 10 CFR 903.23(a), WAPA filed a notice in the Federal Register on March 9, 2018, proposing to extend Rate Schedules INT-FT5 and INT-NFT4 under Rate Order No. WAPA-181 (83 FR 10475). WAPA held a consultation and comment period on the proposed rate extension but did not conduct a public information forum or public comment forum. WAPA received no comments during the consultation and comment period, which ended on April 9, 2018. DISCUSSION On April 30, 2018, existing Rate Schedules INT-FT5 and INT-NFT4 expired. Pursuant to Delegation Order No. 00-037.00B, Section 1.5, rates for short-term sales were approved by WAPA’s Administrator to cover the period between May 1, 2018, and the date the rate extension goes into effect or October 31, 2018, whichever occurs first. The existing transmission service rates provide adequate revenue to pay all annual costs, including interest expense, and to repay required investment according to the cost recovery criteria set forth in DOE Order RA 6120.2. Rate Order No. WAPA-181, which extends the existing rate schedules through September 30, 2020, ensures adequate revenue to pay all annual costs for the allowable period. daltland on DSKBBV9HB2PROD with NOTICES [FR Doc. 2018–20597 Filed 9–20–18; 8:45 am] BILLING CODE 6450–01–P 1 FERC confirmed and approved Rate Order No. WAPA-157 on August 22, 2013, in Docket No. EF13–4–000. See Order Confirming and Approving Rate Schedules on a Final Basis, 144 FERC ¶ 61,143. VerDate Sep<11>2014 17:30 Sep 20, 2018 Jkt 244001 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9041–4] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–5632 or https://www.epa.gov/ nepa/. Weekly receipt of Environmental Impact Statements Filed 09/10/2018 Through 09/14/2018 Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxnodengn.epa.gov/cdx-enepa-public/ action/eis/search. EIS No. 20180212, Final, USFS, IL, Cretaceous Hills Ecological Restoration Project, Review Period Ends: 10/22/2018, Contact: Leonard Pitcher 618–833–8576 EIS No. 20180213, Draft, BLM, NV, Rossi Mine Expansion Project, Comment Period Ends: 11/05/2018, Contact: Janice Stadelman 775–753– 0346 EIS No. 20180214, Draft, FRA, MS, Port Bienville Railroad Draft Environmental Impact Statement, Comment Period Ends: 11/05/2018, Contact: Kevin Wright 202–493–0845 EIS No. 20180215, Draft, FERC, LA, Driftwood LNG Project Draft Environmental Impact Statement, Comment Period Ends: 11/05/2018, Contact: Kelley Munoz 202–502–6739 EIS No. 20180216, Draft Supplement, DOS, NE, Draft Supplemental Environmental Impact Statement Keystone XL Mainline Alternative Route, Comment Period Ends: 11/05/2018, Contact: Marko Velikonja 202–647–4828 EIS No. 20180217, Draft, BIA, CA, Draft Environmental Impact Statement, Tule River Indian Tribe—Fee-to-Trust and Eagle Mountain Casino Relocation Project, Comment Period Ends: 11/05/2018, Contact: Chad Broussard 916–978–6165 EIS No. 20180218, Draft Supplement, BR, CA, California WaterFix EIS EIR, Comment Period Ends: 11/05/2018, Contact: Brooke White 916–414–2402 EIS No. 20180219, Final, USACE, CA, Delta Islands and Levees Integrated Feasibility Study and Environmental Impact Study, Review Period Ends: 10/22/2018, Contact: Anne Baker 916–557–7277 PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 Amended Notices EIS No. 20180211, Final, NIGC, CA, ADOPTION—Wilton Rancheria, Review Period Ends: 10/15/2018, Contact: Austin Badger 202–632– 7003. Revision to the FR Notice Published 9/14/2018: The National Indian Gaming Commission (NIGC) has adopted the U.S. Bureau of Indian Affairs Final EIS No. 20160300, filed 12/08/2016 with the EPA. NIGC was not a cooperating agency on this project. Therefore, recirculation of the document is necessary under Section 1506.3(b) of the CEQ Regulations. Dated: September 17, 2018. Robert Tomiak, Director, Office of Federal Activities. [FR Doc. 2018–20531 Filed 9–20–18; 8:45 am] BILLING CODE 6560–50–P DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Proposed Information Collection Activity; Comment Request Title: Phase II Evaluation Activities for Implementing a Next Generation Evaluation Agenda for the Chafee Foster Care Independence Program— Extension. OMB No.: 0970–0489. Description: The Administration for Children and Families (ACF), Office of Planning Research and Evaluation (OPRE) is proposing an extension to a currently approved information collection (OMB no. 0970–0489). The information collection activities are part of the Phase II Evaluation Activities for Implementing a Next Generation Evaluation Agenda for the Chafee Foster Care Independence Program (now known as the Chafee Foster Care Program for Successful Transition to Adulthood). The purpose of the extension is to continue the ongoing information collection, which consists of site visits by staff from the Urban Institute and Chapin Hall at the University of Chicago to conduct formative evaluations of programs serving transition-age foster youth. The evaluations include preliminary visits to discuss the evaluation process with program administrators and site visits to each program to speak with program leaders, partners and key stakeholders, front-line staff, and participants. These formative evaluations will determine programs’ readiness for more rigorous evaluation in the future. The activities and products from this project will help E:\FR\FM\21SEN1.SGM 21SEN1

Agencies

[Federal Register Volume 83, Number 184 (Friday, September 21, 2018)]
[Notices]
[Page 47922]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-20531]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9041-4]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-5632 or https://www.epa.gov/nepa/ nepa/.

Weekly receipt of Environmental Impact Statements
Filed 09/10/2018 Through 09/14/2018
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.

EIS No. 20180212, Final, USFS, IL, Cretaceous Hills Ecological 
Restoration Project, Review Period Ends: 10/22/2018, Contact: Leonard 
Pitcher 618-833-8576
EIS No. 20180213, Draft, BLM, NV, Rossi Mine Expansion Project, Comment 
Period Ends: 11/05/2018, Contact: Janice Stadelman 775-753-0346
EIS No. 20180214, Draft, FRA, MS, Port Bienville Railroad Draft 
Environmental Impact Statement, Comment Period Ends: 11/05/2018, 
Contact: Kevin Wright 202-493-0845
EIS No. 20180215, Draft, FERC, LA, Driftwood LNG Project Draft 
Environmental Impact Statement, Comment Period Ends: 11/05/2018, 
Contact: Kelley Munoz 202-502-6739
EIS No. 20180216, Draft Supplement, DOS, NE, Draft Supplemental 
Environmental Impact Statement Keystone XL Mainline Alternative Route, 
Comment Period Ends: 11/05/2018, Contact: Marko Velikonja 202-647-4828
EIS No. 20180217, Draft, BIA, CA, Draft Environmental Impact Statement, 
Tule River Indian Tribe--Fee-to-Trust and Eagle Mountain Casino 
Relocation Project, Comment Period Ends: 11/05/2018, Contact: Chad 
Broussard 916-978-6165
EIS No. 20180218, Draft Supplement, BR, CA, California WaterFix EIS 
EIR, Comment Period Ends: 11/05/2018, Contact: Brooke White 916-414-
2402
EIS No. 20180219, Final, USACE, CA, Delta Islands and Levees Integrated 
Feasibility Study and Environmental Impact Study, Review Period Ends: 
10/22/2018, Contact: Anne Baker 916-557-7277

Amended Notices

EIS No. 20180211, Final, NIGC, CA, ADOPTION--Wilton Rancheria, Review 
Period Ends: 10/15/2018, Contact: Austin Badger 202-632-7003. Revision 
to the FR Notice Published 9/14/2018: The National Indian Gaming 
Commission (NIGC) has adopted the U.S. Bureau of Indian Affairs Final 
EIS No. 20160300, filed 12/08/2016 with the EPA. NIGC was not a 
cooperating agency on this project. Therefore, recirculation of the 
document is necessary under Section 1506.3(b) of the CEQ Regulations.

    Dated: September 17, 2018.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2018-20531 Filed 9-20-18; 8:45 am]
 BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.