Combined Notice of Filings #2, 45425-45426 [2018-19409]

Download as PDF Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices Louisiana. On the same day, TransCameron Pipeline, LLC filed an application in Docket No. CP15–551– 000 requesting a Certificate of Public Convenience and Necessity pursuant to section 7(c) of the NGA to construct, operate, and maintain certain natural gas pipeline facilities. The combined proposed projects, known as the Calcasieu Pass Project (Project), would liquefy and export about 12 million tons per annum of LNG. In accordance with Title 41 of the Fixing America’s Surface Transportation Act, enacted on December 4, 2015, agencies are to publish completion dates for all federal environmental reviews and authorizations. This notice identifies the Commission’s anticipated schedule for issuance of the final order for the Project, which is based on the anticipated date of issuance of the final Environmental Impact Statement. Accordingly, we currently anticipate issuing a final order for the Project no later than: Issuance of Final Order—January 22, 2019 If a schedule change becomes necessary for the final order, an additional notice will be provided so that interested parties and government agencies are kept informed of the Project’s progress. Dated: August 31, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–19389 Filed 9–6–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP17–117–000; CP17–118– 000] daltland on DSKBBV9HB2PROD with NOTICES Notice of Revised Schedule for Environmental Review of the Driftwood LNG LLC and Driftwood Pipeline LLC Driftwood LNG Project This notice identifies the Federal Energy Regulatory Commission (FERC) staff’s revised schedule for the completion of the environmental impact statement (EIS) for Driftwood LNG LLC’s liquefied natural gas facility and for Driftwood Pipeline LLC’s pipeline facilities, collectively referred to as the Driftwood LNG Project. The first notice of schedule, issued on December 22, 2017, identified October 12, 2018 as the final EIS issuance date. Staff has revised the schedule for issuance of the final EIS, based on an issuance of the draft EIS in September 2018. The forecasted VerDate Sep<11>2014 17:55 Sep 06, 2018 Jkt 244001 schedule for both the draft and final EIS is based upon Driftwood LNG LLC and Driftwood Pipeline LLC providing complete and timely responses to any future data requests. In addition, the schedule assumes that the cooperating agencies will provide input on their areas of responsibility on a timely basis. Schedule for Environmental Review Issuance of Notice of Availability of the final EIS—January 18, 2019 90-day Federal Authorization Decision Deadline—April 18, 2019 If a schedule change becomes necessary, an additional notice will be provided so that the relevant agencies are kept informed of the project’s progress. Additional Information In order to receive notification of the issuance of the EIS and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC website (www.ferc.gov). Using the eLibrary link, select General Search from the eLibrary menu, enter the selected date range and Docket Number excluding the last three digits (i.e., CP17–117 or CP17–118), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: August 31, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–19395 Filed 9–6–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 45425 Docket Numbers: ER18–2364–000. Applicants: ISO New England Inc. Description: Compliance filing: ISO– NE Filing to Establish a Fuel Security Reliability Standard; EL18–182–000 to be effective 10/30/2018. Filed Date: 8/31/18. Accession Number: 20180831–5137. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2365–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: SA 697 4th Revised—NITSA with the City of Great Falls to be effective 11/1/2018. Filed Date: 8/31/18. Accession Number: 20180831–5148. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2366–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2018–08–31 Reliability Coordinator Services Amendment to be effective 11/15/2018. Filed Date: 8/31/18. Accession Number: 20180831–5165. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2367–000. Applicants: Duke Energy Progress, LLC, Duke Energy Carolinas, LLC. Description: § 205(d) Rate Filing: DEC–DEP Revisions to Joint OATT Formula Transmission Rates (M&S) to be effective 11/1/2018. Filed Date: 8/31/18. Accession Number: 20180831–5179. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2368–000. Applicants: Duke Energy Florida, LLC. Description: § 205(d) Rate Filing: DEF Revisions to Joint OATT Formula Transmission Rates (M&S and Storm Damage) to be effective 11/1/2018. Filed Date: 8/31/18. Accession Number: 20180831–5181. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2369–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2018–08–31 Interim Reliability MustRun Agreement to be effective 9/1/2018. Filed Date: 8/31/18. Accession Number: 20180831–5189. Comments Due: 5 p.m. ET 9/21/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern E:\FR\FM\07SEN1.SGM 07SEN1 45426 Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Accordingly, we currently anticipate issuing a final order for the Project no later than: Issuance of Final Order—November 29, 2019 If a schedule change becomes necessary for the final order, an additional notice will be provided so that interested parties and government agencies are kept informed of the Project’s progress. Dated: August 31, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. Dated: August 31, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–19404 Filed 9–6–18; 8:45 am] [FR Doc. 2018–19409 Filed 9–6–18; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket Nos. CP17–495–000; CP17–494– 000] [Docket No. CP17–470–000] daltland on DSKBBV9HB2PROD with NOTICES Notice of Anticipated Schedule of Final Order for the Jordan Cove Project: Jordan Cove Energy Project, LP; Pacific Connector Gas Pipeline, LP On September 21, 2017, Jordan Cove Energy Project, L.P. filed an application in Docket No. CP17–495–000, pursuant to section 3 of the Natural Gas Act (NGA) and Part 153 of the Commission’s regulations, for authorization to site, construct and operate a liquefied natural gas export terminal and associated facilities on the bay side of the North Spit of Coos Bay in unincorporated Coos County, Oregon. On the same day, Pacific Connector Gas Pipeline, LP filed an application in Docket No. CP17–494– 000 requesting a Certificate of Public Convenience and Necessity, pursuant to section 7(c) of the NGA and Parts 157 and 284 of the Commission’s regulations, to construct, operate, and maintain an approximately 220-milelong natural gas pipeline to be located in Klamath, Jackson, Douglas, and Coos Counties, Oregon. The combined proposed projects, known as the Jordan Cove Project (Project), would liquefy and export about 7.8 million metric tons of natural gas per annum. In accordance with Title 41 of the Fixing America’s Surface Transportation Act, enacted on December 4, 2015, agencies are to publish completion dates for all federal environmental reviews and authorizations. This notice identifies the Commission’s anticipated schedule for issuance of the final order for the Project, which is based on the anticipated date of issuance of the final Environmental Impact Statement. VerDate Sep<11>2014 17:55 Sep 06, 2018 Jkt 244001 Freeport LNG Development, L.P.; Notice of Schedule for Environmental Review of the Train 4 Project On June 29, 2017, Freeport LNG Development, L.P. (Freeport LNG) filed an application in Docket No. CP17–470– 000 requesting an Authorization for siting, construction, and operation of a liquefied natural gas (LNG) facility pursuant to Section 3 of the Natural Gas Act. The proposed project is known as the Train 4 Project (Project), and would increase Freeport LNG’s ability to liquefy and export by 5.1 million metric tonnes per annum of natural gas at the existing Freeport LNG terminal. On July 14, 2017, the Federal Energy Regulatory Commission (Commission or FERC) issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s Environmental Assessment (EA) for the Project. This instant notice identifies the FERC staff’s planned schedule for the completion of the EA for the Project. Schedule for Environmental Review Issuance of the EA—November 2, 2018 90-day Federal Authorization Decision Deadline—January 31, 2019 If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 Project Description The Project would add a fourth liquefaction unit (Train 4) and associated infrastructure and utilities to Freeport LNG’s terminal on Quintana Island in Brazoria County, Texas. The Project would also expand the Pretreatment Plant located about 4 miles north of the terminal in Freeport, Texas and includes a new pipeline to connect various facilities. The Project would be located adjacent to the facilities authorized and currently under construction for the Phase II Modification Project (Docket No. CP12– 29–000) and Liquefaction Project (Docket No. CP12–509–000), which comprises three liquefaction trains and related facilities. The proposed fourth liquefaction train would be within the existing Freeport LNG Terminal site and the additions to the Pretreatment Plant would be within the current construction footprint. The proposed 10.6-mile-long, 42-inch-diameter pipeline would connect the existing Stratton Ridge meter station, the Pretreatment Plant, and the Freeport LNG Liquefaction Plant. Background On August 19, 2015 the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the Planned Train 4 Project and Request for Comments on Environmental Issues (NOI). A subsequent change to the Project resulted in the Commission issuing the Supplemental Notice of Intent to Prepare an Environmental Assessment for the Planned Freeport LNG Train 4 Project and Request for Comments on Environmental Issues (Supplemental NOI) on August 31, 2016. The NOI and the Supplemental NOI were issued during the pre-filing review of the Project in Docket No. PF15–25–000 and were sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. In response to the NOI and Supplemental NOI; the Commission received comments from the Federal Emergency Management Agency, U.S. Environmental Protection Agency, Texas Historical Commission, U.S. Fish and Wildlife Service, Texas Parks and Wildlife, Sierra Club, and eight members of the public. The primary issues raised by the commentors are alternative pipeline routes, and impacts on land use, wetlands, protected species, visual landscape, noise environment, air quality, road traffic, marine traffic, and safety. E:\FR\FM\07SEN1.SGM 07SEN1

Agencies

[Federal Register Volume 83, Number 174 (Friday, September 7, 2018)]
[Notices]
[Pages 45425-45426]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19409]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER18-2364-000.
    Applicants: ISO New England Inc.
    Description: Compliance filing: ISO-NE Filing to Establish a Fuel 
Security Reliability Standard; EL18-182-000 to be effective 10/30/2018.
    Filed Date: 8/31/18.
    Accession Number: 20180831-5137.
    Comments Due: 5 p.m. ET 9/21/18.

    Docket Numbers: ER18-2365-000.
    Applicants: NorthWestern Corporation.
    Description: Sec.  205(d) Rate Filing: SA 697 4th Revised--NITSA 
with the City of Great Falls to be effective 11/1/2018.
    Filed Date: 8/31/18.
    Accession Number: 20180831-5148.
    Comments Due: 5 p.m. ET 9/21/18.

    Docket Numbers: ER18-2366-000.
    Applicants: California Independent System Operator Corporation.
    Description: Sec.  205(d) Rate Filing: 2018-08-31 Reliability 
Coordinator Services Amendment to be effective 11/15/2018.
    Filed Date: 8/31/18.
    Accession Number: 20180831-5165.
    Comments Due: 5 p.m. ET 9/21/18.

    Docket Numbers: ER18-2367-000.
    Applicants: Duke Energy Progress, LLC, Duke Energy Carolinas, LLC.
    Description: Sec.  205(d) Rate Filing: DEC-DEP Revisions to Joint 
OATT Formula Transmission Rates (M&S) to be effective 11/1/2018.
    Filed Date: 8/31/18.
    Accession Number: 20180831-5179.
    Comments Due: 5 p.m. ET 9/21/18.

    Docket Numbers: ER18-2368-000.
    Applicants: Duke Energy Florida, LLC.
    Description: Sec.  205(d) Rate Filing: DEF Revisions to Joint OATT 
Formula Transmission Rates (M&S and Storm Damage) to be effective 11/1/
2018.
    Filed Date: 8/31/18.
    Accession Number: 20180831-5181.
    Comments Due: 5 p.m. ET 9/21/18.

    Docket Numbers: ER18-2369-000.
    Applicants: California Independent System Operator Corporation.
    Description: Sec.  205(d) Rate Filing: 2018-08-31 Interim 
Reliability Must-Run Agreement to be effective 9/1/2018.
    Filed Date: 8/31/18.
    Accession Number: 20180831-5189.
    Comments Due: 5 p.m. ET 9/21/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern

[[Page 45426]]

time on the specified comment date. Protests may be considered, but 
intervention is necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-19409 Filed 9-6-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.