Notice of Availability of Draft Environmental Assessment: New York Power Authority, 45228-45229 [2018-19242]
Download as PDF
45228
Federal Register / Vol. 83, No. 173 / Thursday, September 6, 2018 / Notices
of five minutes to present their
comments.
Minutes: Minutes will be available by
writing or calling Menice Santistevan at
the address or phone number listed
above. Minutes and other Board
documents are on the internet at:
https://energy.gov/em/nnmcab/meetingmaterials.
Signed in Washington, DC, on August 31,
2018.
Latanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2018–19287 Filed 9–5–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
daltland on DSKBBV9HB2PROD with NOTICES
Filings Instituting Proceedngs
Docket Numbers: RP17–762–000.
Applicants: Tallgrass Interstate Gas
Transmission, LLC.
Description: Rate schedule PAWS
report of Tallgrass Interstate Gas
Transmission, LLC, et al. under RP17–
762.
Filed Date: 7/31/18.
Accession Number: 20180731–5119.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: RP18–1073–000.
Applicants: Comisio´n Federal de
Electricidad,CFE International LLC.
Description: Application for Waiver of
Capacity Release Regulations, et al. of
Comision Federal de Electricidad, et al.
under RP18–1073.
Filed Date: 8/22/18.
Accession Number: 20180822–5061.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1075–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing:
Superseding Non-conf Neg Rate Agmt
(Entergy 48765) to be effective 9/1/2018.
Filed Date: 8/23/18.
Accession Number: 20180823–5000.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1076–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: AGT
Aug2018 NRA Cleanup Filing to be
effective 9/23/2018.
Filed Date: 8/23/18.
Accession Number: 20180823–5026.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1077–000.
VerDate Sep<11>2014
16:56 Sep 05, 2018
Jkt 244001
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing: Update
to Guardian URL to be effective 9/24/
2018.
Filed Date: 8/23/18.
Accession Number: 20180823–5054.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1078–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing: Update
to Guardian URL to be effective 9/24/
2018.
Filed Date: 8/23/18.
Accession Number: 20180823–5055.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1079–000.
Applicants: Midwestern Gas
Transmission Company.
Description: § 4(d) Rate Filing: Update
to Midwestern URL to be effective 9/24/
2018.
Filed Date: 8/23/18.
Accession Number: 20180823–5056.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1080–000.
Applicants: OkTex Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing: Update
to OkTex URL to be effective 9/24/2018.
Filed Date: 8/23/18.
Accession Number: 20180823–5057.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1081–000.
Applicants: Viking Gas Transmission
Company.
Description: § 4(d) Rate Filing: Update
to Viking URL to be effective 9/24/2018.
Filed Date: 8/23/18.
Accession Number: 20180823–5058.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1082–000.
Applicants: Northwest Pipeline LLC.
Description: § 4(d) Rate Filing: 2018
Housekeeping Filing to be effective 10/
1/2018.
Filed Date: 8/23/18.
Accession Number: 20180823–5059.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1083–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: TETLP
Aug2018 NCF and NRA Cleanup Filing
to be effective 9/23/2018.
Filed Date: 8/23/18.
Accession Number: 20180823–5076.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1086–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates Atlantic Energy eff 9–
1–18 to be effective 9/1/2018.
Filed Date: 8/28/18.
Accession Number: 20180828–5034.
Comments Due: 5 p.m. ET 9/10/18.
The filings are accessible in the
Commission’s eLibrary system by
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 29, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary
[FR Doc. 2018–19263 Filed 9–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2685–029]
Notice of Availability of Draft
Environmental Assessment: New York
Power Authority
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for a new license for the
Blenheim-Gilboa Pumped Storage
Project, located on Schoharie Creek, in
the Towns of Blenheim and Gilboa in
Schoharie County, New York, and has
prepared a draft Environmental
Assessment (EA) for the project.
The draft EA contains staff’s analysis
of the potential environmental impacts
of the project and concludes that
licensing the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the draft EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
E:\FR\FM\06SEN1.SGM
06SEN1
Federal Register / Vol. 83, No. 173 / Thursday, September 6, 2018 / Notices
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support. In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2685–029.
For further information, contact Andy
Bernick at (202) 502–8660 or by email
at andrew.bernick@ferc.gov.
Dated: August 30, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–19242 Filed 9–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–2246–000]
daltland on DSKBBV9HB2PROD with NOTICES
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization: Heartland Divide Wind
Project, LLC
This is a supplemental notice in the
above-referenced proceeding of
Heartland Divide Wind Project, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
VerDate Sep<11>2014
16:56 Sep 05, 2018
Jkt 244001
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
19, 2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 30, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19266 Filed 9–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP18–1087–000.
Applicants: Bison Pipeline LLC.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
45229
Description: § 4(d) Rate Filing: Bison
Tenaska Non-Conforming Agreement to
be effective 1/14/2019.
Filed Date: 8/29/18.
Accession Number: 20180829–5138.
Comments Due: 5 p.m. ET 9/10/18.
Docket Numbers: RP18–1088–000.
Applicants: Elba Express Company,
L.L.C.
Description: § 4(d) Rate Filing: Shell
Negotiated Rate 9/10/18 to be effective
9/10/2018.
Filed Date: 8/29/18.
Accession Number: 20180829–5103.
Comments Due: 5 p.m. ET 9/10/18.
Docket Numbers: RP18–1089–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—Plymouth to
Macquarie 797391 to be effective 9/1/
2018.
Filed Date: 8/29/18.
Accession Number: 20180829–5105.
Comments Due: 5 p.m. ET 9/10/18.
Docket Numbers: RP18–1090–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—Boston Gas to BBPC
797311 to be effective 9/1/2018.
Filed Date: 8/29/18.
Accession Number: 20180829–5111.
Comments Due: 5 p.m. ET 9/10/18.
Docket Numbers: RP18–1091–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—Chevron to Colonial
K8952768 to be effective 9/1/2018.
Filed Date: 8/29/18.
Accession Number: 20180829–5114.
Comments Due: 5 p.m. ET 9/10/18.
Docket Numbers: RP18–1092–000.
Applicants: Sierrita Gas Pipeline LLC.
Description: § 4(d) Rate Filing:
Revenue Sharing Update to be effective
10/1/2018.
Filed Date: 8/29/18.
Accession Number: 20180829–5137.
Comments Due: 5 p.m. ET 9/10/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
E:\FR\FM\06SEN1.SGM
06SEN1
Agencies
[Federal Register Volume 83, Number 173 (Thursday, September 6, 2018)]
[Notices]
[Pages 45228-45229]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19242]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2685-029]
Notice of Availability of Draft Environmental Assessment: New
York Power Authority
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the application for a new license for the Blenheim-Gilboa
Pumped Storage Project, located on Schoharie Creek, in the Towns of
Blenheim and Gilboa in Schoharie County, New York, and has prepared a
draft Environmental Assessment (EA) for the project.
The draft EA contains staff's analysis of the potential
environmental impacts of the project and concludes that licensing the
project, with appropriate environmental protective measures, would not
constitute a major federal action that would significantly affect the
quality of the human environment.
A copy of the draft EA is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
at https://www.ferc.gov using the eLibrary link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC Online Support at
[email protected]
[[Page 45229]]
ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Any comments should be filed within 30 days from the date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters, without prior registration, using the eComment system
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support. In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The
first page of any filing should include docket number P-2685-029.
For further information, contact Andy Bernick at (202) 502-8660 or
by email at [email protected].
Dated: August 30, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-19242 Filed 9-5-18; 8:45 am]
BILLING CODE 6717-01-P