Notice of Anticipated Schedule of Final Order for the Jordan Cove Project: Jordan Cove Energy Project, LP; Pacific Connector Gas Pipeline, LP, 45426 [2018-19404]
Download as PDF
45426
Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Accordingly, we currently anticipate
issuing a final order for the Project no
later than:
Issuance of Final Order—November 29,
2019
If a schedule change becomes
necessary for the final order, an
additional notice will be provided so
that interested parties and government
agencies are kept informed of the
Project’s progress.
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19404 Filed 9–6–18; 8:45 am]
[FR Doc. 2018–19409 Filed 9–6–18; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket Nos. CP17–495–000; CP17–494–
000]
[Docket No. CP17–470–000]
daltland on DSKBBV9HB2PROD with NOTICES
Notice of Anticipated Schedule of Final
Order for the Jordan Cove Project:
Jordan Cove Energy Project, LP;
Pacific Connector Gas Pipeline, LP
On September 21, 2017, Jordan Cove
Energy Project, L.P. filed an application
in Docket No. CP17–495–000, pursuant
to section 3 of the Natural Gas Act
(NGA) and Part 153 of the Commission’s
regulations, for authorization to site,
construct and operate a liquefied natural
gas export terminal and associated
facilities on the bay side of the North
Spit of Coos Bay in unincorporated Coos
County, Oregon. On the same day,
Pacific Connector Gas Pipeline, LP filed
an application in Docket No. CP17–494–
000 requesting a Certificate of Public
Convenience and Necessity, pursuant to
section 7(c) of the NGA and Parts 157
and 284 of the Commission’s
regulations, to construct, operate, and
maintain an approximately 220-milelong natural gas pipeline to be located
in Klamath, Jackson, Douglas, and Coos
Counties, Oregon. The combined
proposed projects, known as the Jordan
Cove Project (Project), would liquefy
and export about 7.8 million metric tons
of natural gas per annum.
In accordance with Title 41 of the
Fixing America’s Surface Transportation
Act, enacted on December 4, 2015,
agencies are to publish completion dates
for all federal environmental reviews
and authorizations. This notice
identifies the Commission’s anticipated
schedule for issuance of the final order
for the Project, which is based on the
anticipated date of issuance of the final
Environmental Impact Statement.
VerDate Sep<11>2014
17:55 Sep 06, 2018
Jkt 244001
Freeport LNG Development, L.P.;
Notice of Schedule for Environmental
Review of the Train 4 Project
On June 29, 2017, Freeport LNG
Development, L.P. (Freeport LNG) filed
an application in Docket No. CP17–470–
000 requesting an Authorization for
siting, construction, and operation of a
liquefied natural gas (LNG) facility
pursuant to Section 3 of the Natural Gas
Act. The proposed project is known as
the Train 4 Project (Project), and would
increase Freeport LNG’s ability to
liquefy and export by 5.1 million metric
tonnes per annum of natural gas at the
existing Freeport LNG terminal.
On July 14, 2017, the Federal Energy
Regulatory Commission (Commission or
FERC) issued its Notice of Application
for the Project. Among other things, that
notice alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s Environmental Assessment (EA)
for the Project. This instant notice
identifies the FERC staff’s planned
schedule for the completion of the EA
for the Project.
Schedule for Environmental Review
Issuance of the EA—November 2, 2018
90-day Federal Authorization Decision
Deadline—January 31, 2019
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
Project Description
The Project would add a fourth
liquefaction unit (Train 4) and
associated infrastructure and utilities to
Freeport LNG’s terminal on Quintana
Island in Brazoria County, Texas. The
Project would also expand the
Pretreatment Plant located about 4 miles
north of the terminal in Freeport, Texas
and includes a new pipeline to connect
various facilities. The Project would be
located adjacent to the facilities
authorized and currently under
construction for the Phase II
Modification Project (Docket No. CP12–
29–000) and Liquefaction Project
(Docket No. CP12–509–000), which
comprises three liquefaction trains and
related facilities. The proposed fourth
liquefaction train would be within the
existing Freeport LNG Terminal site and
the additions to the Pretreatment Plant
would be within the current
construction footprint. The proposed
10.6-mile-long, 42-inch-diameter
pipeline would connect the existing
Stratton Ridge meter station, the
Pretreatment Plant, and the Freeport
LNG Liquefaction Plant.
Background
On August 19, 2015 the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Planned Train 4 Project and Request for
Comments on Environmental Issues
(NOI). A subsequent change to the
Project resulted in the Commission
issuing the Supplemental Notice of
Intent to Prepare an Environmental
Assessment for the Planned Freeport
LNG Train 4 Project and Request for
Comments on Environmental Issues
(Supplemental NOI) on August 31,
2016. The NOI and the Supplemental
NOI were issued during the pre-filing
review of the Project in Docket No.
PF15–25–000 and were sent to affected
landowners; federal, state, and local
government agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers. In response to the NOI
and Supplemental NOI; the Commission
received comments from the Federal
Emergency Management Agency, U.S.
Environmental Protection Agency,
Texas Historical Commission, U.S. Fish
and Wildlife Service, Texas Parks and
Wildlife, Sierra Club, and eight
members of the public. The primary
issues raised by the commentors are
alternative pipeline routes, and impacts
on land use, wetlands, protected
species, visual landscape, noise
environment, air quality, road traffic,
marine traffic, and safety.
E:\FR\FM\07SEN1.SGM
07SEN1
Agencies
[Federal Register Volume 83, Number 174 (Friday, September 7, 2018)]
[Notices]
[Page 45426]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19404]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP17-495-000; CP17-494-000]
Notice of Anticipated Schedule of Final Order for the Jordan Cove
Project: Jordan Cove Energy Project, LP; Pacific Connector Gas
Pipeline, LP
On September 21, 2017, Jordan Cove Energy Project, L.P. filed an
application in Docket No. CP17-495-000, pursuant to section 3 of the
Natural Gas Act (NGA) and Part 153 of the Commission's regulations, for
authorization to site, construct and operate a liquefied natural gas
export terminal and associated facilities on the bay side of the North
Spit of Coos Bay in unincorporated Coos County, Oregon. On the same
day, Pacific Connector Gas Pipeline, LP filed an application in Docket
No. CP17-494-000 requesting a Certificate of Public Convenience and
Necessity, pursuant to section 7(c) of the NGA and Parts 157 and 284 of
the Commission's regulations, to construct, operate, and maintain an
approximately 220-mile-long natural gas pipeline to be located in
Klamath, Jackson, Douglas, and Coos Counties, Oregon. The combined
proposed projects, known as the Jordan Cove Project (Project), would
liquefy and export about 7.8 million metric tons of natural gas per
annum.
In accordance with Title 41 of the Fixing America's Surface
Transportation Act, enacted on December 4, 2015, agencies are to
publish completion dates for all federal environmental reviews and
authorizations. This notice identifies the Commission's anticipated
schedule for issuance of the final order for the Project, which is
based on the anticipated date of issuance of the final Environmental
Impact Statement. Accordingly, we currently anticipate issuing a final
order for the Project no later than:
Issuance of Final Order--November 29, 2019
If a schedule change becomes necessary for the final order, an
additional notice will be provided so that interested parties and
government agencies are kept informed of the Project's progress.
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.