Notice of Anticipated Schedule of Final Order for the Calcasieu Pass Project: Venture Global Calcasieu Pass, LLC; TransCameron Pipeline, LLC, 45424-45425 [2018-19389]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
45424
Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket numbers P–2348–038,
P–2373–011, and P–2446–050.
j. Description of Proceeding: Midwest
Hydro, LLC, licensee for the Beloit and
Rockton projects, and STS Hydropower,
Ltd., licensee for the Dixon Project
request that the Commission extend the
term of the licenses to synchronize
license expiration with the nearby
Central Project No. 2347, also located on
the Rock River, in Rock County
Wisconsin and licensed to Midwest
Hydro, LLC. The license for the Central
Project expires on August 31, 2024 and
the licensees request eight-month
extensions for the Dixon and Rockton
projects, currently set to expire on
December 31, 2023, and a three-month
extension of the license term for the
Beloit Project, which expires on May 31,
2024. The licensees requests the license
term extensions to coordinate and
streamline relicensing efforts for the
four projects and perform a more
comprehensive analysis of the resources
involved.
k. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE, Washington, DC
20426. The filing may also be viewed on
the Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the Docket number (P–2348–038,
P–2373–011, or P–2446–050) excluding
the last three digits in the docket
number field to access the notice. You
may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
VerDate Sep<11>2014
17:55 Sep 06, 2018
Jkt 244001
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title COMMENTS,
PROTEST, or MOTION TO INTERVENE
as applicable; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the license term
extension requests. Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Commission’s regulations, requesting
authorization to construct and operate
the Gulf LNG Liquefaction Project
(Project) at Gulf Energy’s liquefied
natural gas terminal located near
Pascagoula, Jackson County,
Mississippi. The Project consists of new
natural gas liquefaction and export
facilities. Additionally, within the same
application, Gulf Pipeline requested,
pursuant to section 7(c) of the NGA and
Part 157 of the Commission’s
regulations, to make modifications to
the terminal’s sendout pipeline to allow
for bi-directional flow. These facilities
will enable Gulf Liquefaction to liquefy
and export about 11 million metric tons
of LNG per year.
In accordance with Title 41 of the
Fixing America’s Surface Transportation
Act, enacted on December 4, 2015,
agencies are to publish completion dates
for all federal environmental reviews
and authorizations. This notice
identifies the Commission’s anticipated
schedule for issuance of the final order
for the Project, which is based on the
anticipated date of issuance of the final
Environmental Impact Statement.
Accordingly, we currently anticipate
issuing a final order for the Project no
later than:
Issuance of Final Order—July 16, 2019
If a schedule change becomes
necessary for the final order, an
additional notice will be provided so
that interested parties and government
agencies are kept informed of the
Project’s progress.
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19387 Filed 9–6–18; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2018–19407 Filed 9–6–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket Nos. CP15–550–000; CP15–551–
001]
[Docket No. CP15–521–000]
Notice of Anticipated Schedule of Final
Order for the Calcasieu Pass Project:
Venture Global Calcasieu Pass, LLC;
TransCameron Pipeline, LLC
Gulf LNG Liquefaction Company, LLC,
Gulf LNG Energy, LLC, Gulf LNG
Pipeline, LLC; Notice of Anticipated
Schedule of Final Order for the Gulf
LNG Liquefaction Project
On June 19, 2015, Gulf LNG
Liquefaction Company, LLC (Gulf
Liquefaction), Gulf LNG Energy, LLC
(Gulf Energy), and Gulf LNG Pipeline
LLC (Gulf Pipeline) filed an application
pursuant to section 3(a) of the Natural
Gas Act (NGA) and Part 153 of the
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
On September 4, 2015, Venture Global
Calcasieu Pass, LLC filed an application
in Docket No. CP15–550–000, pursuant
to section 3 of the Natural Gas Act
(NGA) and Part 153 of the Commission’s
regulations, for authorization to site,
construct, and operate a new liquefied
natural gas (LNG) export terminal and
associated facilities along the Calcasieu
Ship Channel in Cameron Parish,
E:\FR\FM\07SEN1.SGM
07SEN1
Federal Register / Vol. 83, No. 174 / Friday, September 7, 2018 / Notices
Louisiana. On the same day,
TransCameron Pipeline, LLC filed an
application in Docket No. CP15–551–
000 requesting a Certificate of Public
Convenience and Necessity pursuant to
section 7(c) of the NGA to construct,
operate, and maintain certain natural
gas pipeline facilities. The combined
proposed projects, known as the
Calcasieu Pass Project (Project), would
liquefy and export about 12 million tons
per annum of LNG.
In accordance with Title 41 of the
Fixing America’s Surface Transportation
Act, enacted on December 4, 2015,
agencies are to publish completion dates
for all federal environmental reviews
and authorizations. This notice
identifies the Commission’s anticipated
schedule for issuance of the final order
for the Project, which is based on the
anticipated date of issuance of the final
Environmental Impact Statement.
Accordingly, we currently anticipate
issuing a final order for the Project no
later than:
Issuance of Final Order—January 22,
2019
If a schedule change becomes
necessary for the final order, an
additional notice will be provided so
that interested parties and government
agencies are kept informed of the
Project’s progress.
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19389 Filed 9–6–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP17–117–000; CP17–118–
000]
daltland on DSKBBV9HB2PROD with NOTICES
Notice of Revised Schedule for
Environmental Review of the Driftwood
LNG LLC and Driftwood Pipeline LLC
Driftwood LNG Project
This notice identifies the Federal
Energy Regulatory Commission (FERC)
staff’s revised schedule for the
completion of the environmental impact
statement (EIS) for Driftwood LNG
LLC’s liquefied natural gas facility and
for Driftwood Pipeline LLC’s pipeline
facilities, collectively referred to as the
Driftwood LNG Project. The first notice
of schedule, issued on December 22,
2017, identified October 12, 2018 as the
final EIS issuance date. Staff has revised
the schedule for issuance of the final
EIS, based on an issuance of the draft
EIS in September 2018. The forecasted
VerDate Sep<11>2014
17:55 Sep 06, 2018
Jkt 244001
schedule for both the draft and final EIS
is based upon Driftwood LNG LLC and
Driftwood Pipeline LLC providing
complete and timely responses to any
future data requests. In addition, the
schedule assumes that the cooperating
agencies will provide input on their
areas of responsibility on a timely basis.
Schedule for Environmental Review
Issuance of Notice of Availability of the
final EIS—January 18, 2019
90-day Federal Authorization Decision
Deadline—April 18, 2019
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
eLibrary link, select General Search
from the eLibrary menu, enter the
selected date range and Docket Number
excluding the last three digits (i.e.,
CP17–117 or CP17–118), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19395 Filed 9–6–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
45425
Docket Numbers: ER18–2364–000.
Applicants: ISO New England Inc.
Description: Compliance filing: ISO–
NE Filing to Establish a Fuel Security
Reliability Standard; EL18–182–000 to
be effective 10/30/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5137.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2365–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
697 4th Revised—NITSA with the City
of Great Falls to be effective 11/1/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5148.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2366–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2018–08–31 Reliability Coordinator
Services Amendment to be effective
11/15/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5165.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2367–000.
Applicants: Duke Energy Progress,
LLC, Duke Energy Carolinas, LLC.
Description: § 205(d) Rate Filing:
DEC–DEP Revisions to Joint OATT
Formula Transmission Rates (M&S) to
be effective 11/1/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5179.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2368–000.
Applicants: Duke Energy Florida,
LLC.
Description: § 205(d) Rate Filing: DEF
Revisions to Joint OATT Formula
Transmission Rates (M&S and Storm
Damage) to be effective 11/1/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5181.
Comments Due: 5 p.m. ET 9/21/18.
Docket Numbers: ER18–2369–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2018–08–31 Interim Reliability MustRun Agreement to be effective 9/1/2018.
Filed Date: 8/31/18.
Accession Number: 20180831–5189.
Comments Due: 5 p.m. ET 9/21/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
E:\FR\FM\07SEN1.SGM
07SEN1
Agencies
[Federal Register Volume 83, Number 174 (Friday, September 7, 2018)]
[Notices]
[Pages 45424-45425]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19389]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP15-550-000; CP15-551-001]
Notice of Anticipated Schedule of Final Order for the Calcasieu
Pass Project: Venture Global Calcasieu Pass, LLC; TransCameron
Pipeline, LLC
On September 4, 2015, Venture Global Calcasieu Pass, LLC filed an
application in Docket No. CP15-550-000, pursuant to section 3 of the
Natural Gas Act (NGA) and Part 153 of the Commission's regulations, for
authorization to site, construct, and operate a new liquefied natural
gas (LNG) export terminal and associated facilities along the Calcasieu
Ship Channel in Cameron Parish,
[[Page 45425]]
Louisiana. On the same day, TransCameron Pipeline, LLC filed an
application in Docket No. CP15-551-000 requesting a Certificate of
Public Convenience and Necessity pursuant to section 7(c) of the NGA to
construct, operate, and maintain certain natural gas pipeline
facilities. The combined proposed projects, known as the Calcasieu Pass
Project (Project), would liquefy and export about 12 million tons per
annum of LNG.
In accordance with Title 41 of the Fixing America's Surface
Transportation Act, enacted on December 4, 2015, agencies are to
publish completion dates for all federal environmental reviews and
authorizations. This notice identifies the Commission's anticipated
schedule for issuance of the final order for the Project, which is
based on the anticipated date of issuance of the final Environmental
Impact Statement. Accordingly, we currently anticipate issuing a final
order for the Project no later than:
Issuance of Final Order--January 22, 2019
If a schedule change becomes necessary for the final order, an
additional notice will be provided so that interested parties and
government agencies are kept informed of the Project's progress.
Dated: August 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-19389 Filed 9-6-18; 8:45 am]
BILLING CODE 6717-01-P