Notice of Revised Schedule for Environmental Review of the Driftwood LNG LLC and Driftwood Pipeline LLC Driftwood LNG Project, 45425 [2018-19395]

Download as PDF Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices Louisiana. On the same day, TransCameron Pipeline, LLC filed an application in Docket No. CP15–551– 000 requesting a Certificate of Public Convenience and Necessity pursuant to section 7(c) of the NGA to construct, operate, and maintain certain natural gas pipeline facilities. The combined proposed projects, known as the Calcasieu Pass Project (Project), would liquefy and export about 12 million tons per annum of LNG. In accordance with Title 41 of the Fixing America’s Surface Transportation Act, enacted on December 4, 2015, agencies are to publish completion dates for all federal environmental reviews and authorizations. This notice identifies the Commission’s anticipated schedule for issuance of the final order for the Project, which is based on the anticipated date of issuance of the final Environmental Impact Statement. Accordingly, we currently anticipate issuing a final order for the Project no later than: Issuance of Final Order—January 22, 2019 If a schedule change becomes necessary for the final order, an additional notice will be provided so that interested parties and government agencies are kept informed of the Project’s progress. Dated: August 31, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–19389 Filed 9–6–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP17–117–000; CP17–118– 000] daltland on DSKBBV9HB2PROD with NOTICES Notice of Revised Schedule for Environmental Review of the Driftwood LNG LLC and Driftwood Pipeline LLC Driftwood LNG Project This notice identifies the Federal Energy Regulatory Commission (FERC) staff’s revised schedule for the completion of the environmental impact statement (EIS) for Driftwood LNG LLC’s liquefied natural gas facility and for Driftwood Pipeline LLC’s pipeline facilities, collectively referred to as the Driftwood LNG Project. The first notice of schedule, issued on December 22, 2017, identified October 12, 2018 as the final EIS issuance date. Staff has revised the schedule for issuance of the final EIS, based on an issuance of the draft EIS in September 2018. The forecasted VerDate Sep<11>2014 17:55 Sep 06, 2018 Jkt 244001 schedule for both the draft and final EIS is based upon Driftwood LNG LLC and Driftwood Pipeline LLC providing complete and timely responses to any future data requests. In addition, the schedule assumes that the cooperating agencies will provide input on their areas of responsibility on a timely basis. Schedule for Environmental Review Issuance of Notice of Availability of the final EIS—January 18, 2019 90-day Federal Authorization Decision Deadline—April 18, 2019 If a schedule change becomes necessary, an additional notice will be provided so that the relevant agencies are kept informed of the project’s progress. Additional Information In order to receive notification of the issuance of the EIS and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC website (www.ferc.gov). Using the eLibrary link, select General Search from the eLibrary menu, enter the selected date range and Docket Number excluding the last three digits (i.e., CP17–117 or CP17–118), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: August 31, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–19395 Filed 9–6–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 45425 Docket Numbers: ER18–2364–000. Applicants: ISO New England Inc. Description: Compliance filing: ISO– NE Filing to Establish a Fuel Security Reliability Standard; EL18–182–000 to be effective 10/30/2018. Filed Date: 8/31/18. Accession Number: 20180831–5137. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2365–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: SA 697 4th Revised—NITSA with the City of Great Falls to be effective 11/1/2018. Filed Date: 8/31/18. Accession Number: 20180831–5148. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2366–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2018–08–31 Reliability Coordinator Services Amendment to be effective 11/15/2018. Filed Date: 8/31/18. Accession Number: 20180831–5165. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2367–000. Applicants: Duke Energy Progress, LLC, Duke Energy Carolinas, LLC. Description: § 205(d) Rate Filing: DEC–DEP Revisions to Joint OATT Formula Transmission Rates (M&S) to be effective 11/1/2018. Filed Date: 8/31/18. Accession Number: 20180831–5179. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2368–000. Applicants: Duke Energy Florida, LLC. Description: § 205(d) Rate Filing: DEF Revisions to Joint OATT Formula Transmission Rates (M&S and Storm Damage) to be effective 11/1/2018. Filed Date: 8/31/18. Accession Number: 20180831–5181. Comments Due: 5 p.m. ET 9/21/18. Docket Numbers: ER18–2369–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2018–08–31 Interim Reliability MustRun Agreement to be effective 9/1/2018. Filed Date: 8/31/18. Accession Number: 20180831–5189. Comments Due: 5 p.m. ET 9/21/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern E:\FR\FM\07SEN1.SGM 07SEN1

Agencies

[Federal Register Volume 83, Number 174 (Friday, September 7, 2018)]
[Notices]
[Page 45425]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19395]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP17-117-000; CP17-118-000]


Notice of Revised Schedule for Environmental Review of the 
Driftwood LNG LLC and Driftwood Pipeline LLC Driftwood LNG Project

    This notice identifies the Federal Energy Regulatory Commission 
(FERC) staff's revised schedule for the completion of the environmental 
impact statement (EIS) for Driftwood LNG LLC's liquefied natural gas 
facility and for Driftwood Pipeline LLC's pipeline facilities, 
collectively referred to as the Driftwood LNG Project. The first notice 
of schedule, issued on December 22, 2017, identified October 12, 2018 
as the final EIS issuance date. Staff has revised the schedule for 
issuance of the final EIS, based on an issuance of the draft EIS in 
September 2018. The forecasted schedule for both the draft and final 
EIS is based upon Driftwood LNG LLC and Driftwood Pipeline LLC 
providing complete and timely responses to any future data requests. In 
addition, the schedule assumes that the cooperating agencies will 
provide input on their areas of responsibility on a timely basis.

Schedule for Environmental Review

Issuance of Notice of Availability of the final EIS--January 18, 2019
90-day Federal Authorization Decision Deadline--April 18, 2019

    If a schedule change becomes necessary, an additional notice will 
be provided so that the relevant agencies are kept informed of the 
project's progress.

Additional Information

    In order to receive notification of the issuance of the EIS and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC website (www.ferc.gov). Using the eLibrary link, select General 
Search from the eLibrary menu, enter the selected date range and Docket 
Number excluding the last three digits (i.e., CP17-117 or CP17-118), 
and follow the instructions. For assistance with access to eLibrary, 
the helpline can be reached at (866) 208-3676, TTY (202) 502-8659, or 
at [email protected]. The eLibrary link on the FERC website 
also provides access to the texts of formal documents issued by the 
Commission, such as orders, notices, and rule makings.

    Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-19395 Filed 9-6-18; 8:45 am]
 BILLING CODE 6717-01-P