Project Description
Texas LNG’s proposed facilities
include two liquefaction trains, each
capable of producing 2 million tonnes
per annum, one new LNG storage tank,
and a single marine berth capable of
accommodating LNG carriers with
capacities up to 180,000 cubic meters.
The Project would be constructed on
about 285 acres of a 625-acre parcel of
land, on the north side of the
Brownsville Ship Channel near mile
marker 4. An additional 26.5 acres
would be located outside of the 625-acre
parcel to provide deepwater access to
the Brownsville Ship Channel.
Background
On April 14, 2015, the Commission
staff granted Texas LNG’s request to use
the FERC’s Pre-filing environmental
review process and assigned the Texas
LNG Project Docket No. PF15–14–000.
On July 23, 2015, the Commission
issued a Notice of Intent to Prepare an
Environmental Impact Statement for the
Planned Texas LNG Project, Request for
Comments on Environmental Issues,
and Notice of Public Scoping Meeting
(NOI).
The NOI was issued during the prefiling review of the project in Docket
No. PF15–14–000 and was sent to
federal, state, and local government
agencies; elected officials; affected
landowners; environmental and public
interest groups; Native American tribes
and regional organizations; commenters
and other interested parties; and local
libraries and newspapers. Major issues
raised during scoping include
threatened and endangered species,
LNG safety, land use, water quality, air
quality, and cumulative impacts.
The U.S. Department of Energy, U.S.
Coast Guard, U.S. Department of
Transportation, U.S. Army Corps of
Engineers, U.S. Environmental
Protection Agency, U.S. Fish and
Wildlife Service, National Park Service,
National Marine Fisheries Service, and
Federal Aviation Administration are
cooperating agencies in the preparation
of the EIS.
daltland on DSKBBV9HB2PROD with NOTICES
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
VerDate Sep<11>2014
17:55 Sep 06, 2018
Jkt 244001
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
eLibrary link, select General Search
from the eLibrary menu, enter the
selected date range and Docket Number
excluding the last three digits (i.e.,
CP16–116), and follow the instructions.
For assistance with access to eLibrary,
the helpline can be reached at (866)
208–3676, TTY (202) 502–8659, or at
FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19390 Filed 9–6–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–178–000]
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
eLibrary link, select General Search
from the eLibrary menu, enter the
selected date range and Docket Number
excluding the last three digits (i.e.,
CP17–178), and follow the instructions.
For assistance with access to eLibrary,
the helpline can be reached at (866)
208–3676, TTY (202) 502–8659, or at
FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Notice of Revised Schedule for
Environmental Review of the Alaska
Gasline Development Corporation
Alaska LNG Project
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
This notice identifies the Federal
Energy Regulatory Commission (FERC)
staff’s revised schedule for the
completion of the environmental impact
statement (EIS) for the Alaska LNG
Project (Project). The first notice of
schedule, issued on March 12, 2018,
identified December 9, 2019 as the final
EIS issuance date. Staff has revised the
schedule for issuance of the final EIS,
based on an issuance of the draft EIS in
February 2019. The forecasted schedule
for both the draft and final EIS is based
upon the Alaska Gasline Development
Corporation providing complete and
timely responses to any future data
requests. In addition, the schedule
assumes that the cooperating agencies
will provide input on their areas of
responsibility on a timely basis.
BILLING CODE 6717–01–P
Schedule for Environmental Review
Issuance of Notice of Availability of the
final EIS—November 8, 2019
90-Day Federal Authorization Decision
Deadline—February 6, 2020
If a schedule change becomes
necessary for the final EIS, an additional
notice will be provided so that the
relevant agencies are kept informed of
the Project’s progress.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
[FR Doc. 2018–19401 Filed 9–6–18; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–145–000.
Applicants: Choice Energy, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Choice
Energy LLC.
Filed Date: 8/29/18.
Accession Number: 20180829–5158.
Comments Due: 5 p.m. ET 9/19/18.
Docket Numbers: EC18–146–000.
Applicants: PPL Electric Utilities
Corporation.
Description: Application for
Authorization under Section 203 of the
Federal Power Act of PPL Electric
Utilities Corporation.
Filed Date: 8/30/18.
Accession Number: 20180830–5169.
Comments Due: 5 p.m. ET 9/20/18.
E:\FR\FM\07SEN1.SGM
07SEN1
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices
Docket Numbers: EC18–147–000.
Applicants: Avista Corporation.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Avista
Corporation.
Filed Date: 8/31/18.
Accession Number: 20180831–5081.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: EC18–148–000.
Applicants: Golden Fields Solar II,
LLC, Golden Fields Solar III, LLC,
Golden Fields Solar IV, LLC, Golden
Fields Solar V, LLC.
Description: Application for
Authorization under Section 203 of the
Federal Power Act for Disposition of
Jurisdictional Facilities, et al, of Golden
Fields Solar II, LLC, et al.
Filed Date: 8/31/18.
Accession Number: 20180831–5090.
Comments Due: 5 p.m. ET 9/21/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–256–005;
ER17–242–005; ER17–243–005; ER17–
245–005; ER17–652–005.
Applicants: Darby Power, LLC, Gavin
Power, LLC, Lawrenceburg Power, LLC,
Waterford Power, LLC, Lightstone
Marketing LLC.
Description: Notice of Non-Material
Change in Status of Darby Power, LLC,
et al.
Filed Date: 8/30/18.
Accession Number: 20180830–5228.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–1648–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–08–29_Deficiency response to
Time Limits for Disputes and
Resettlements to be effective 11/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5050.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2073–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–08–31_SA 3134 ETI-Liberty
County Solar Project GIA (J483)
Amendment to be effective 7/13/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5078.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2075–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–08–31_SA 3135 ELL–ELL GIA
(J484) Amendment to be effective
7/13/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5094.
VerDate Sep<11>2014
17:55 Sep 06, 2018
Jkt 244001
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2076–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–08–31_SA 3136 Entergy Texas,
Inc-Entergy Texas, Inc GIA (J472)
Amendment to be effective 7/13/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5114.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2346–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Oncor Electric Delivery
Company Amended TSA to be effective
8/3/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5179.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2347–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3474
Clarksville Light & Water NITSA NOA
to be effective 8/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5180.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2348–000.
Applicants: Idaho Power Company.
Description: Tariff Cancellation:
Notice of Cancellation of Rate Schedule
166—Goshen-Jefferson Line Rebuild to
be effective 10/29/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5183.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2349–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
Bentonville PSA to be effective
8/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5194.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2350–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OATT, Sch. 12-Appx A re:
RTEP Projects Approved July 2018 to be
effective 11/28/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5201.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2351–000.
Applicants: New York State Electric &
Gas Corporation.
Description: § 205(d) Rate Filing:
NYSEG–KCE NY1 EPC Agreement to be
effective 8/30/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5203.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2352–000.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
45439
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–08–30_Real-Time Buybacks of
Spinning and Offline Supplemental
Reserve to be effective 12/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5204.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2353–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–08–30_Price Volatility Make
Whole Payments Enhancement to be
effective 12/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5205.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2354–000.
Applicants: BE CA LLC.
Description: Tariff Cancellation: MBR
Tariff Cancellation to be effective 9/30/
2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5206.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2355–000.
Applicants: Virginia Electric and
Power Company, Duke Energy Progress,
LLC, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
VEPCO and Duke Energy Process submit
amended IA SA No. 3453 to be effective
10/26/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5211.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2356–000.
Applicants: Florida Power
Development LLC.
Description: Tariff Cancellation: MBR
Tariff cancellation to be effective
9/30/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5212.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2357–000.
Applicants: Interstate Power and
Light Company.
Description: § 205(d) Rate Filing:
IPL—Hearland—CIPCO LBA Agreement
to be effective 10/29/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5213.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2358–000.
Applicants: GridLiance High Plains
LLC, Southwest Power Pool, Inc.
Description: § 205(d) Rate Filing:
Revisions to Add Oklahoma Panhandle
Facilities for GridLiance High Plains
LLC to be effective 11/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5216.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2359–000.
E:\FR\FM\07SEN1.SGM
07SEN1
daltland on DSKBBV9HB2PROD with NOTICES
45440
Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Second Revised ISA SA No. 2832;
Queue #AC1–181 to be effective
8/28/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5218.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2360–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2018–08–30 EIM Agreement with
Balancing Authority of Northern
California to be effective 10/30/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5222.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2361–000.
Applicants: Enel Green Power
Hilltopper Wind, LLC.
Description: Baseline eTariff Filing:
MBR Tariff to be effective
9/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5223.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2362–000.
Applicants: NTE Ohio, LLC.
Description: Baseline eTariff Filing:
Baseline new rates to be effective
9/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830–5227.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18–2363–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–08–31_Refiling of Resource
Adequacy Construct Locational
Enhancements to be effective 11/1/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5128.
Comments Due: 5 p.m. ET 9/21/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
17:55 Sep 06, 2018
Jkt 244001
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19408 Filed 9–6–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–521–000]
Gulf LNG Liquefaction Company, LLC,
Gulf LNG Energy, LLC, Gulf LNG
Pipelines, LLC; Notice of Schedule for
Environmental Review of the Gulf LNG
Liquefaction Project
On June 19, 2015, Gulf LNG
Liquefaction Company, LLC and Gulf
LNG Energy, LLC, and Gulf LNG
Pipeline, LLC (collectively referred to as
Gulf LNG) filed an application with the
Federal Energy Regulatory Commission
(FERC or Commission) in Docket No.
CP15–521–000 pursuant to section 3(a)
and 7(c) of the Natural Gas Act,
requesting authorization to construct
and operate the Gulf LNG Liquefaction
Project (Project) at Gulf Energy’s
existing import liquefied natural gas
(LNG) terminal in Jackson County,
Mississippi. Within the same
application, Gulf LNG Pipeline, LLC
proposes to make modifications to the
terminal’s send-out pipeline to allow for
bi-directional flow. The Project would
expand the terminal to enable it to
liquefy approximately 11 million metric
tons of LNG per year for export. On June
15, 2012, in Order No. 3104, the U.S.
Department of Energy, Office of Fossil
Energy, granted to Gulf LNG
authorization to export LNG by vessel
from the terminal to Free Trade
Agreement nations. On August 31, 2012,
Gulf LNG filed an application with the
U.S. Department of Energy, Office of
Fossil Energy, for a long-term, multicontract authorization to export LNG to
Non-Free Trade Agreement nations. A
decision by the U.S. Department of
Energy, Office of Fossil Energy is still
pending.
FERC issued its Notice of Application
for the Project on July 1, 2015. Among
other things, that notice alerted other
agencies issuing federal authorizations
of the requirement to complete all
necessary reviews and to reach a final
decision on the request for a federal
authorization within 90 days of the date
of issuance of the Commission staff’s
final environmental impact statement
(EIS) for the Project. This notice
identifies the FERC staff’s planned
schedule for completion of the final EIS
for the Gulf LNG Liquefaction Project,
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
which is based on an issuance of the
draft EIS in November 2018. The
forecasted schedule for both the draft
and final EIS is based upon Gulf LNG
providing complete and timely
responses to any future data requests. In
addition, the schedule assumes that the
cooperating agencies will provide input
on their areas of responsibility on a
timely basis.
Schedule for Environmental Review
Issuance of Notice of Availability of the
final EIS—April 17, 2019
90-Day Federal Authorization Decision
Deadline—July 16, 2019
If a schedule change becomes
necessary for the final EIS, an additional
notice will be provided so that the
relevant agencies are kept informed of
project’s progress.
Background
On May 21, 2014, the Commission
staff granted Gulf LNG’s request to use
FERC’s pre-filing environmental review
process and assigned the Gulf LNG
Liquefaction Project Docket No. PF13–
4–000. On July 31, 2014, the
Commission issued a Notice of Intent to
Prepare an Environmental Impact
Statement for the Planned Gulf LNG
Liquefaction Project, Request for
Comments on Environmental Issues,
and Notice of Public Scoping Meeting.
On August 27, 2014, the Commission
issued a Notice of Extension of Time to
allow additional time for comments.
The notices were sent to federal, state,
and local government representatives
and agencies; elected officials;
environmental and public interest
groups; Native American Tribes;
affected property owners; other
interested parties; and local libraries
and newspapers. Major issues raised
during scoping include impacts on air
and water quality, socioeconomic
conditions, environmental justice,
federal and state-listed threatened and
endangered species, noise levels and
nighttime light, visual resources, public
safety, and cumulative impacts.
The U.S. Army Corps of Engineers;
U.S. Coast Guard; U.S. Department of
Energy, Office of Fossil Energy; U.S.
Department of Transportation, Pipeline
and Hazardous Materials Safety
Administration; U.S. Fish and Wildlife
Service; National Oceanic and
Atmospheric Administration, National
Marine Fisheries Service; and U.S.
Environmental Protection Agency are
cooperating agencies in the preparation
of the EIS.
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
E:\FR\FM\07SEN1.SGM
07SEN1
Agencies
[Federal Register Volume 83, Number 174 (Friday, September 7, 2018)]
[Notices]
[Pages 45438-45440]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19408]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-145-000.
Applicants: Choice Energy, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Choice Energy LLC.
Filed Date: 8/29/18.
Accession Number: 20180829-5158.
Comments Due: 5 p.m. ET 9/19/18.
Docket Numbers: EC18-146-000.
Applicants: PPL Electric Utilities Corporation.
Description: Application for Authorization under Section 203 of the
Federal Power Act of PPL Electric Utilities Corporation.
Filed Date: 8/30/18.
Accession Number: 20180830-5169.
Comments Due: 5 p.m. ET 9/20/18.
[[Page 45439]]
Docket Numbers: EC18-147-000.
Applicants: Avista Corporation.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Avista Corporation.
Filed Date: 8/31/18.
Accession Number: 20180831-5081.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: EC18-148-000.
Applicants: Golden Fields Solar II, LLC, Golden Fields Solar III,
LLC, Golden Fields Solar IV, LLC, Golden Fields Solar V, LLC.
Description: Application for Authorization under Section 203 of the
Federal Power Act for Disposition of Jurisdictional Facilities, et al,
of Golden Fields Solar II, LLC, et al.
Filed Date: 8/31/18.
Accession Number: 20180831-5090.
Comments Due: 5 p.m. ET 9/21/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-256-005; ER17-242-005; ER17-243-005; ER17-245-
005; ER17-652-005.
Applicants: Darby Power, LLC, Gavin Power, LLC, Lawrenceburg Power,
LLC, Waterford Power, LLC, Lightstone Marketing LLC.
Description: Notice of Non-Material Change in Status of Darby
Power, LLC, et al.
Filed Date: 8/30/18.
Accession Number: 20180830-5228.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-1648-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2018-08-29_Deficiency response to
Time Limits for Disputes and Resettlements to be effective 11/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5050.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2073-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2018-08-31_SA 3134 ETI-Liberty
County Solar Project GIA (J483) Amendment to be effective 7/13/2018.
Filed Date: 8/31/18.
Accession Number: 20180831-5078.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18-2075-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2018-08-31_SA 3135 ELL-ELL GIA
(J484) Amendment to be effective 7/13/2018.
Filed Date: 8/31/18.
Accession Number: 20180831-5094.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18-2076-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2018-08-31_SA 3136 Entergy Texas,
Inc-Entergy Texas, Inc GIA (J472) Amendment to be effective 7/13/2018.
Filed Date: 8/31/18.
Accession Number: 20180831-5114.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18-2346-000.
Applicants: AEP Texas Inc.
Description: Sec. 205(d) Rate Filing: AEPTX-Oncor Electric
Delivery Company Amended TSA to be effective 8/3/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5179.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2347-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3474 Clarksville Light &
Water NITSA NOA to be effective 8/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5180.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2348-000.
Applicants: Idaho Power Company.
Description: Tariff Cancellation: Notice of Cancellation of Rate
Schedule 166--Goshen-Jefferson Line Rebuild to be effective 10/29/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5183.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2349-000.
Applicants: Southwestern Electric Power Company.
Description: Sec. 205(d) Rate Filing: Bentonville PSA to be
effective 8/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5194.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2350-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to OATT, Sch. 12-
Appx A re: RTEP Projects Approved July 2018 to be effective 11/28/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5201.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2351-000.
Applicants: New York State Electric & Gas Corporation.
Description: Sec. 205(d) Rate Filing: NYSEG-KCE NY1 EPC Agreement
to be effective 8/30/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5203.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2352-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-08-30_Real-Time
Buybacks of Spinning and Offline Supplemental Reserve to be effective
12/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5204.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2353-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-08-30_Price Volatility
Make Whole Payments Enhancement to be effective 12/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5205.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2354-000.
Applicants: BE CA LLC.
Description: Tariff Cancellation: MBR Tariff Cancellation to be
effective 9/30/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5206.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2355-000.
Applicants: Virginia Electric and Power Company, Duke Energy
Progress, LLC, PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: VEPCO and Duke Energy
Process submit amended IA SA No. 3453 to be effective 10/26/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5211.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2356-000.
Applicants: Florida Power Development LLC.
Description: Tariff Cancellation: MBR Tariff cancellation to be
effective 9/30/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5212.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2357-000.
Applicants: Interstate Power and Light Company.
Description: Sec. 205(d) Rate Filing: IPL--Hearland--CIPCO LBA
Agreement to be effective 10/29/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5213.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2358-000.
Applicants: GridLiance High Plains LLC, Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Revisions to Add Oklahoma
Panhandle Facilities for GridLiance High Plains LLC to be effective 11/
1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5216.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2359-000.
[[Page 45440]]
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Second Revised ISA SA No.
2832; Queue #AC1-181 to be effective 8/28/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5218.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2360-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2018-08-30 EIM Agreement
with Balancing Authority of Northern California to be effective 10/30/
2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5222.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2361-000.
Applicants: Enel Green Power Hilltopper Wind, LLC.
Description: Baseline eTariff Filing: MBR Tariff to be effective 9/
1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5223.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2362-000.
Applicants: NTE Ohio, LLC.
Description: Baseline eTariff Filing: Baseline new rates to be
effective 9/1/2018.
Filed Date: 8/30/18.
Accession Number: 20180830-5227.
Comments Due: 5 p.m. ET 9/20/18.
Docket Numbers: ER18-2363-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-08-31_Refiling of
Resource Adequacy Construct Locational Enhancements to be effective 11/
1/2018.
Filed Date: 8/31/18.
Accession Number: 20180831-5128.
Comments Due: 5 p.m. ET 9/21/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-19408 Filed 9-6-18; 8:45 am]
BILLING CODE 6717-01-P