Notice of Revised Schedule for Environmental Review of the Driftwood LNG LLC and Driftwood Pipeline LLC Driftwood LNG Project, 45425 [2018-19395]
Download as PDF
Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices
Louisiana. On the same day,
TransCameron Pipeline, LLC filed an
application in Docket No. CP15–551–
000 requesting a Certificate of Public
Convenience and Necessity pursuant to
section 7(c) of the NGA to construct,
operate, and maintain certain natural
gas pipeline facilities. The combined
proposed projects, known as the
Calcasieu Pass Project (Project), would
liquefy and export about 12 million tons
per annum of LNG.
In accordance with Title 41 of the
Fixing America’s Surface Transportation
Act, enacted on December 4, 2015,
agencies are to publish completion dates
for all federal environmental reviews
and authorizations. This notice
identifies the Commission’s anticipated
schedule for issuance of the final order
for the Project, which is based on the
anticipated date of issuance of the final
Environmental Impact Statement.
Accordingly, we currently anticipate
issuing a final order for the Project no
later than:
Issuance of Final Order—January 22,
2019
If a schedule change becomes
necessary for the final order, an
additional notice will be provided so
that interested parties and government
agencies are kept informed of the
Project’s progress.
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19389 Filed 9–6–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP17–117–000; CP17–118–
000]
daltland on DSKBBV9HB2PROD with NOTICES
Notice of Revised Schedule for
Environmental Review of the Driftwood
LNG LLC and Driftwood Pipeline LLC
Driftwood LNG Project
This notice identifies the Federal
Energy Regulatory Commission (FERC)
staff’s revised schedule for the
completion of the environmental impact
statement (EIS) for Driftwood LNG
LLC’s liquefied natural gas facility and
for Driftwood Pipeline LLC’s pipeline
facilities, collectively referred to as the
Driftwood LNG Project. The first notice
of schedule, issued on December 22,
2017, identified October 12, 2018 as the
final EIS issuance date. Staff has revised
the schedule for issuance of the final
EIS, based on an issuance of the draft
EIS in September 2018. The forecasted
VerDate Sep<11>2014
17:55 Sep 06, 2018
Jkt 244001
schedule for both the draft and final EIS
is based upon Driftwood LNG LLC and
Driftwood Pipeline LLC providing
complete and timely responses to any
future data requests. In addition, the
schedule assumes that the cooperating
agencies will provide input on their
areas of responsibility on a timely basis.
Schedule for Environmental Review
Issuance of Notice of Availability of the
final EIS—January 18, 2019
90-day Federal Authorization Decision
Deadline—April 18, 2019
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
eLibrary link, select General Search
from the eLibrary menu, enter the
selected date range and Docket Number
excluding the last three digits (i.e.,
CP17–117 or CP17–118), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19395 Filed 9–6–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
45425
Docket Numbers: ER18–2364–000.
Applicants: ISO New England Inc.
Description: Compliance filing: ISO–
NE Filing to Establish a Fuel Security
Reliability Standard; EL18–182–000 to
be effective 10/30/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5137.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2365–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
697 4th Revised—NITSA with the City
of Great Falls to be effective 11/1/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5148.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2366–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2018–08–31 Reliability Coordinator
Services Amendment to be effective
11/15/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5165.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2367–000.
Applicants: Duke Energy Progress,
LLC, Duke Energy Carolinas, LLC.
Description: § 205(d) Rate Filing:
DEC–DEP Revisions to Joint OATT
Formula Transmission Rates (M&S) to
be effective 11/1/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5179.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2368–000.
Applicants: Duke Energy Florida,
LLC.
Description: § 205(d) Rate Filing: DEF
Revisions to Joint OATT Formula
Transmission Rates (M&S and Storm
Damage) to be effective 11/1/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5181.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2369–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2018–08–31 Interim Reliability MustRun Agreement to be effective 9/1/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5189.
Comments Due: 5 p.m. ET 9/21/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
E:\FR\FM\07SEN1.SGM
07SEN1
Agencies
[Federal Register Volume 83, Number 174 (Friday, September 7, 2018)]
[Notices]
[Page 45425]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19395]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP17-117-000; CP17-118-000]
Notice of Revised Schedule for Environmental Review of the
Driftwood LNG LLC and Driftwood Pipeline LLC Driftwood LNG Project
This notice identifies the Federal Energy Regulatory Commission
(FERC) staff's revised schedule for the completion of the environmental
impact statement (EIS) for Driftwood LNG LLC's liquefied natural gas
facility and for Driftwood Pipeline LLC's pipeline facilities,
collectively referred to as the Driftwood LNG Project. The first notice
of schedule, issued on December 22, 2017, identified October 12, 2018
as the final EIS issuance date. Staff has revised the schedule for
issuance of the final EIS, based on an issuance of the draft EIS in
September 2018. The forecasted schedule for both the draft and final
EIS is based upon Driftwood LNG LLC and Driftwood Pipeline LLC
providing complete and timely responses to any future data requests. In
addition, the schedule assumes that the cooperating agencies will
provide input on their areas of responsibility on a timely basis.
Schedule for Environmental Review
Issuance of Notice of Availability of the final EIS--January 18, 2019
90-day Federal Authorization Decision Deadline--April 18, 2019
If a schedule change becomes necessary, an additional notice will
be provided so that the relevant agencies are kept informed of the
project's progress.
Additional Information
In order to receive notification of the issuance of the EIS and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and Docket
Number excluding the last three digits (i.e., CP17-117 or CP17-118),
and follow the instructions. For assistance with access to eLibrary,
the helpline can be reached at (866) 208-3676, TTY (202) 502-8659, or
at [email protected]. The eLibrary link on the FERC website
also provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: August 31, 2018.