KEI (Maine) Power Management (III) LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 46934-46935 [2018-20079]

Download as PDF 46934 Federal Register / Vol. 83, No. 180 / Monday, September 17, 2018 / Notices Declaratory Order seeking approval of the overall tariff rate structure and terms and conditions of service, including the proposed priority service prorationing methodology for an expansion of major segments of Medallion Pipeline Company, LLC.’s crude oil pipeline system, all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on October 10, 2018. Dated: September 11, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–20102 Filed 9–14–18; 8:45 am] daltland on DSKBBV9HB2PROD with NOTICES BILLING CODE 6717–01–P VerDate Sep<11>2014 17:47 Sep 14, 2018 Jkt 244001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2520–000] Great Lakes Hydro America, LLC; Notice of Authorization for Continued Project Operation On August 31, 2016, Great Lakes Hydro America, LLC, licensee for the Mattaceunk Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Mattaceunk Hydroelectric Project is located on the Penobscot River in Aroostook and Penobscot counties, Maine, within the town of Medway, Woodville, Mattawamkeag, and the unorganized township of Molunkus. The license for Project No. 2520 was issued for a period ending August 31, 2018. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2520 is issued to the licensee for a period effective September 1, 2018 through August 31, 2019, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before August 30, 2019, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the licensee, Great Lakes Hydro America, LLC, is authorized to continue operation of the Mattaceunk Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: September 11, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–20104 Filed 9–14–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3562–025] KEI (Maine) Power Management (III) LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 3562–025. c. Date Filed: July 26, 2018. d. Submitted By: KEI (Maine) Power Management (III) LLC. e. Name of Project: Barker Mill Upper Project. f. Location: On the Little Androscoggin River, in Androscoggin County, Maine. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Lewis C. Loon, KEI (USA) Power Management Inc., 423 Brunswick Avenue, Gardiner, Maine 04345; (207) 203–3025; email— LewisC.Loon@kruger.com. i. FERC Contact: Karen Sughrue at (202) 502–8556; or email at karen.sughrue@ferc.gov. j. KEI (Maine) Power Management (III) LLC (KEI Power) filed its request to use the Traditional Licensing Process on July 26, 2018. KEI Power provided public notice of its request on July 25, 2018. In a letter dated September 10, 2018, the Director of the Division of Hydropower Licensing approved KEI Power’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or NOAA E:\FR\FM\17SEN1.SGM 17SEN1 daltland on DSKBBV9HB2PROD with NOTICES Federal Register / Vol. 83, No. 180 / Monday, September 17, 2018 / Notices Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the Maine State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating KEI Power as the Commission’s nonfederal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 305(b) of the MagnusonStevens Fishery Conservation and Management Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. KEI Power filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a subsequent license for Project No. 3562. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a subsequent license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by July 31, 2021. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: September 10, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–20079 Filed 9–14–18; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:47 Sep 14, 2018 Jkt 244001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP18–1146–000. Applicants: Columbia Gulf Transmission, LLC. Description: Annual Cash-Out Report of Colombia Gulf Transmission, LLC under RP18–1146. Filed Date: 8/31/18. Accession Number: 20180831–5248. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: RP18–1147–000. Applicants: Colorado Interstate Gas Company, L.L.C. Description: Operational Purchase and Sales Report of Colorado Interstate Gas Company L.L.C under RP18–1147. Filed Date: 8/31/18. Accession Number: 20180831–5248. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: RP18–1148–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: Neg Rate 2018–09–04 BP, CP, and Encana to be effective 9/1/2018. Filed Date: 9/5/18. Accession Number: 20180905–5080. Comments Due: 5 p.m. ET 9/17/18. Docket Numbers: RP18–1151–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 090518 Negotiated Rates—Mieco Inc. R–7080– 02 to be effective 11/1/2018. Filed Date: 9/5/18. Accession Number: 20180905–5138. Comments Due: 5 p.m. ET 9/17/18. Docket Numbers: RP18–1152–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 090518 Negotiated Rates—Mieco Inc. R–7080– 03 to be effective 11/1/2018. Filed Date: 9/5/18. Accession Number: 20180905–5140. Comments Due: 5 p.m. ET 9/17/18. Docket Numbers: RP18–1153–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 090518 Negotiated Rates—Mieco Inc. R–7080– 04 to be effective 11/1/2018. Filed Date: 9/5/18. Accession Number: 20180905–5141. Comments Due: 5 p.m. ET 9/17/18. Docket Numbers: RP18–1154–000. Applicants: Iroquois Gas Transmission System, L.P. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 46935 Description: § 4(d) Rate Filing: 090518 Negotiated Rates—Mieco Inc. R–7080– 05 to be effective 11/1/2018. Filed Date: 9/5/18. Accession Number: 20180905–5143. Comments Due: 5 p.m. ET 9/17/18. Docket Numbers: RP18–1155–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 090518 Negotiated Rates—Mieco Inc. R–7080– 06 to be effective 11/1/2018. Filed Date: 9/5/18. Accession Number: 20180905–5144. Comments Due: 5 p.m. ET 9/17/18. Docket Numbers: RP18–1156–000. Applicants: Black Marlin Pipeline Company. Description: Black Marlin Pipeline Company submits tariff filing per 260.402: Black Marlin Pipeline Company: Petition for Waiver from Filing Form No. 501–G to be effective N/A under RP18–1156. Filed Date: 09/06/2018. Accession Number: 20180906–5030. Comment Date: 5:00 p.m. ET 9/18/18. Docket Numbers: RP18–1157–000. Applicants: Eastern Shore Natural Gas Company. Description: Eastern Shore Natural Gas Company submits tariff filing per 260.402: Waiver to file FERC Form No. 501–G to be effective N/A under RP18– 1157. Filed Date: 09/06/2018. Accession Number: 20180906–5081. Comment Date: 5:00 p.m. ET 9/18/18. Docket Numbers: RP18–1158–000. Applicants: CNE Gas Supply, LLC,Exelon Generation Company, LLC. Description: Petition for Temporary Waivers of Capacity Regulations and Policies, et al. of CNE Gas Supply, LLC, et al. under RP18–1158. Filed Date: 09/06/2018. Accession Number: 20180906–5132. Comment Date: 5:00 p.m. ET 9/18/18. Docket Numbers: RP18–1159–000. Applicants: Southern Natural Gas Company, L.L.C. Description: eTariff filing per 1430: Request for Waiver of Form No. 501–G to be effective N/A. Filed Date: 9/7/18. Accession Number: 20180907–5030. Comments Due: 5 p.m. ET 9/19/18. Docket Numbers: RP18–1160–000. Applicants: Paiute Pipeline Company. Description: Compliance filing Compliance Filing—CP17–471 to be effective 11/1/2018. Filed Date: 9/10/18. Accession Number: 20180910–5000. Comments Due: 5 p.m. ET 9/24/18. Docket Numbers: RP18–1161–000. Applicants: Iroquois Gas Transmission System, L.P. E:\FR\FM\17SEN1.SGM 17SEN1

Agencies

[Federal Register Volume 83, Number 180 (Monday, September 17, 2018)]
[Notices]
[Pages 46934-46935]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-20079]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3562-025]


KEI (Maine) Power Management (III) LLC; Notice of Intent To File 
License Application, Filing of Pre-Application Document, and Approving 
Use of the Traditional Licensing Process

    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing Process.
    b. Project No.: 3562-025.
    c. Date Filed: July 26, 2018.
    d. Submitted By: KEI (Maine) Power Management (III) LLC.
    e. Name of Project: Barker Mill Upper Project.
    f. Location: On the Little Androscoggin River, in Androscoggin 
County, Maine. No federal lands are occupied by the project works or 
located within the project boundary.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Potential Applicant Contact: Lewis C. Loon, KEI (USA) Power 
Management Inc., 423 Brunswick Avenue, Gardiner, Maine 04345; (207) 
203-3025; [email protected]
    i. FERC Contact: Karen Sughrue at (202) 502-8556; or email at 
[email protected].
    j. KEI (Maine) Power Management (III) LLC (KEI Power) filed its 
request to use the Traditional Licensing Process on July 26, 2018. KEI 
Power provided public notice of its request on July 25, 2018. In a 
letter dated September 10, 2018, the Director of the Division of 
Hydropower Licensing approved KEI Power's request to use the 
Traditional Licensing Process.
    k. With this notice, we are initiating informal consultation with 
the U.S. Fish and Wildlife Service and/or NOAA

[[Page 46935]]

Fisheries under section 7 of the Endangered Species Act and the joint 
agency regulations thereunder at 50 CFR part 402; and NOAA Fisheries 
under section 305(b) of the Magnuson-Stevens Fishery Conservation and 
Management Act and implementing regulations at 50 CFR 600.920. We are 
also initiating consultation with the Maine State Historic Preservation 
Officer, as required by section 106, National Historic Preservation 
Act, and the implementing regulations of the Advisory Council on 
Historic Preservation at 36 CFR 800.2.
    l. With this notice, we are designating KEI Power as the 
Commission's non-federal representative for carrying out informal 
consultation pursuant to section 7 of the Endangered Species Act and 
section 305(b) of the Magnuson-Stevens Fishery Conservation and 
Management Act; and consultation pursuant to section 106 of the 
National Historic Preservation Act.
    m. KEI Power filed a Pre-Application Document (PAD; including a 
proposed process plan and schedule) with the Commission, pursuant to 18 
CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's website 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    o. The licensee states its unequivocal intent to submit an 
application for a subsequent license for Project No. 3562. Pursuant to 
18 CFR 16.8, 16.9, and 16.10 each application for a subsequent license 
and any competing license applications must be filed with the 
Commission at least 24 months prior to the expiration of the existing 
license. All applications for license for this project must be filed by 
July 31, 2021.
    p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: September 10, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-20079 Filed 9-14-18; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.