Great Lakes Hydro America, LLC; Notice of Authorization for Continued Project Operation, 46934 [2018-20104]

Download as PDF 46934 Federal Register / Vol. 83, No. 180 / Monday, September 17, 2018 / Notices Declaratory Order seeking approval of the overall tariff rate structure and terms and conditions of service, including the proposed priority service prorationing methodology for an expansion of major segments of Medallion Pipeline Company, LLC.’s crude oil pipeline system, all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on October 10, 2018. Dated: September 11, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–20102 Filed 9–14–18; 8:45 am] daltland on DSKBBV9HB2PROD with NOTICES BILLING CODE 6717–01–P VerDate Sep<11>2014 17:47 Sep 14, 2018 Jkt 244001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2520–000] Great Lakes Hydro America, LLC; Notice of Authorization for Continued Project Operation On August 31, 2016, Great Lakes Hydro America, LLC, licensee for the Mattaceunk Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Mattaceunk Hydroelectric Project is located on the Penobscot River in Aroostook and Penobscot counties, Maine, within the town of Medway, Woodville, Mattawamkeag, and the unorganized township of Molunkus. The license for Project No. 2520 was issued for a period ending August 31, 2018. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2520 is issued to the licensee for a period effective September 1, 2018 through August 31, 2019, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before August 30, 2019, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the licensee, Great Lakes Hydro America, LLC, is authorized to continue operation of the Mattaceunk Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: September 11, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–20104 Filed 9–14–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3562–025] KEI (Maine) Power Management (III) LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 3562–025. c. Date Filed: July 26, 2018. d. Submitted By: KEI (Maine) Power Management (III) LLC. e. Name of Project: Barker Mill Upper Project. f. Location: On the Little Androscoggin River, in Androscoggin County, Maine. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Lewis C. Loon, KEI (USA) Power Management Inc., 423 Brunswick Avenue, Gardiner, Maine 04345; (207) 203–3025; email— LewisC.Loon@kruger.com. i. FERC Contact: Karen Sughrue at (202) 502–8556; or email at karen.sughrue@ferc.gov. j. KEI (Maine) Power Management (III) LLC (KEI Power) filed its request to use the Traditional Licensing Process on July 26, 2018. KEI Power provided public notice of its request on July 25, 2018. In a letter dated September 10, 2018, the Director of the Division of Hydropower Licensing approved KEI Power’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or NOAA E:\FR\FM\17SEN1.SGM 17SEN1

Agencies

[Federal Register Volume 83, Number 180 (Monday, September 17, 2018)]
[Notices]
[Page 46934]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-20104]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2520-000]


Great Lakes Hydro America, LLC; Notice of Authorization for 
Continued Project Operation

    On August 31, 2016, Great Lakes Hydro America, LLC, licensee for 
the Mattaceunk Hydroelectric Project, filed an Application for a New 
License pursuant to the Federal Power Act (FPA) and the Commission's 
regulations thereunder. The Mattaceunk Hydroelectric Project is located 
on the Penobscot River in Aroostook and Penobscot counties, Maine, 
within the town of Medway, Woodville, Mattawamkeag, and the unorganized 
township of Molunkus.
    The license for Project No. 2520 was issued for a period ending 
August 31, 2018. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), 
and as set forth at 18 CFR 16.21(a), if the licensee of such project 
has filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 2520 is issued to 
the licensee for a period effective September 1, 2018 through August 
31, 2019, or until the issuance of a new license for the project or 
other disposition under the FPA, whichever comes first. If issuance of 
a new license (or other disposition) does not take place on or before 
August 30, 2019, notice is hereby given that, pursuant to 18 CFR 
16.18(c), an annual license under section 15(a)(1) of the FPA is 
renewed automatically without further order or notice by the 
Commission, unless the Commission orders otherwise.
    If the project is not subject to section 15 of the FPA, notice is 
hereby given that the licensee, Great Lakes Hydro America, LLC, is 
authorized to continue operation of the Mattaceunk Hydroelectric 
Project, until such time as the Commission acts on its application for 
a subsequent license.

    Dated: September 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-20104 Filed 9-14-18; 8:45 am]
 BILLING CODE 6717-01-P