Notice of Availability of the Environmental Assessment for the Proposed Columbia Gas Transmission, LLC Line 8000 Replacement Project, 45233-45234 [2018-19243]

Download as PDF Federal Register / Vol. 83, No. 173 / Thursday, September 6, 2018 / Notices assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Finally, public sessions or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: August 29, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–19236 Filed 9–5–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–2335–000] daltland on DSKBBV9HB2PROD with NOTICES Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization: Josco Energy USA, LLC This is a supplemental notice in the above-referenced proceeding Josco Energy USA, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 19, 2018. VerDate Sep<11>2014 16:56 Sep 05, 2018 Jkt 244001 The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 30, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–19269 Filed 9–5–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–13–000] Notice of Availability of the Environmental Assessment for the Proposed Columbia Gas Transmission, LLC Line 8000 Replacement Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Line 8000 Replacement Project (Project), proposed by Columbia Gas Transmission, LLC (Columbia) in the above-referenced docket. Columbia requests authorization to modernize and upgrade Columbia’s Line 8000 pipeline system by replacing and abandoning existing pipeline and constructing new pipeline and appurtenant facilities in Mineral County, West Virginia and Allegany County, Maryland. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 45233 The EA assesses the potential environmental effects of the construction and operation of the Project in accordance with the requirements of the National Environmental Policy Act (NEPA). The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment. The proposed Line 8000 Project would consist of: • Replacement of a total of approximately 13.25 miles of existing 12-inch-diameter bare steel pipeline, with approximately 13.54 miles of new, coated 12-inch-diameter natural gas transmission pipeline in five sections and four modification points along Line 8000 and Lateral Line 8006; • Replacement of a total of approximately 0.54 miles of existing 4inch-diameter bare steel pipeline, with approximately 0.67 miles of new coated 4-inch-diameter natural gas transmission pipeline along two laterals (Lateral Lines 8225 and 8244); • Installation of two new pig 1 launcher and receiver sites and four new mainline valves associated with pipeline facilities; • Modifications/abandonment of three existing mainline valves and three existing side tap valve sites and modification of tie-ins at two regulator stations; and • Abandonment of 13 active residential taps and 109 inactive taps. The FERC staff mailed copies of the EA to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the project area. In addition, the EA is available for public viewing on the FERC’s website (www.ferc.gov) using the eLibrary link. A limited number of copies of the EA are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street NE, Room 2A, Washington, DC 20426, (202) 502–8371. Any person wishing to comment on the EA may do so. Your comments should focus on the EA’s disclosure and discussion of potential environmental effects, reasonable alternatives, and 1 A pig is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning the pipeline, conducting internal inspections, or other purposes. E:\FR\FM\06SEN1.SGM 06SEN1 daltland on DSKBBV9HB2PROD with NOTICES 45234 Federal Register / Vol. 83, No. 173 / Thursday, September 6, 2018 / Notices measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that the Commission has the opportunity to consider your comments prior to making its decision on this project, it is important that we receive your comments in Washington, DC on or before 5:00 p.m. Eastern Time on September 28, 2018. For your convenience, there are three methods you can use to file your comments to the Commission. In all instances, please reference the project docket number (CP18–13–000) with your submission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. (1) You can file your comments electronically using the eComment feature on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. This is an easy method for submitting brief, text-only comments on a project; (2) You can also file your comments electronically using the eFiling feature on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on eRegister. You must select the type of filing you are making. If you are filing a comment on a particular project, please select Comment on a Filing; or (3) You can file a paper copy of your comments by mailing them to the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission’s Rules of Practice and Procedures (18 CFR 385.214). Only intervenors have the right to seek rehearing or judicial review of the Commission’s decision. The Commission may grant affected landowners and others with environmental concerns intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which no other party can adequately represent. Simply filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Additional information about the project is available from the VerDate Sep<11>2014 16:56 Sep 05, 2018 Jkt 244001 Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on General Search, and enter the docket number in the Docket Number field, excluding the last three digits (i.e., CP18–13). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Dated: August 29, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–19243 Filed 9–5–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–2327–000] Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization: Riverhead Solar Farm, LLC This is a supplemental notice in the above-referenced proceeding Riverhead Solar Farm, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 19, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 30, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–19267 Filed 9–5–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 190–105] Notice of Technical Conference and Environmental Site Review: Moon Lake Electric Association, Inc. a. Date and Time: The technical conference will be on Wednesday, September 26, 2018, beginning at 9:00 a.m. (MDT) and concluding no later than 5:00 p.m. (MDT). b. Location: Springhill Suites Marriott, 1205 West Highway 40, Vernal, Utah 84078. For directions, please contact the Springhill Suites Marriott at (435) 781–9000. E:\FR\FM\06SEN1.SGM 06SEN1

Agencies

[Federal Register Volume 83, Number 173 (Thursday, September 6, 2018)]
[Notices]
[Pages 45233-45234]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19243]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-13-000]


Notice of Availability of the Environmental Assessment for the 
Proposed Columbia Gas Transmission, LLC Line 8000 Replacement Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the Line 
8000 Replacement Project (Project), proposed by Columbia Gas 
Transmission, LLC (Columbia) in the above-referenced docket. Columbia 
requests authorization to modernize and upgrade Columbia's Line 8000 
pipeline system by replacing and abandoning existing pipeline and 
constructing new pipeline and appurtenant facilities in Mineral County, 
West Virginia and Allegany County, Maryland.
    The EA assesses the potential environmental effects of the 
construction and operation of the Project in accordance with the 
requirements of the National Environmental Policy Act (NEPA). The FERC 
staff concludes that approval of the proposed project, with appropriate 
mitigating measures, would not constitute a major federal action 
significantly affecting the quality of the human environment.
    The proposed Line 8000 Project would consist of:
     Replacement of a total of approximately 13.25 miles of 
existing 12-inch-diameter bare steel pipeline, with approximately 13.54 
miles of new, coated 12-inch-diameter natural gas transmission pipeline 
in five sections and four modification points along Line 8000 and 
Lateral Line 8006;
     Replacement of a total of approximately 0.54 miles of 
existing 4-inch-diameter bare steel pipeline, with approximately 0.67 
miles of new coated 4-inch-diameter natural gas transmission pipeline 
along two laterals (Lateral Lines 8225 and 8244);
     Installation of two new pig \1\ launcher and receiver 
sites and four new mainline valves associated with pipeline facilities;
---------------------------------------------------------------------------

    \1\ A pig is a tool that the pipeline company inserts into and 
pushes through the pipeline for cleaning the pipeline, conducting 
internal inspections, or other purposes.
---------------------------------------------------------------------------

     Modifications/abandonment of three existing mainline 
valves and three existing side tap valve sites and modification of tie-
ins at two regulator stations; and
     Abandonment of 13 active residential taps and 109 inactive 
taps.
    The FERC staff mailed copies of the EA to federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners and other interested individuals and 
groups; and newspapers and libraries in the project area. In addition, 
the EA is available for public viewing on the FERC's website 
(www.ferc.gov) using the eLibrary link. A limited number of copies of 
the EA are available for distribution and public inspection at: Federal 
Energy Regulatory Commission, Public Reference Room, 888 First Street 
NE, Room 2A, Washington, DC 20426, (202) 502-8371.
    Any person wishing to comment on the EA may do so. Your comments 
should focus on the EA's disclosure and discussion of potential 
environmental effects, reasonable alternatives, and

[[Page 45234]]

measures to avoid or lessen environmental impacts. The more specific 
your comments, the more useful they will be. To ensure that the 
Commission has the opportunity to consider your comments prior to 
making its decision on this project, it is important that we receive 
your comments in Washington, DC on or before 5:00 p.m. Eastern Time on 
September 28, 2018.
    For your convenience, there are three methods you can use to file 
your comments to the Commission. In all instances, please reference the 
project docket number (CP18-13-000) with your submission. The 
Commission encourages electronic filing of comments and has staff 
available to assist you at (866) 208-3676 or 
[email protected].
    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can also file your comments electronically using the 
eFiling feature on the Commission's website (www.ferc.gov) under the 
link to Documents and Filings. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on eRegister. You must select the type of filing you are making. If you 
are filing a comment on a particular project, please select Comment on 
a Filing; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426.
    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (18 CFR 385.214). Only intervenors have the 
right to seek rehearing or judicial review of the Commission's 
decision. The Commission may grant affected landowners and others with 
environmental concerns intervenor status upon showing good cause by 
stating that they have a clear and direct interest in this proceeding 
which no other party can adequately represent. Simply filing 
environmental comments will not give you intervenor status, but you do 
not need intervenor status to have your comments considered.
    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on General Search, and enter the docket number in 
the Docket Number field, excluding the last three digits (i.e., CP18-
13). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: August 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-19243 Filed 9-5-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.