KEI (Maine) Power Management (III) LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 46934-46935 [2018-20079]
Download as PDF
46934
Federal Register / Vol. 83, No. 180 / Monday, September 17, 2018 / Notices
Declaratory Order seeking approval of
the overall tariff rate structure and terms
and conditions of service, including the
proposed priority service prorationing
methodology for an expansion of major
segments of Medallion Pipeline
Company, LLC.’s crude oil pipeline
system, all as more fully explained in
the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on October 10, 2018.
Dated: September 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–20102 Filed 9–14–18; 8:45 am]
daltland on DSKBBV9HB2PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:47 Sep 14, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2520–000]
Great Lakes Hydro America, LLC;
Notice of Authorization for Continued
Project Operation
On August 31, 2016, Great Lakes
Hydro America, LLC, licensee for the
Mattaceunk Hydroelectric Project, filed
an Application for a New License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Mattaceunk
Hydroelectric Project is located on the
Penobscot River in Aroostook and
Penobscot counties, Maine, within the
town of Medway, Woodville,
Mattawamkeag, and the unorganized
township of Molunkus.
The license for Project No. 2520 was
issued for a period ending August 31,
2018. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2520
is issued to the licensee for a period
effective September 1, 2018 through
August 31, 2019, or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before August 30, 2019,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the licensee, Great Lakes Hydro
America, LLC, is authorized to continue
operation of the Mattaceunk
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
Dated: September 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–20104 Filed 9–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3562–025]
KEI (Maine) Power Management (III)
LLC; Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 3562–025.
c. Date Filed: July 26, 2018.
d. Submitted By: KEI (Maine) Power
Management (III) LLC.
e. Name of Project: Barker Mill Upper
Project.
f. Location: On the Little
Androscoggin River, in Androscoggin
County, Maine. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Lewis
C. Loon, KEI (USA) Power Management
Inc., 423 Brunswick Avenue, Gardiner,
Maine 04345; (207) 203–3025; email—
LewisC.Loon@kruger.com.
i. FERC Contact: Karen Sughrue at
(202) 502–8556; or email at
karen.sughrue@ferc.gov.
j. KEI (Maine) Power Management (III)
LLC (KEI Power) filed its request to use
the Traditional Licensing Process on
July 26, 2018. KEI Power provided
public notice of its request on July 25,
2018. In a letter dated September 10,
2018, the Director of the Division of
Hydropower Licensing approved KEI
Power’s request to use the Traditional
Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
E:\FR\FM\17SEN1.SGM
17SEN1
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 83, No. 180 / Monday, September 17, 2018 / Notices
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
part 402; and NOAA Fisheries under
section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management
Act and implementing regulations at 50
CFR 600.920. We are also initiating
consultation with the Maine State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
KEI Power as the Commission’s nonfederal representative for carrying out
informal consultation pursuant to
section 7 of the Endangered Species Act
and section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act; and consultation
pursuant to section 106 of the National
Historic Preservation Act.
m. KEI Power filed a Pre-Application
Document (PAD; including a proposed
process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
subsequent license for Project No. 3562.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a subsequent
license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for this
project must be filed by July 31, 2021.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: September 10, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–20079 Filed 9–14–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:47 Sep 14, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP18–1146–000.
Applicants: Columbia Gulf
Transmission, LLC.
Description: Annual Cash-Out Report
of Colombia Gulf Transmission, LLC
under RP18–1146.
Filed Date: 8/31/18.
Accession Number: 20180831–5248.
Comments Due: 5 p.m. ET 9/14/18.
Docket Numbers: RP18–1147–000.
Applicants: Colorado Interstate Gas
Company, L.L.C.
Description: Operational Purchase
and Sales Report of Colorado Interstate
Gas Company L.L.C under RP18–1147.
Filed Date: 8/31/18.
Accession Number: 20180831–5248.
Comments Due: 5 p.m. ET 9/14/18.
Docket Numbers: RP18–1148–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2018–09–04 BP, CP, and Encana to
be effective 9/1/2018.
Filed Date: 9/5/18.
Accession Number: 20180905–5080.
Comments Due: 5 p.m. ET 9/17/18.
Docket Numbers: RP18–1151–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 090518
Negotiated Rates—Mieco Inc. R–7080–
02 to be effective 11/1/2018.
Filed Date: 9/5/18.
Accession Number: 20180905–5138.
Comments Due: 5 p.m. ET 9/17/18.
Docket Numbers: RP18–1152–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 090518
Negotiated Rates—Mieco Inc. R–7080–
03 to be effective 11/1/2018.
Filed Date: 9/5/18.
Accession Number: 20180905–5140.
Comments Due: 5 p.m. ET 9/17/18.
Docket Numbers: RP18–1153–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 090518
Negotiated Rates—Mieco Inc. R–7080–
04 to be effective 11/1/2018.
Filed Date: 9/5/18.
Accession Number: 20180905–5141.
Comments Due: 5 p.m. ET 9/17/18.
Docket Numbers: RP18–1154–000.
Applicants: Iroquois Gas
Transmission System, L.P.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
46935
Description: § 4(d) Rate Filing: 090518
Negotiated Rates—Mieco Inc. R–7080–
05 to be effective 11/1/2018.
Filed Date: 9/5/18.
Accession Number: 20180905–5143.
Comments Due: 5 p.m. ET 9/17/18.
Docket Numbers: RP18–1155–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 090518
Negotiated Rates—Mieco Inc. R–7080–
06 to be effective 11/1/2018.
Filed Date: 9/5/18.
Accession Number: 20180905–5144.
Comments Due: 5 p.m. ET 9/17/18.
Docket Numbers: RP18–1156–000.
Applicants: Black Marlin Pipeline
Company.
Description: Black Marlin Pipeline
Company submits tariff filing per
260.402: Black Marlin Pipeline
Company: Petition for Waiver from
Filing Form No. 501–G to be effective
N/A under RP18–1156.
Filed Date: 09/06/2018.
Accession Number: 20180906–5030.
Comment Date: 5:00 p.m. ET 9/18/18.
Docket Numbers: RP18–1157–000.
Applicants: Eastern Shore Natural Gas
Company.
Description: Eastern Shore Natural
Gas Company submits tariff filing per
260.402: Waiver to file FERC Form No.
501–G to be effective N/A under RP18–
1157.
Filed Date: 09/06/2018.
Accession Number: 20180906–5081.
Comment Date: 5:00 p.m. ET 9/18/18.
Docket Numbers: RP18–1158–000.
Applicants: CNE Gas Supply,
LLC,Exelon Generation Company, LLC.
Description: Petition for Temporary
Waivers of Capacity Regulations and
Policies, et al. of CNE Gas Supply, LLC,
et al. under RP18–1158.
Filed Date: 09/06/2018.
Accession Number: 20180906–5132.
Comment Date: 5:00 p.m. ET 9/18/18.
Docket Numbers: RP18–1159–000.
Applicants: Southern Natural Gas
Company, L.L.C.
Description: eTariff filing per 1430:
Request for Waiver of Form No. 501–G
to be effective N/A.
Filed Date: 9/7/18.
Accession Number: 20180907–5030.
Comments Due: 5 p.m. ET 9/19/18.
Docket Numbers: RP18–1160–000.
Applicants: Paiute Pipeline Company.
Description: Compliance filing
Compliance Filing—CP17–471 to be
effective 11/1/2018.
Filed Date: 9/10/18.
Accession Number: 20180910–5000.
Comments Due: 5 p.m. ET 9/24/18.
Docket Numbers: RP18–1161–000.
Applicants: Iroquois Gas
Transmission System, L.P.
E:\FR\FM\17SEN1.SGM
17SEN1
Agencies
[Federal Register Volume 83, Number 180 (Monday, September 17, 2018)]
[Notices]
[Pages 46934-46935]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-20079]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3562-025]
KEI (Maine) Power Management (III) LLC; Notice of Intent To File
License Application, Filing of Pre-Application Document, and Approving
Use of the Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 3562-025.
c. Date Filed: July 26, 2018.
d. Submitted By: KEI (Maine) Power Management (III) LLC.
e. Name of Project: Barker Mill Upper Project.
f. Location: On the Little Androscoggin River, in Androscoggin
County, Maine. No federal lands are occupied by the project works or
located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Lewis C. Loon, KEI (USA) Power
Management Inc., 423 Brunswick Avenue, Gardiner, Maine 04345; (207)
203-3025; [email protected]
i. FERC Contact: Karen Sughrue at (202) 502-8556; or email at
[email protected].
j. KEI (Maine) Power Management (III) LLC (KEI Power) filed its
request to use the Traditional Licensing Process on July 26, 2018. KEI
Power provided public notice of its request on July 25, 2018. In a
letter dated September 10, 2018, the Director of the Division of
Hydropower Licensing approved KEI Power's request to use the
Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA
[[Page 46935]]
Fisheries under section 7 of the Endangered Species Act and the joint
agency regulations thereunder at 50 CFR part 402; and NOAA Fisheries
under section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act and implementing regulations at 50 CFR 600.920. We are
also initiating consultation with the Maine State Historic Preservation
Officer, as required by section 106, National Historic Preservation
Act, and the implementing regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating KEI Power as the
Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act and
section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act; and consultation pursuant to section 106 of the
National Historic Preservation Act.
m. KEI Power filed a Pre-Application Document (PAD; including a
proposed process plan and schedule) with the Commission, pursuant to 18
CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a subsequent license for Project No. 3562. Pursuant to
18 CFR 16.8, 16.9, and 16.10 each application for a subsequent license
and any competing license applications must be filed with the
Commission at least 24 months prior to the expiration of the existing
license. All applications for license for this project must be filed by
July 31, 2021.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: September 10, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-20079 Filed 9-14-18; 8:45 am]
BILLING CODE 6717-01-P