Nevada Irrigation District; Notice of Teleconference, 45623-45624 [2018-19551]
Download as PDF
Federal Register / Vol. 83, No. 175 / Monday, September 10, 2018 / Notices
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 4, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–19552 Filed 9–7–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 619–164]
daltland on DSKBBV9HB2PROD with NOTICES
Notice of Environmental Site Review:
Pacific Gas and Electric Company and
the City of Santa Clara
On Tuesday, October 16, 2018, the
Federal Energy Regulatory Commission
(FERC) staff and the Pacific Gas and
Electric Company and the City of Santa
Clara (licensees) will conduct an
environmental site review of the Bucks
Creek Hydropower Project. The project
is located on Bucks, Grizzly, and Milk
Ranch Creeks in Plumas County,
California.
The site review is open to the public,
Indian Tribes, and resource agencies
and will occur from 9:00 a.m. to about
4:00 p.m. (Pacific Daylight Time). The
site review will leave from the Bucks
Lakeshore Resort [16001 Bucks Lake
Road, Quincy, California 95971, (530)
283–2848].
To better support the safety of the
group, and to the extent practicable,
participants will be requested to carpool
in vehicles provided by the licensees.
Participants are asked not to attempt to
join the site review after it departs the
initial meeting location. Participants
must wear appropriate footwear (i.e., no
sandals or open-toed shoes) and should
bring sun protection, water, and lunch.
Some brief hiking over unimproved dirt
trails may be necessary to access some
sites.
To appropriately accommodate
persons interested in attending the site
review, participants must contact Alan
Mitchnick, FERC Project Coordinator, at
(202) 502–6074 or alan.mitchnick@
ferc.gov, no later than Tuesday, October
9, 2018.
Dated: September 4, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–19560 Filed 9–7–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:54 Sep 07, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14871–001]
New England Hydropower Company,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On August 2, 2018, New England
Hydropower Company, LLC, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of hydropower at Lock 47 on
the Lehigh Canal in the city of Easton,
Northampton County, Pennsylvania.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Lehigh Canal Hugh
Moore Park East Hydroelectric Project
would consist of the following: (1) An
existing 20-foot-high concrete gravity
dam (i.e., the Chain Dam on the Lehigh
River); (2) an existing impoundment
with a storage capacity of 1,197 acre-feet
at a normal maximum surface elevation
of 192 feet mean sea level; (3) an
existing 50-foot-wide, 2.5-mile-long
canal that stretches from above the
Chain Dam where water enters the canal
to where it reconnects with the Lehigh
River downstream, approximately one
half of a mile above the Easton Dam; (4)
a new 20-foot-wide, 40-foot-long intake
channel parallel to Lock 47; (5) a new
16-foot by 32-foot powerhouse
containing two Archimedes Screw
turbine-generator units with a total
capacity of 485 kilowatts; (6) a new 20foot-wide, 40-foot-long tailrace channel;
(7) a new 460-kilovolt, 210-foot-long
transmission line connecting the
powerhouse to a nearby grid
interconnection point; and (8)
appurtenant facilities. The proposed
project would have an average annual
generation of 3,398 megawatt-hours.
Applicant Contact: Ms. Carol
Wasserman, Principal, New England
Hydropower Company, LLC, 100
Cummings Center Drive, Suite 451C,
Beverly, MA 01915; phone: (339) 293–
3157.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
45623
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14871–001.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14871) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: September 4, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–19553 Filed 9–7–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2266–102]
Nevada Irrigation District; Notice of
Teleconference
a. Project Name and Number: YubaBear Hydroelectric Project No. 2266.
b. Applicant: Nevada Irrigation
District.
c. Date and Time of Teleconference:
September 25, 2018, 10:00 a.m. Pacific
Daylight Time (1:00 p.m. Eastern
Daylight Time).
d. FERC Contact: Alan Mitchnick at
(202) 502–6074, alan.mitchnick@
ferc.gov.
e. Purpose of Meeting: The Federal
Energy Regulatory Commission staff
will participate in a meeting with the
U.S. Fish and Wildlife Service and the
Nevada Irrigation District to discuss
E:\FR\FM\10SEN1.SGM
10SEN1
45624
Federal Register / Vol. 83, No. 175 / Monday, September 10, 2018 / Notices
Filed Date: 8/31/18.
Accession Number: 20180831–5219.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER10–2527–006;
ER18–1652–001; ER10–2528–002;
ER10–2960–008; ER10–2400–009;
ER10–2529–002; ER10–2530–003;
ER10–2531–007; ER15–356–009; ER15–
357–009; ER10–2532–012; ER10–1595–
010; ER17–1636–004; ER10–1821–017;
ER10–2533–006; ER10–2534–003;
ER10–1598–010; ER10–2535–007;
ER10–1616–010; ER11–4475–010;
ER10–1618–010; ER18–1821–002.
Applicants: Allegheny Ridge Wind
Farm, LLC, AL Mesquite Marketing,
LLC, Aragonne Wind LLC, Astoria
Generating Company, L.P., Blue Canyon
Dated: September 4, 2018.
Windpower LLC, Buena Vista Energy,
Kimberly D. Bose,
LLC, Caprock Wind LLC, Cedar Creek
Secretary.
Wind Energy, LLC, Chief Conemaugh
[FR Doc. 2018–19551 Filed 9–7–18; 8:45 am]
Power, LLC, Chief Keystone Power,
BILLING CODE 6717–01–P
LLC, Crescent Ridge LLC, Crete Energy
Venture, LLC, Great River Hydro, LLC,
Goshen Phase II LLC, GSG, LLC,
DEPARTMENT OF ENERGY
Kumeyaay Wind LLC, Lincoln
Generating Facility, LLC, Mendota Hills,
Federal Energy Regulatory
LLC, New Covert Generating Company,
Commission
LLC, Rockland Wind Farm LLC, Rolling
Hills Generating, L.L.C., Walleye Power,
Combined Notice of Filings #1
LLC.
Take notice that the Commission
Description: Notice of Non-Material
received the following electric corporate Change in Status of Allegheny Ridge
filings:
Wind Farm, LLC, et. al.
Filed Date: 8/31/18.
Docket Numbers: EC18–149–000.
Accession Number: 20180831–5136.
Applicants: Florida Power & Light
Comments Due: 5 p.m. ET 9/21/18.
Company.
Docket Numbers: ER12–1316–004;
Description: Application for
ER11–2753–005.
Authorization under Section 203 of the
Applicants: Silver State Solar Power
Federal Power Act, et al. of Florida
North, LLC, Cedar Point Wind, LLC.
Power & Light Company.
Description: Notification of NonFiled Date: 8/31/18.
Material Change in Status of Silver State
Accession Number: 20180831–5245.
Solar Power North, LLC, et al.
Comments Due: 5 p.m. ET 9/21/18.
Filed Date: 8/31/18.
Take notice that the Commission
Accession Number: 20180831–5217.
received the following electric rate
Comments Due: 5 p.m. ET 9/21/18.
filings:
Docket Numbers: ER17–1553–000.
Docket Numbers: ER10–2042–029;
Applicants: Duke Energy Progress,
ER10–1942–021; ER17–696–009; ER10– LLC.
1938–024; ER10–1934–023; ER10–1893–
Description: Report Filing: DEP
023; ER10–3051–028; ER10–2985–027;
Fayetteville RS No. 184 Refund Report
ER10–3049–028; ER11–4369–008;
to be effective N/A.
ER16–2218–008; ER10–1862–023.
Filed Date: 8/31/18.
Applicants: Calpine Energy Services,
Accession Number: 20180831–5170.
L.P., Calpine Construction Finance
Comments Due: 5 p.m. ET 9/21/18.
Company, L.P., Calpine Energy
Docket Numbers: ER18–563–004.
Solutions, LLC, Calpine Power
Applicants: Red Pine Wind Project,
America—CA, LLC, CES Marketing IX,
LLC.
LLC, CES Marketing X, LLC, Champion
Description: Compliance filing: Red
Energy, LLC, Champion Energy
Pine Rate Schedule Compliance Filing
Marketing LLC, Champion Energy
Effective March 1 2018 to be effective
Services, LLC, North American Power
3/1/2018.
and Gas, LLC, North American Power
Filed Date: 8/31/18.
Accession Number: 20180831–5193.
Business, LLC, Power Contract
Comments Due: 5 p.m. ET 9/21/18.
Financing, L.L.C.
Description: Notification of Change in
Docket Numbers: ER18–1169–003.
Applicants: California Independent
Status of the Indicated Calpine MBR
System Operator Corporation.
Sellers.
daltland on DSKBBV9HB2PROD with NOTICES
conservation measures needed to
protect species listed under the
Endangered Species Act that may be
affected by continued operation of the
existing Yuba-Bear Hydroelectric
Project. The primary species to be
discussed include the California redlegged frog and Sierra Nevada yellowlegged frog.
f. All local, state, and federal agencies,
Indian tribes, and other interested
parties are invited to attend by phone.
Please call Alan Mitchnick at (202) 502–
6074, or email alan.mitchnick@ferc.gov
by September 18, 2018, to RSVP and to
receive specific instructions on how to
participate.
VerDate Sep<11>2014
17:54 Sep 07, 2018
Jkt 244001
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Description: Compliance filing: 2018–
08–31 Limited Tariff Waiver PetitionPostpone Effect. Date to April 1 2019 to
be effective N/A.
Filed Date: 8/31/18.
Accession Number: 20180831–5174.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2312–000.
Applicants: Enel Green Power
Diamond Vista Wind Project, LLC.
Description: Report Filing: MBR Tariff
to be effective N/A.
Filed Date: 8/31/18.
Accession Number: 20180831–5092.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2370–000.
Applicants: Lackawanna Energy
Center LLC.
Description: Initial rate filing: Filing
of Reactive Power Rate Schedule to be
effective 10/1/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5191.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2371–000.
Applicants: New England Power Pool
Participants Committee.
Description: § 205(d) Rate Filing:
September 2018 Membership Filing to
be effective 9/1/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5194.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2372–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: FPL
and Seminole NITSA 162 Revisions to
be effective 9/1/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5195.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2373–000.
Applicants: Duke Energy Progress,
LLC.
Description: § 205(d) Rate Filing:
DEP–DOM IA RS. No. 196 Concurrence
Filing (Battleboro) to be effective
10/26/2018.
Filed Date: 9/4/18.
Accession Number: 20180904–5074.
Comments Due: 5 p.m. ET 9/25/18.
Docket Numbers: ER18–2374–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
Hope PSA to be effective 8/1/2018.
Filed Date: 9/4/18.
Accession Number: 20180904–5080.
Comments Due: 5 p.m. ET 9/25/18.
Docket Numbers: ER18–2375–000.
Applicants: Tampa Electric Company
Description: § 205(d) Rate Filing:
Underfrequency Load Shedding Update
to be effective 9/5/2018.
Filed Date: 9/4/18.
Accession Number: 20180904–5135.
E:\FR\FM\10SEN1.SGM
10SEN1
Agencies
[Federal Register Volume 83, Number 175 (Monday, September 10, 2018)]
[Notices]
[Pages 45623-45624]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19551]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2266-102]
Nevada Irrigation District; Notice of Teleconference
a. Project Name and Number: Yuba-Bear Hydroelectric Project No.
2266.
b. Applicant: Nevada Irrigation District.
c. Date and Time of Teleconference: September 25, 2018, 10:00 a.m.
Pacific Daylight Time (1:00 p.m. Eastern Daylight Time).
d. FERC Contact: Alan Mitchnick at (202) 502-6074,
[email protected].
e. Purpose of Meeting: The Federal Energy Regulatory Commission
staff will participate in a meeting with the U.S. Fish and Wildlife
Service and the Nevada Irrigation District to discuss
[[Page 45624]]
conservation measures needed to protect species listed under the
Endangered Species Act that may be affected by continued operation of
the existing Yuba-Bear Hydroelectric Project. The primary species to be
discussed include the California red-legged frog and Sierra Nevada
yellow-legged frog.
f. All local, state, and federal agencies, Indian tribes, and other
interested parties are invited to attend by phone. Please call Alan
Mitchnick at (202) 502-6074, or email [email protected] by
September 18, 2018, to RSVP and to receive specific instructions on how
to participate.
Dated: September 4, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-19551 Filed 9-7-18; 8:45 am]
BILLING CODE 6717-01-P