Nevada Irrigation District; Notice of Teleconference, 45623-45624 [2018-19551]

Download as PDF Federal Register / Vol. 83, No. 175 / Monday, September 10, 2018 / Notices eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 4, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–19552 Filed 9–7–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 619–164] daltland on DSKBBV9HB2PROD with NOTICES Notice of Environmental Site Review: Pacific Gas and Electric Company and the City of Santa Clara On Tuesday, October 16, 2018, the Federal Energy Regulatory Commission (FERC) staff and the Pacific Gas and Electric Company and the City of Santa Clara (licensees) will conduct an environmental site review of the Bucks Creek Hydropower Project. The project is located on Bucks, Grizzly, and Milk Ranch Creeks in Plumas County, California. The site review is open to the public, Indian Tribes, and resource agencies and will occur from 9:00 a.m. to about 4:00 p.m. (Pacific Daylight Time). The site review will leave from the Bucks Lakeshore Resort [16001 Bucks Lake Road, Quincy, California 95971, (530) 283–2848]. To better support the safety of the group, and to the extent practicable, participants will be requested to carpool in vehicles provided by the licensees. Participants are asked not to attempt to join the site review after it departs the initial meeting location. Participants must wear appropriate footwear (i.e., no sandals or open-toed shoes) and should bring sun protection, water, and lunch. Some brief hiking over unimproved dirt trails may be necessary to access some sites. To appropriately accommodate persons interested in attending the site review, participants must contact Alan Mitchnick, FERC Project Coordinator, at (202) 502–6074 or alan.mitchnick@ ferc.gov, no later than Tuesday, October 9, 2018. Dated: September 4, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–19560 Filed 9–7–18; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:54 Sep 07, 2018 Jkt 244001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14871–001] New England Hydropower Company, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 2, 2018, New England Hydropower Company, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of hydropower at Lock 47 on the Lehigh Canal in the city of Easton, Northampton County, Pennsylvania. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Lehigh Canal Hugh Moore Park East Hydroelectric Project would consist of the following: (1) An existing 20-foot-high concrete gravity dam (i.e., the Chain Dam on the Lehigh River); (2) an existing impoundment with a storage capacity of 1,197 acre-feet at a normal maximum surface elevation of 192 feet mean sea level; (3) an existing 50-foot-wide, 2.5-mile-long canal that stretches from above the Chain Dam where water enters the canal to where it reconnects with the Lehigh River downstream, approximately one half of a mile above the Easton Dam; (4) a new 20-foot-wide, 40-foot-long intake channel parallel to Lock 47; (5) a new 16-foot by 32-foot powerhouse containing two Archimedes Screw turbine-generator units with a total capacity of 485 kilowatts; (6) a new 20foot-wide, 40-foot-long tailrace channel; (7) a new 460-kilovolt, 210-foot-long transmission line connecting the powerhouse to a nearby grid interconnection point; and (8) appurtenant facilities. The proposed project would have an average annual generation of 3,398 megawatt-hours. Applicant Contact: Ms. Carol Wasserman, Principal, New England Hydropower Company, LLC, 100 Cummings Center Drive, Suite 451C, Beverly, MA 01915; phone: (339) 293– 3157. FERC Contact: Monir Chowdhury; phone: (202) 502–6736. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 45623 intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14871–001. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14871) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: September 4, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–19553 Filed 9–7–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2266–102] Nevada Irrigation District; Notice of Teleconference a. Project Name and Number: YubaBear Hydroelectric Project No. 2266. b. Applicant: Nevada Irrigation District. c. Date and Time of Teleconference: September 25, 2018, 10:00 a.m. Pacific Daylight Time (1:00 p.m. Eastern Daylight Time). d. FERC Contact: Alan Mitchnick at (202) 502–6074, alan.mitchnick@ ferc.gov. e. Purpose of Meeting: The Federal Energy Regulatory Commission staff will participate in a meeting with the U.S. Fish and Wildlife Service and the Nevada Irrigation District to discuss E:\FR\FM\10SEN1.SGM 10SEN1 45624 Federal Register / Vol. 83, No. 175 / Monday, September 10, 2018 / Notices Filed Date: 8/31/18. Accession Number: 20180831–5219. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER10–2527–006; ER18–1652–001; ER10–2528–002; ER10–2960–008; ER10–2400–009; ER10–2529–002; ER10–2530–003; ER10–2531–007; ER15–356–009; ER15– 357–009; ER10–2532–012; ER10–1595– 010; ER17–1636–004; ER10–1821–017; ER10–2533–006; ER10–2534–003; ER10–1598–010; ER10–2535–007; ER10–1616–010; ER11–4475–010; ER10–1618–010; ER18–1821–002. Applicants: Allegheny Ridge Wind Farm, LLC, AL Mesquite Marketing, LLC, Aragonne Wind LLC, Astoria Generating Company, L.P., Blue Canyon Dated: September 4, 2018. Windpower LLC, Buena Vista Energy, Kimberly D. Bose, LLC, Caprock Wind LLC, Cedar Creek Secretary. Wind Energy, LLC, Chief Conemaugh [FR Doc. 2018–19551 Filed 9–7–18; 8:45 am] Power, LLC, Chief Keystone Power, BILLING CODE 6717–01–P LLC, Crescent Ridge LLC, Crete Energy Venture, LLC, Great River Hydro, LLC, Goshen Phase II LLC, GSG, LLC, DEPARTMENT OF ENERGY Kumeyaay Wind LLC, Lincoln Generating Facility, LLC, Mendota Hills, Federal Energy Regulatory LLC, New Covert Generating Company, Commission LLC, Rockland Wind Farm LLC, Rolling Hills Generating, L.L.C., Walleye Power, Combined Notice of Filings #1 LLC. Take notice that the Commission Description: Notice of Non-Material received the following electric corporate Change in Status of Allegheny Ridge filings: Wind Farm, LLC, et. al. Filed Date: 8/31/18. Docket Numbers: EC18–149–000. Accession Number: 20180831–5136. Applicants: Florida Power & Light Comments Due: 5 p.m. ET 9/21/18. Company. Docket Numbers: ER12–1316–004; Description: Application for ER11–2753–005. Authorization under Section 203 of the Applicants: Silver State Solar Power Federal Power Act, et al. of Florida North, LLC, Cedar Point Wind, LLC. Power & Light Company. Description: Notification of NonFiled Date: 8/31/18. Material Change in Status of Silver State Accession Number: 20180831–5245. Solar Power North, LLC, et al. Comments Due: 5 p.m. ET 9/21/18. Filed Date: 8/31/18. Take notice that the Commission Accession Number: 20180831–5217. received the following electric rate Comments Due: 5 p.m. ET 9/21/18. filings: Docket Numbers: ER17–1553–000. Docket Numbers: ER10–2042–029; Applicants: Duke Energy Progress, ER10–1942–021; ER17–696–009; ER10– LLC. 1938–024; ER10–1934–023; ER10–1893– Description: Report Filing: DEP 023; ER10–3051–028; ER10–2985–027; Fayetteville RS No. 184 Refund Report ER10–3049–028; ER11–4369–008; to be effective N/A. ER16–2218–008; ER10–1862–023. Filed Date: 8/31/18. Applicants: Calpine Energy Services, Accession Number: 20180831–5170. L.P., Calpine Construction Finance Comments Due: 5 p.m. ET 9/21/18. Company, L.P., Calpine Energy Docket Numbers: ER18–563–004. Solutions, LLC, Calpine Power Applicants: Red Pine Wind Project, America—CA, LLC, CES Marketing IX, LLC. LLC, CES Marketing X, LLC, Champion Description: Compliance filing: Red Energy, LLC, Champion Energy Pine Rate Schedule Compliance Filing Marketing LLC, Champion Energy Effective March 1 2018 to be effective Services, LLC, North American Power 3/1/2018. and Gas, LLC, North American Power Filed Date: 8/31/18. Accession Number: 20180831–5193. Business, LLC, Power Contract Comments Due: 5 p.m. ET 9/21/18. Financing, L.L.C. Description: Notification of Change in Docket Numbers: ER18–1169–003. Applicants: California Independent Status of the Indicated Calpine MBR System Operator Corporation. Sellers. daltland on DSKBBV9HB2PROD with NOTICES conservation measures needed to protect species listed under the Endangered Species Act that may be affected by continued operation of the existing Yuba-Bear Hydroelectric Project. The primary species to be discussed include the California redlegged frog and Sierra Nevada yellowlegged frog. f. All local, state, and federal agencies, Indian tribes, and other interested parties are invited to attend by phone. Please call Alan Mitchnick at (202) 502– 6074, or email alan.mitchnick@ferc.gov by September 18, 2018, to RSVP and to receive specific instructions on how to participate. VerDate Sep<11>2014 17:54 Sep 07, 2018 Jkt 244001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 Description: Compliance filing: 2018– 08–31 Limited Tariff Waiver PetitionPostpone Effect. Date to April 1 2019 to be effective N/A. Filed Date: 8/31/18. Accession Number: 20180831–5174. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2312–000. Applicants: Enel Green Power Diamond Vista Wind Project, LLC. Description: Report Filing: MBR Tariff to be effective N/A. Filed Date: 8/31/18. Accession Number: 20180831–5092. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2370–000. Applicants: Lackawanna Energy Center LLC. Description: Initial rate filing: Filing of Reactive Power Rate Schedule to be effective 10/1/2018. Filed Date: 8/31/18. Accession Number: 20180831–5191. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2371–000. Applicants: New England Power Pool Participants Committee. Description: § 205(d) Rate Filing: September 2018 Membership Filing to be effective 9/1/2018. Filed Date: 8/31/18. Accession Number: 20180831–5194. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2372–000. Applicants: Florida Power & Light Company. Description: § 205(d) Rate Filing: FPL and Seminole NITSA 162 Revisions to be effective 9/1/2018. Filed Date: 8/31/18. Accession Number: 20180831–5195. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2373–000. Applicants: Duke Energy Progress, LLC. Description: § 205(d) Rate Filing: DEP–DOM IA RS. No. 196 Concurrence Filing (Battleboro) to be effective 10/26/2018. Filed Date: 9/4/18. Accession Number: 20180904–5074. Comments Due: 5 p.m. ET 9/25/18. Docket Numbers: ER18–2374–000. Applicants: Southwestern Electric Power Company. Description: § 205(d) Rate Filing: Hope PSA to be effective 8/1/2018. Filed Date: 9/4/18. Accession Number: 20180904–5080. Comments Due: 5 p.m. ET 9/25/18. Docket Numbers: ER18–2375–000. Applicants: Tampa Electric Company Description: § 205(d) Rate Filing: Underfrequency Load Shedding Update to be effective 9/5/2018. Filed Date: 9/4/18. Accession Number: 20180904–5135. E:\FR\FM\10SEN1.SGM 10SEN1

Agencies

[Federal Register Volume 83, Number 175 (Monday, September 10, 2018)]
[Notices]
[Pages 45623-45624]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19551]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2266-102]


Nevada Irrigation District; Notice of Teleconference

    a. Project Name and Number: Yuba-Bear Hydroelectric Project No. 
2266.
    b. Applicant: Nevada Irrigation District.
    c. Date and Time of Teleconference: September 25, 2018, 10:00 a.m. 
Pacific Daylight Time (1:00 p.m. Eastern Daylight Time).
    d. FERC Contact: Alan Mitchnick at (202) 502-6074, 
[email protected].
    e. Purpose of Meeting: The Federal Energy Regulatory Commission 
staff will participate in a meeting with the U.S. Fish and Wildlife 
Service and the Nevada Irrigation District to discuss

[[Page 45624]]

conservation measures needed to protect species listed under the 
Endangered Species Act that may be affected by continued operation of 
the existing Yuba-Bear Hydroelectric Project. The primary species to be 
discussed include the California red-legged frog and Sierra Nevada 
yellow-legged frog.
    f. All local, state, and federal agencies, Indian tribes, and other 
interested parties are invited to attend by phone. Please call Alan 
Mitchnick at (202) 502-6074, or email [email protected] by 
September 18, 2018, to RSVP and to receive specific instructions on how 
to participate.

    Dated: September 4, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-19551 Filed 9-7-18; 8:45 am]
 BILLING CODE 6717-01-P