Peterson Machinery Sales; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 46156-46157 [2018-19812]
Download as PDF
46156
Federal Register / Vol. 83, No. 177 / Wednesday, September 12, 2018 / Notices
The EA Process
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• land use;
• water resources, fisheries, and
wetlands;
• cultural resources;
• vegetation and wildlife;
• air quality and noise;
• endangered and threatened species;
• public safety; and
• cumulative impacts.
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project, and
make recommendations on how to
lessen or avoid impacts on the various
resource areas.
The EA will present Commission
staffs’ independent analysis of the
issues. The EA will be available in the
public record through eLibrary.2
Commission staff will consider and
address all comments on the EA before
making recommendations to the
Commission. To ensure Commission
staff have the opportunity to address
your comments, please carefully follow
the instructions in the Public
Participation section, beginning on page
2.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the EA.3 Agencies that would like to
request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Consultation Under Section 106 of the
National Historic Preservation Act
daltland on DSKBBV9HB2PROD with NOTICES
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is are
using this notice to initiate consultation
with the applicable State Historic
Preservation Office (SHPO), and to
solicit their views and those of other
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.4
2 For instructions on connecting to eLibrary, refer
to the last page of this notice.
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
VerDate Sep<11>2014
18:41 Sep 11, 2018
Jkt 244001
Commission staff will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). The EA for this
project will document findings on the
impacts on historic properties and
summarize the status of consultations
under section 106.
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public sessions or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials; Native
American Tribes; and local libraries and
newspapers. This list also includes all
affected landowners (as defined in the
Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. Commission
staff will update the environmental
mailing list as the analysis proceeds to
ensure that information related to this
environmental review is sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
As stated above, the EA will be
available in the public record through
the Commission’s eLibrary, under the
Docket Number CP18–533–000.
Dated: September 6, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number in the ‘‘Docket
Number’’ field, excluding the last three
digits (i.e., CP18–533). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
[FR Doc. 2018–19806 Filed 9–11–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14872–000]
Peterson Machinery Sales; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 19, 2018, Peterson
Machinery Sales filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Hubbardston Hydroelectric Project
(project) to be located on the Fish Creek,
near Hubbardston, in Ionia County,
Michigan. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would be
located at the site of an existing, nonoperational hydroelectric project
previously operated by Hope Renewable
Energy, LLC without a Commission
license. The proposed run-of-river
project will involve rehabilitation and
upgrade of the following existing
facilities: (1) A 60-acre, 600-acre-foot
reservoir with normal surface elevation
of 850 feet mean sea level; (2) a 350foot-long, 25 to 30-foot-high
combination dam and spillway
incorporating a 80-foot-long, 12-footwide intake channel; (3) a 30-foot-long,
20-foot-wide, 25-foot-high powerhouse
containing two Francis turbines and
E:\FR\FM\12SEN1.SGM
12SEN1
Federal Register / Vol. 83, No. 177 / Wednesday, September 12, 2018 / Notices
daltland on DSKBBV9HB2PROD with NOTICES
associated generators with a combined
installed capacity of 400 kilowatts; (4) a
600-foot-long tailrace; and (5)
appurtenant facilities. The estimated
average annual generation of the project
would be 3,500 megawatt-hours that
would be conveyed from the
powerhouse to the grid via a
transmission line owned by Consumers
Energy.
Applicant Contact: Charles R.
Peterson, 804 Gila Bend Highway, Casa
Grande, Arizona 85122, phone (231)
649–8706.
FERC Contact: Sergiu Serban, (202)
502–6211.
Deadline for filing comments,
applications (without notices of intent),
or notices of intent to file competing
applications: 60 days from the issuance
of this notice. Competing applications
and notices of intent must meet the
requirements of 18 CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14872–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibary.asp.
Enter the docket number (P–14872) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: September 6, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19812 Filed 9–11–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:41 Sep 11, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[EG18–95–000, EG18–96–000, EG18–97–
000, EG18–98–000, EG18–99–000, EG18–
100–000, EG18–101–000, EG18–102–000,
FC18–6–000, FC18–7–000]
Langdon Renewables, LLC, Rush
Springs Energy Storage, LLC, Origis
Energy, Palmer’s Creek Wind Farm,
LLC, Meadowlark Wind I LLC, Foard
City Wind, LLC, Torrecillas Wind
Energy, LLC, Holloman Lessee LLC,
Solfuture Gestion, S.L.U., Glicinia
Instalaciones Fotovoltaicas, S.L.U.;
Notice of Effectiveness of Exempt
Wholesale Generator and Foreign
Utility Company Status
Take notice that during the month of
August 2018, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a)(2018).
Dated: September 6, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19808 Filed 9–11–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–151–000.
Applicants: Breckinridge Wind
Project, LLC, Carousel Wind Farm, LLC,
Cottonwood Wind Project, LLC, Golden
Hills North Wind, LLC, Golden Hills
Interconnection, LLC, Kingman Wind
Energy I, LLC, Kingman Wind Energy II,
LLC, Mountain View Solar, LLC,
NextEra Energy Bluff Point, LLC,
Ninnescah Wind Energy, LLC, Rush
Springs Wind Energy, LLC, NEP US
SellCo, LLC, NEP Renewables Holdings,
LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Breckinridge Wind
Project, LLC, et al.
Filed Date: 9/5/18.
Accession Number: 20180905–5102.
Comments Due: 5 p.m. ET 9/26/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–2379–000.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
46157
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: 3rd
Rev ISA SA No. 3837; 2nd Rev CSA SA
No. 3838; Queue #X4–048/Y2–089/
AA1–077 to be effective 8/6/2018.
Filed Date: 9/5/18.
Accession Number: 20180905–5101.
Comments Due: 5 p.m. ET 9/26/18.
Docket Numbers: ER18–2380–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2018–09–05 Dispatch Operating Target
Clarification Amendment to be effective
11/6/2018.
Filed Date: 9/6/18.
Accession Number: 20180906–5000.
Comments Due: 5 p.m. ET 9/27/18.
Docket Numbers: ER18–2381–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Annual Calculation of
the Cost of New Entry value (‘‘CONE’’)
for each Local Resource Zone (‘‘LRZ’’)
in the MISO Region of Midcontinent
Independent System Operator, Inc.
Filed Date: 9/5/18.
Accession Number: 20180905–5136.
Comments Due: 5 p.m. ET 9/26/18.
Docket Numbers: ER18–2382–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Attachment AP to Remove
References to SPP as Regional Entity to
be effective 9/1/2018.
Filed Date: 9/5/18.
Accession Number: 20180905–5137.
Comments Due: 5 p.m. ET 9/26/18.
Docket Numbers: ER18–2383–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Bylaws and Membership Agreement
Revisions to Remove References to SPP
RE to be effective 9/1/2018.
Filed Date: 9/5/18.
Accession Number: 20180905–5147.
Comments Due: 5 p.m. ET 9/26/18.
Docket Numbers: ER18–2384–000.
Applicants: Ameren Illinois
Company.
Description: Notice of Cancellation of
Rate Schedule No. 43 of Ameren Illinois
Company.
Filed Date: 9/5/18.
Accession Number: 20180905–5148.
Comments Due: 5 p.m. ET 9/26/18.
Docket Numbers: ER18–2385–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
607R33 Westar Energy, Inc. NITSA NOA
to be effective 9/27/2018.
Filed Date: 9/6/18.
Accession Number: 20180906–5059.
E:\FR\FM\12SEN1.SGM
12SEN1
Agencies
[Federal Register Volume 83, Number 177 (Wednesday, September 12, 2018)]
[Notices]
[Pages 46156-46157]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19812]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14872-000]
Peterson Machinery Sales; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 19, 2018, Peterson Machinery Sales filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act, proposing to study the feasibility of the Hubbardston
Hydroelectric Project (project) to be located on the Fish Creek, near
Hubbardston, in Ionia County, Michigan. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would be located at the site of an existing,
non-operational hydroelectric project previously operated by Hope
Renewable Energy, LLC without a Commission license. The proposed run-
of-river project will involve rehabilitation and upgrade of the
following existing facilities: (1) A 60-acre, 600-acre-foot reservoir
with normal surface elevation of 850 feet mean sea level; (2) a 350-
foot-long, 25 to 30-foot-high combination dam and spillway
incorporating a 80-foot-long, 12-foot-wide intake channel; (3) a 30-
foot-long, 20-foot-wide, 25-foot-high powerhouse containing two Francis
turbines and
[[Page 46157]]
associated generators with a combined installed capacity of 400
kilowatts; (4) a 600-foot-long tailrace; and (5) appurtenant
facilities. The estimated average annual generation of the project
would be 3,500 megawatt-hours that would be conveyed from the
powerhouse to the grid via a transmission line owned by Consumers
Energy.
Applicant Contact: Charles R. Peterson, 804 Gila Bend Highway, Casa
Grande, Arizona 85122, phone (231) 649-8706.
FERC Contact: Sergiu Serban, (202) 502-6211.
Deadline for filing comments, applications (without notices of
intent), or notices of intent to file competing applications: 60 days
from the issuance of this notice. Competing applications and notices of
intent must meet the requirements of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14872-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at https://www.ferc.gov/docs-filing/elibary.asp.
Enter the docket number (P-14872) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 6, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-19812 Filed 9-11-18; 8:45 am]
BILLING CODE 6717-01-P