Great Lakes Hydro America, LLC; Notice of Authorization for Continued Project Operation, 46934 [2018-20104]
Download as PDF
46934
Federal Register / Vol. 83, No. 180 / Monday, September 17, 2018 / Notices
Declaratory Order seeking approval of
the overall tariff rate structure and terms
and conditions of service, including the
proposed priority service prorationing
methodology for an expansion of major
segments of Medallion Pipeline
Company, LLC.’s crude oil pipeline
system, all as more fully explained in
the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on October 10, 2018.
Dated: September 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–20102 Filed 9–14–18; 8:45 am]
daltland on DSKBBV9HB2PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:47 Sep 14, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2520–000]
Great Lakes Hydro America, LLC;
Notice of Authorization for Continued
Project Operation
On August 31, 2016, Great Lakes
Hydro America, LLC, licensee for the
Mattaceunk Hydroelectric Project, filed
an Application for a New License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Mattaceunk
Hydroelectric Project is located on the
Penobscot River in Aroostook and
Penobscot counties, Maine, within the
town of Medway, Woodville,
Mattawamkeag, and the unorganized
township of Molunkus.
The license for Project No. 2520 was
issued for a period ending August 31,
2018. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2520
is issued to the licensee for a period
effective September 1, 2018 through
August 31, 2019, or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before August 30, 2019,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the licensee, Great Lakes Hydro
America, LLC, is authorized to continue
operation of the Mattaceunk
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
Dated: September 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–20104 Filed 9–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3562–025]
KEI (Maine) Power Management (III)
LLC; Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 3562–025.
c. Date Filed: July 26, 2018.
d. Submitted By: KEI (Maine) Power
Management (III) LLC.
e. Name of Project: Barker Mill Upper
Project.
f. Location: On the Little
Androscoggin River, in Androscoggin
County, Maine. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Lewis
C. Loon, KEI (USA) Power Management
Inc., 423 Brunswick Avenue, Gardiner,
Maine 04345; (207) 203–3025; email—
LewisC.Loon@kruger.com.
i. FERC Contact: Karen Sughrue at
(202) 502–8556; or email at
karen.sughrue@ferc.gov.
j. KEI (Maine) Power Management (III)
LLC (KEI Power) filed its request to use
the Traditional Licensing Process on
July 26, 2018. KEI Power provided
public notice of its request on July 25,
2018. In a letter dated September 10,
2018, the Director of the Division of
Hydropower Licensing approved KEI
Power’s request to use the Traditional
Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
E:\FR\FM\17SEN1.SGM
17SEN1
Agencies
[Federal Register Volume 83, Number 180 (Monday, September 17, 2018)]
[Notices]
[Page 46934]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-20104]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2520-000]
Great Lakes Hydro America, LLC; Notice of Authorization for
Continued Project Operation
On August 31, 2016, Great Lakes Hydro America, LLC, licensee for
the Mattaceunk Hydroelectric Project, filed an Application for a New
License pursuant to the Federal Power Act (FPA) and the Commission's
regulations thereunder. The Mattaceunk Hydroelectric Project is located
on the Penobscot River in Aroostook and Penobscot counties, Maine,
within the town of Medway, Woodville, Mattawamkeag, and the unorganized
township of Molunkus.
The license for Project No. 2520 was issued for a period ending
August 31, 2018. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2520 is issued to
the licensee for a period effective September 1, 2018 through August
31, 2019, or until the issuance of a new license for the project or
other disposition under the FPA, whichever comes first. If issuance of
a new license (or other disposition) does not take place on or before
August 30, 2019, notice is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under section 15(a)(1) of the FPA is
renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that the licensee, Great Lakes Hydro America, LLC, is
authorized to continue operation of the Mattaceunk Hydroelectric
Project, until such time as the Commission acts on its application for
a subsequent license.
Dated: September 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-20104 Filed 9-14-18; 8:45 am]
BILLING CODE 6717-01-P