Environmental Impact Statements; Notice of Availability, 47922 [2018-20531]
Download as PDF
47922
Federal Register / Vol. 83, No. 184 / Friday, September 21, 2018 / Notices
authority to confirm, approve, and place
such rates into effect on an interim basis
to the Deputy Secretary of Energy; and
(3) the authority to confirm, approve,
and place into effect on a final basis, to
remand, or to disapprove such rates to
the Federal Energy Regulatory
Commission (FERC). This extension is
issued pursuant to the Delegation Order
and DOE rate extension procedures
documented at 10 CFR 903.23(a).
BACKGROUND
On August 22, 2013, FERC confirmed,
approved, and placed into effect on a
final basis Intertie Transmission Service
Rate Schedules INT-FT5 and INT-NFT4
under Rate Order No. WAPA-157.1
These transmission service rate
schedules were approved for 5-year
period beginning May 1, 2013, and
ending April 30, 2018.
Pursuant to 10 CFR 903.23(a), WAPA
filed a notice in the Federal Register on
March 9, 2018, proposing to extend Rate
Schedules INT-FT5 and INT-NFT4
under Rate Order No. WAPA-181 (83 FR
10475). WAPA held a consultation and
comment period on the proposed rate
extension but did not conduct a public
information forum or public comment
forum. WAPA received no comments
during the consultation and comment
period, which ended on April 9, 2018.
DISCUSSION
On April 30, 2018, existing Rate
Schedules INT-FT5 and INT-NFT4
expired. Pursuant to Delegation Order
No. 00-037.00B, Section 1.5, rates for
short-term sales were approved by
WAPA’s Administrator to cover the
period between May 1, 2018, and the
date the rate extension goes into effect
or October 31, 2018, whichever occurs
first. The existing transmission service
rates provide adequate revenue to pay
all annual costs, including interest
expense, and to repay required
investment according to the cost
recovery criteria set forth in DOE Order
RA 6120.2. Rate Order No. WAPA-181,
which extends the existing rate
schedules through September 30, 2020,
ensures adequate revenue to pay all
annual costs for the allowable period.
daltland on DSKBBV9HB2PROD with NOTICES
[FR Doc. 2018–20597 Filed 9–20–18; 8:45 am]
BILLING CODE 6450–01–P
1 FERC confirmed and approved Rate Order No.
WAPA-157 on August 22, 2013, in Docket No.
EF13–4–000. See Order Confirming and Approving
Rate Schedules on a Final Basis, 144 FERC ¶
61,143.
VerDate Sep<11>2014
17:30 Sep 20, 2018
Jkt 244001
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9041–4]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–5632 or https://www.epa.gov/
nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 09/10/2018 Through 09/14/2018
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20180212, Final, USFS, IL,
Cretaceous Hills Ecological
Restoration Project, Review Period
Ends: 10/22/2018, Contact: Leonard
Pitcher 618–833–8576
EIS No. 20180213, Draft, BLM, NV,
Rossi Mine Expansion Project,
Comment Period Ends: 11/05/2018,
Contact: Janice Stadelman 775–753–
0346
EIS No. 20180214, Draft, FRA, MS, Port
Bienville Railroad Draft
Environmental Impact Statement,
Comment Period Ends: 11/05/2018,
Contact: Kevin Wright 202–493–0845
EIS No. 20180215, Draft, FERC, LA,
Driftwood LNG Project Draft
Environmental Impact Statement,
Comment Period Ends: 11/05/2018,
Contact: Kelley Munoz 202–502–6739
EIS No. 20180216, Draft Supplement,
DOS, NE, Draft Supplemental
Environmental Impact Statement
Keystone XL Mainline Alternative
Route, Comment Period Ends:
11/05/2018, Contact: Marko Velikonja
202–647–4828
EIS No. 20180217, Draft, BIA, CA, Draft
Environmental Impact Statement,
Tule River Indian Tribe—Fee-to-Trust
and Eagle Mountain Casino
Relocation Project, Comment Period
Ends: 11/05/2018, Contact: Chad
Broussard 916–978–6165
EIS No. 20180218, Draft Supplement,
BR, CA, California WaterFix EIS EIR,
Comment Period Ends:
11/05/2018, Contact: Brooke White
916–414–2402
EIS No. 20180219, Final, USACE, CA,
Delta Islands and Levees Integrated
Feasibility Study and Environmental
Impact Study, Review Period Ends:
10/22/2018, Contact: Anne Baker
916–557–7277
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
Amended Notices
EIS No. 20180211, Final, NIGC, CA,
ADOPTION—Wilton Rancheria,
Review Period Ends: 10/15/2018,
Contact: Austin Badger 202–632–
7003. Revision to the FR Notice
Published 9/14/2018: The National
Indian Gaming Commission (NIGC)
has adopted the U.S. Bureau of Indian
Affairs Final EIS No. 20160300, filed
12/08/2016 with the EPA. NIGC was
not a cooperating agency on this
project. Therefore, recirculation of the
document is necessary under Section
1506.3(b) of the CEQ Regulations.
Dated: September 17, 2018.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2018–20531 Filed 9–20–18; 8:45 am]
BILLING CODE 6560–50–P
DEPARTMENT OF HEALTH AND
HUMAN SERVICES
Administration for Children and
Families
Proposed Information Collection
Activity; Comment Request
Title: Phase II Evaluation Activities
for Implementing a Next Generation
Evaluation Agenda for the Chafee Foster
Care Independence Program—
Extension.
OMB No.: 0970–0489.
Description: The Administration for
Children and Families (ACF), Office of
Planning Research and Evaluation
(OPRE) is proposing an extension to a
currently approved information
collection (OMB no. 0970–0489). The
information collection activities are part
of the Phase II Evaluation Activities for
Implementing a Next Generation
Evaluation Agenda for the Chafee Foster
Care Independence Program (now
known as the Chafee Foster Care
Program for Successful Transition to
Adulthood). The purpose of the
extension is to continue the ongoing
information collection, which consists
of site visits by staff from the Urban
Institute and Chapin Hall at the
University of Chicago to conduct
formative evaluations of programs
serving transition-age foster youth. The
evaluations include preliminary visits to
discuss the evaluation process with
program administrators and site visits to
each program to speak with program
leaders, partners and key stakeholders,
front-line staff, and participants. These
formative evaluations will determine
programs’ readiness for more rigorous
evaluation in the future. The activities
and products from this project will help
E:\FR\FM\21SEN1.SGM
21SEN1
Agencies
[Federal Register Volume 83, Number 184 (Friday, September 21, 2018)]
[Notices]
[Page 47922]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-20531]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9041-4]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-5632 or https://www.epa.gov/nepa/ nepa/.
Weekly receipt of Environmental Impact Statements
Filed 09/10/2018 Through 09/14/2018
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
EIS No. 20180212, Final, USFS, IL, Cretaceous Hills Ecological
Restoration Project, Review Period Ends: 10/22/2018, Contact: Leonard
Pitcher 618-833-8576
EIS No. 20180213, Draft, BLM, NV, Rossi Mine Expansion Project, Comment
Period Ends: 11/05/2018, Contact: Janice Stadelman 775-753-0346
EIS No. 20180214, Draft, FRA, MS, Port Bienville Railroad Draft
Environmental Impact Statement, Comment Period Ends: 11/05/2018,
Contact: Kevin Wright 202-493-0845
EIS No. 20180215, Draft, FERC, LA, Driftwood LNG Project Draft
Environmental Impact Statement, Comment Period Ends: 11/05/2018,
Contact: Kelley Munoz 202-502-6739
EIS No. 20180216, Draft Supplement, DOS, NE, Draft Supplemental
Environmental Impact Statement Keystone XL Mainline Alternative Route,
Comment Period Ends: 11/05/2018, Contact: Marko Velikonja 202-647-4828
EIS No. 20180217, Draft, BIA, CA, Draft Environmental Impact Statement,
Tule River Indian Tribe--Fee-to-Trust and Eagle Mountain Casino
Relocation Project, Comment Period Ends: 11/05/2018, Contact: Chad
Broussard 916-978-6165
EIS No. 20180218, Draft Supplement, BR, CA, California WaterFix EIS
EIR, Comment Period Ends: 11/05/2018, Contact: Brooke White 916-414-
2402
EIS No. 20180219, Final, USACE, CA, Delta Islands and Levees Integrated
Feasibility Study and Environmental Impact Study, Review Period Ends:
10/22/2018, Contact: Anne Baker 916-557-7277
Amended Notices
EIS No. 20180211, Final, NIGC, CA, ADOPTION--Wilton Rancheria, Review
Period Ends: 10/15/2018, Contact: Austin Badger 202-632-7003. Revision
to the FR Notice Published 9/14/2018: The National Indian Gaming
Commission (NIGC) has adopted the U.S. Bureau of Indian Affairs Final
EIS No. 20160300, filed 12/08/2016 with the EPA. NIGC was not a
cooperating agency on this project. Therefore, recirculation of the
document is necessary under Section 1506.3(b) of the CEQ Regulations.
Dated: September 17, 2018.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2018-20531 Filed 9-20-18; 8:45 am]
BILLING CODE 6560-50-P