Environmental Impact Statements; Notice of Availability, 45442 [2018-19424]
Download as PDF
45442
Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices
parties; and local libraries and
newspapers. Major issues raised during
scoping included wetland impacts and
mitigation, and dredge material testing
and beneficial reuse.
The U.S. Coast Guard; U.S.
Department of Energy; U.S. Department
of Transportation, Pipeline and
Hazardous Materials Safety
Administration; U.S. Army Corps of
Engineers, Galveston District; and U.S.
Environmental Protection Agency are
cooperating agencies in the preparation
of the EIS.
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Projects is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
eLibrary link, select General Search
from the eLibrary menu, enter the
selected date range and Docket Number
excluding the last three digits (i.e.,
CP17–20, CP17–21, or CP18–7), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
website also provides access to the texts
of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19392 Filed 9–6–18; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9041–2]
daltland on DSKBBV9HB2PROD with NOTICES
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7156 or https://www2.epa.gov/
nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 08/27/2018 Through 08/31/2018
VerDate Sep<11>2014
17:55 Sep 06, 2018
Jkt 244001
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20180203, Draft Supplement,
USN, HI, Surveillance Towed Array
Sensor System (SURTASS LFA)
Sonar, Comment Period Ends:
10/22/2018, Contact: Patrick Havel
703–695–8266.
EIS No. 20180204, Final, USACE, AZ,
Ray Mine Tailings Storage Facility,
Review Period Ends: 10/09/2018,
Contact: Michael Langley 602–689–
0606.
EIS No. 20180205, Revised Draft,
USFWS, WA, Revised Draft
Environmental Impact Statement for a
Long-term Conservation Strategy for
the Marbled Murrelet, Comment
Period Ends: 11/06/2018, Contact:
Mark Ostwald 360–753–9564.
EIS No. 20180206, Revised Draft,
USACE, NY, Integrated Hurricane
Sandy General Reevaluation Report
and Environmental Impact Statement,
Atlantic Coast of New York, East
Rockaway Inlet to Rockaway Inlet and
Jamaica Bay, Comment Period Ends:
10/22/2018, Contact: Daria Mazey
917–790–8726.
EIS No. 20180207, Final, USACE, NE,
Missouri River Recovery Management
Plan, Review Period Ends: 10/09/
2018, Contact: Tiffany Vanosdall 402–
995–2695.
EIS No. 20180208, Draft, BLM, OR,
Tucker Hill Perlite Mine Expansion
Plan of Operations Amendment No. 7,
Comment Period Ends: 10/22/2018,
Contact: Paul Whitman 541–947–
6110.
Amended Notices
EIS No. 20180124, Draft, USFS, MT,
Draft Environmental Impact
Statement for the Draft Revised Forest
Plan Helena—Lewis and Clark
National Forest, Revision to the FR
Notice Published 06/08/2018, Extend
Comment Period from 09/06/2018 to
10/09/2018, Contact: Deborah
Entwistle 406–495–3774.
EIS No. 20180185, Draft, BLM, UT,
Grand Staircase-Escalante National
Monument-Grand Staircase,
Kaiparowits, and Escalante Canyon
Units and Federal Lands Previously
Included in the Monument that are
excluded from the Boundaries Draft
Resource Management Plans and
Associated Environmental Impact
Statement, Revision to FR Notice
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Published 08/17/2018, Extend
comment period from 11/15/2018 to
11/30/2018, Contact: Matt Betenson
435–644–1200.
EIS No. 20180189, Draft, NRC, LA,
License Renewal for Waterford Steam
Electric Station, Unit 3, NUREG–1437,
Supplement 59, Correction to FR
Notice Published 08/24/2018, List
correct project title, Contact: Elaine
Keegan 301–415–8517.
Dated: September 4, 2018.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2018–19424 Filed 9–6–18; 8:45 am]
BILLING CODE 6560–50–P
DEPARTMENT OF HEALTH AND
HUMAN SERVICES
Centers for Disease Control and
Prevention
[30Day–18–17AZI]
Agency Forms Undergoing Paperwork
Reduction Act Review
In accordance with the Paperwork
Reduction Act of 1995, the Centers for
Disease Control and Prevention (CDC)
has submitted the information
collection request titled Understanding
Decisions and Barriers about PrEP Use
and Uptake Among Men Who Have Sex
With Men to the Office of Management
and Budget (OMB) for review and
approval. CDC previously published a
‘‘Proposed Data Collection Submitted
for Public Comment and
Recommendations’’ notice on October
10, 2017 to obtain comments from the
public and affected agencies. CDC did
not receive comments related to the
previous notice. This notice serves to
allow an additional 30 days for public
and affected agency comments.
CDC will accept all comments for this
proposed information collection project.
The Office of Management and Budget
is particularly interested in comments
that:
(a) Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the agency, including
whether the information will have
practical utility;
(b) Evaluate the accuracy of the
agencies estimate of the burden of the
proposed collection of information,
including the validity of the
methodology and assumptions used;
(c) Enhance the quality, utility, and
clarity of the information to be
collected;
(d) Minimize the burden of the
collection of information on those who
E:\FR\FM\07SEN1.SGM
07SEN1
Agencies
[Federal Register Volume 83, Number 174 (Friday, September 7, 2018)]
[Notices]
[Page 45442]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19424]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9041-2]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7156 or https://www2.epa.gov/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 08/27/2018 Through 08/31/2018
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
EIS No. 20180203, Draft Supplement, USN, HI, Surveillance Towed Array
Sensor System (SURTASS LFA) Sonar, Comment Period Ends: 10/22/2018,
Contact: Patrick Havel 703-695-8266.
EIS No. 20180204, Final, USACE, AZ, Ray Mine Tailings Storage Facility,
Review Period Ends: 10/09/2018, Contact: Michael Langley 602-689-0606.
EIS No. 20180205, Revised Draft, USFWS, WA, Revised Draft Environmental
Impact Statement for a Long-term Conservation Strategy for the Marbled
Murrelet, Comment Period Ends: 11/06/2018, Contact: Mark Ostwald 360-
753-9564.
EIS No. 20180206, Revised Draft, USACE, NY, Integrated Hurricane Sandy
General Reevaluation Report and Environmental Impact Statement,
Atlantic Coast of New York, East Rockaway Inlet to Rockaway Inlet and
Jamaica Bay, Comment Period Ends: 10/22/2018, Contact: Daria Mazey 917-
790-8726.
EIS No. 20180207, Final, USACE, NE, Missouri River Recovery Management
Plan, Review Period Ends: 10/09/2018, Contact: Tiffany Vanosdall 402-
995-2695.
EIS No. 20180208, Draft, BLM, OR, Tucker Hill Perlite Mine Expansion
Plan of Operations Amendment No. 7, Comment Period Ends: 10/22/2018,
Contact: Paul Whitman 541-947-6110.
Amended Notices
EIS No. 20180124, Draft, USFS, MT, Draft Environmental Impact Statement
for the Draft Revised Forest Plan Helena--Lewis and Clark National
Forest, Revision to the FR Notice Published 06/08/2018, Extend Comment
Period from 09/06/2018 to 10/09/2018, Contact: Deborah Entwistle 406-
495-3774.
EIS No. 20180185, Draft, BLM, UT, Grand Staircase-Escalante National
Monument-Grand Staircase, Kaiparowits, and Escalante Canyon Units and
Federal Lands Previously Included in the Monument that are excluded
from the Boundaries Draft Resource Management Plans and Associated
Environmental Impact Statement, Revision to FR Notice Published 08/17/
2018, Extend comment period from 11/15/2018 to 11/30/2018, Contact:
Matt Betenson 435-644-1200.
EIS No. 20180189, Draft, NRC, LA, License Renewal for Waterford Steam
Electric Station, Unit 3, NUREG-1437, Supplement 59, Correction to FR
Notice Published 08/24/2018, List correct project title, Contact:
Elaine Keegan 301-415-8517.
Dated: September 4, 2018.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2018-19424 Filed 9-6-18; 8:45 am]
BILLING CODE 6560-50-P