Notice of Availability of the Environmental Assessment for the Proposed Columbia Gas Transmission, LLC Line 8000 Replacement Project, 45233-45234 [2018-19243]
Download as PDF
Federal Register / Vol. 83, No. 173 / Thursday, September 6, 2018 / Notices
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public sessions or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: August 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–19236 Filed 9–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–2335–000]
daltland on DSKBBV9HB2PROD with NOTICES
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization: Josco Energy USA, LLC
This is a supplemental notice in the
above-referenced proceeding Josco
Energy USA, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
19, 2018.
VerDate Sep<11>2014
16:56 Sep 05, 2018
Jkt 244001
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 30, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19269 Filed 9–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–13–000]
Notice of Availability of the
Environmental Assessment for the
Proposed Columbia Gas Transmission,
LLC Line 8000 Replacement Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Line 8000 Replacement Project (Project),
proposed by Columbia Gas
Transmission, LLC (Columbia) in the
above-referenced docket. Columbia
requests authorization to modernize and
upgrade Columbia’s Line 8000 pipeline
system by replacing and abandoning
existing pipeline and constructing new
pipeline and appurtenant facilities in
Mineral County, West Virginia and
Allegany County, Maryland.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
45233
The EA assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The proposed Line 8000 Project
would consist of:
• Replacement of a total of
approximately 13.25 miles of existing
12-inch-diameter bare steel pipeline,
with approximately 13.54 miles of new,
coated 12-inch-diameter natural gas
transmission pipeline in five sections
and four modification points along Line
8000 and Lateral Line 8006;
• Replacement of a total of
approximately 0.54 miles of existing 4inch-diameter bare steel pipeline, with
approximately 0.67 miles of new coated
4-inch-diameter natural gas
transmission pipeline along two laterals
(Lateral Lines 8225 and 8244);
• Installation of two new pig 1
launcher and receiver sites and four
new mainline valves associated with
pipeline facilities;
• Modifications/abandonment of
three existing mainline valves and three
existing side tap valve sites and
modification of tie-ins at two regulator
stations; and
• Abandonment of 13 active
residential taps and 109 inactive taps.
The FERC staff mailed copies of the
EA to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
project area. In addition, the EA is
available for public viewing on the
FERC’s website (www.ferc.gov) using the
eLibrary link. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference Room, 888 First Street
NE, Room 2A, Washington, DC 20426,
(202) 502–8371.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the EA’s disclosure and
discussion of potential environmental
effects, reasonable alternatives, and
1 A pig is a tool that the pipeline company inserts
into and pushes through the pipeline for cleaning
the pipeline, conducting internal inspections, or
other purposes.
E:\FR\FM\06SEN1.SGM
06SEN1
daltland on DSKBBV9HB2PROD with NOTICES
45234
Federal Register / Vol. 83, No. 173 / Thursday, September 6, 2018 / Notices
measures to avoid or lessen
environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this project, it is
important that we receive your
comments in Washington, DC on or
before 5:00 p.m. Eastern Time on
September 28, 2018.
For your convenience, there are three
methods you can use to file your
comments to the Commission. In all
instances, please reference the project
docket number (CP18–13–000) with
your submission. The Commission
encourages electronic filing of
comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on eRegister. You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select Comment on a
Filing; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214). Only
intervenors have the right to seek
rehearing or judicial review of the
Commission’s decision. The
Commission may grant affected
landowners and others with
environmental concerns intervenor
status upon showing good cause by
stating that they have a clear and direct
interest in this proceeding which no
other party can adequately represent.
Simply filing environmental comments
will not give you intervenor status, but
you do not need intervenor status to
have your comments considered.
Additional information about the
project is available from the
VerDate Sep<11>2014
16:56 Sep 05, 2018
Jkt 244001
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on General Search, and enter the
docket number in the Docket Number
field, excluding the last three digits (i.e.,
CP18–13). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Dated: August 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–19243 Filed 9–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–2327–000]
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization: Riverhead Solar Farm,
LLC
This is a supplemental notice in the
above-referenced proceeding Riverhead
Solar Farm, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
19, 2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 30, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19267 Filed 9–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 190–105]
Notice of Technical Conference and
Environmental Site Review: Moon Lake
Electric Association, Inc.
a. Date and Time: The technical
conference will be on Wednesday,
September 26, 2018, beginning at 9:00
a.m. (MDT) and concluding no later
than 5:00 p.m. (MDT).
b. Location: Springhill Suites
Marriott, 1205 West Highway 40,
Vernal, Utah 84078. For directions,
please contact the Springhill Suites
Marriott at (435) 781–9000.
E:\FR\FM\06SEN1.SGM
06SEN1
Agencies
[Federal Register Volume 83, Number 173 (Thursday, September 6, 2018)]
[Notices]
[Pages 45233-45234]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19243]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-13-000]
Notice of Availability of the Environmental Assessment for the
Proposed Columbia Gas Transmission, LLC Line 8000 Replacement Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) for the Line
8000 Replacement Project (Project), proposed by Columbia Gas
Transmission, LLC (Columbia) in the above-referenced docket. Columbia
requests authorization to modernize and upgrade Columbia's Line 8000
pipeline system by replacing and abandoning existing pipeline and
constructing new pipeline and appurtenant facilities in Mineral County,
West Virginia and Allegany County, Maryland.
The EA assesses the potential environmental effects of the
construction and operation of the Project in accordance with the
requirements of the National Environmental Policy Act (NEPA). The FERC
staff concludes that approval of the proposed project, with appropriate
mitigating measures, would not constitute a major federal action
significantly affecting the quality of the human environment.
The proposed Line 8000 Project would consist of:
Replacement of a total of approximately 13.25 miles of
existing 12-inch-diameter bare steel pipeline, with approximately 13.54
miles of new, coated 12-inch-diameter natural gas transmission pipeline
in five sections and four modification points along Line 8000 and
Lateral Line 8006;
Replacement of a total of approximately 0.54 miles of
existing 4-inch-diameter bare steel pipeline, with approximately 0.67
miles of new coated 4-inch-diameter natural gas transmission pipeline
along two laterals (Lateral Lines 8225 and 8244);
Installation of two new pig \1\ launcher and receiver
sites and four new mainline valves associated with pipeline facilities;
---------------------------------------------------------------------------
\1\ A pig is a tool that the pipeline company inserts into and
pushes through the pipeline for cleaning the pipeline, conducting
internal inspections, or other purposes.
---------------------------------------------------------------------------
Modifications/abandonment of three existing mainline
valves and three existing side tap valve sites and modification of tie-
ins at two regulator stations; and
Abandonment of 13 active residential taps and 109 inactive
taps.
The FERC staff mailed copies of the EA to federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American tribes;
potentially affected landowners and other interested individuals and
groups; and newspapers and libraries in the project area. In addition,
the EA is available for public viewing on the FERC's website
(www.ferc.gov) using the eLibrary link. A limited number of copies of
the EA are available for distribution and public inspection at: Federal
Energy Regulatory Commission, Public Reference Room, 888 First Street
NE, Room 2A, Washington, DC 20426, (202) 502-8371.
Any person wishing to comment on the EA may do so. Your comments
should focus on the EA's disclosure and discussion of potential
environmental effects, reasonable alternatives, and
[[Page 45234]]
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that the
Commission has the opportunity to consider your comments prior to
making its decision on this project, it is important that we receive
your comments in Washington, DC on or before 5:00 p.m. Eastern Time on
September 28, 2018.
For your convenience, there are three methods you can use to file
your comments to the Commission. In all instances, please reference the
project docket number (CP18-13-000) with your submission. The
Commission encourages electronic filing of comments and has staff
available to assist you at (866) 208-3676 or
[email protected].
(1) You can file your comments electronically using the eComment
feature on the Commission's website (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for submitting brief,
text-only comments on a project;
(2) You can also file your comments electronically using the
eFiling feature on the Commission's website (www.ferc.gov) under the
link to Documents and Filings. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on eRegister. You must select the type of filing you are making. If you
are filing a comment on a particular project, please select Comment on
a Filing; or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426.
Any person seeking to become a party to the proceeding must file a
motion to intervene pursuant to Rule 214 of the Commission's Rules of
Practice and Procedures (18 CFR 385.214). Only intervenors have the
right to seek rehearing or judicial review of the Commission's
decision. The Commission may grant affected landowners and others with
environmental concerns intervenor status upon showing good cause by
stating that they have a clear and direct interest in this proceeding
which no other party can adequately represent. Simply filing
environmental comments will not give you intervenor status, but you do
not need intervenor status to have your comments considered.
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on General Search, and enter the docket number in
the Docket Number field, excluding the last three digits (i.e., CP18-
13). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Dated: August 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-19243 Filed 9-5-18; 8:45 am]
BILLING CODE 6717-01-P