Notice of Intent To Prepare an Environmental Assessment for the Proposed Gateway Project, and Request for Comments on Environmental Issues: Sendero Carlsbad Gateway, LLC, 45231-45233 [2018-19236]

Download as PDF Federal Register / Vol. 83, No. 173 / Thursday, September 6, 2018 / Notices other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 29, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. Notice of Intent To Prepare an Environmental Assessment for the Proposed Gateway Project, and Request for Comments on Environmental Issues: Sendero Carlsbad Gateway, LLC BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL18–193–000] Notice of Institution of Section 206 Proceeding and Refund Effective Date: Citizens Sycamore-Penasquitos Transmission LLC On August 30, 2018, the Commission issued an order in Docket No. EL18– 193–000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into whether Citizens SycamorePenasquitos Transmission LLC’s proposed transmission owner tariff may be unjust and unreasonable. Citizens Sycamore-Penasquitos Transmission LLC, 164 FERC 61,149 (2018). The refund effective date in Docket No. EL18–193–000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Any interested person desiring to be heard in Docket No. EL18–193–000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.214, within 21 days of the date of issuance of the order. Dated: August 30, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–19270 Filed 9–5–18; 8:45 am] daltland on DSKBBV9HB2PROD with NOTICES BILLING CODE 6717–01–P 16:56 Sep 05, 2018 Federal Energy Regulatory Commission [Docket No. CP18–538–000] [FR Doc. 2018–19262 Filed 9–5–18; 8:45 am] VerDate Sep<11>2014 DEPARTMENT OF ENERGY Jkt 244001 The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Gateway Project involving construction and operation of facilities by Sendero Carlsbad Gateway, LLC (Gateway) in Eddy County, New Mexico and Culberson County, Texas. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies about issues regarding the project. The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires the Commission to discover concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC on or before 5:00 p.m. Eastern Time on September 28, 2018. You can make a difference by submitting your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Commission staff will consider and address all filed comments during the preparation of the EA. If you sent comments on this project to the Commission before the opening of this docket on August 9, 2018, you will PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 45231 need to file those comments in Docket No. CP18–538–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable easement agreement. You are not required to enter into an agreement. However, if the Commission approves the project, that approval conveys with it the right of eminent domain. Therefore, if you and the company do not reach an easement agreement, the pipeline company could initiate condemnation proceedings in court. In such instances, compensation would be determined by a judge in accordance with state law. Gateway provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC website (www.ferc.gov). Public Participation For your convenience, there are three methods you can use to submit your comments to the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. Using eComment is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must E:\FR\FM\06SEN1.SGM 06SEN1 45232 Federal Register / Vol. 83, No. 173 / Thursday, September 6, 2018 / Notices first create an account by clicking on eRegister. You will be asked to select the type of filing you are making; a comment on a particular project is considered a Comment on a Filing; or (3) You can file a paper copy of your comments by mailing them to the following address. Be sure to reference the project docket number (CP18–538– 000) with your submission: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Summary of the Proposed Project Gateway proposes to construct, operate, and maintain various facilities in connection with its proposed Gateway Project located in Eddy County, New Mexico and Culberson County, Texas. The Gateway Project would provide about 400 million standard cubic feet of natural gas per day from Gateway’s newly expanded Carlsbad Plant (a cryogenic gas processing plant) to the Agua Blanca intrastate pipeline owned by White Water Midstream, LLC. According to Gateway, its project would help alleviate natural gas supply delivery constraints in southeast New Mexico and satisfy overall demand in the western region of the United States. The Gateway Project would consist of the following facilities: • Approximately 23 miles of 24-inchdiameter natural gas transmission pipeline; • A new meter station (including a mainline block valve and pig 1 launcher) within the existing Carlsbad Plant; • A mainline block valve at milepost 15.0; and • A pig receiver and mainline block valve at milepost 23.3 near a White Water Midstream, LLC meter station. The general location of the project facilities is shown in appendix 1.2 Land Requirements for Construction daltland on DSKBBV9HB2PROD with NOTICES Construction of the proposed facilities would disturb about 334 acres of land for the aboveground facilities and the pipeline. Following construction, Gateway would maintain about 100 acres of land for permanent operation of the project’s facilities; the remaining 1 A ‘‘pig’’ is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning the pipeline, conducting internal inspections, or other purposes. 2 The appendices referenced in this notice will not appear in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called eLibrary or from the Commission’s Public Reference Room, 888 First Street NE, Washington, DC 20426, or call (202) 502– 8371. For instructions on connecting to eLibrary, refer to the last page of this notice. VerDate Sep<11>2014 16:56 Sep 05, 2018 Jkt 244001 acreage would be restored and would revert to former uses. About 82 percent of the proposed pipeline route parallels existing pipeline, utility, or road rightsof-way. The EA Process The EA will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils; • Land use; • Water resources, fisheries, and wetlands; • Cultural resources; • Vegetation and wildlife; • Air quality and noise; • Endangered and threatened species; • Public safety; and • Cumulative impacts. Commission staff will also evaluate reasonable alternatives to the proposed project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. The EA will present Commission staffs’ independent analysis of the issues. The EA will be available in the public record through eLibrary,3 and issued for an allotted comment period. Commission staff will consider and address all comments on the EA before making recommendations to the Commission. To ensure Commission staff have the opportunity to address your comments, please carefully follow the instructions in the Public Participation section, beginning on page 2. With this notice, the Commission is asking agencies with jurisdiction by law and/or special expertise with respect to the environmental issues of this project to formally cooperate in the preparation of the EA.4 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultation Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, the Commission is using this notice to initiate consultation with the applicable State Historic Preservation Offices (SHPO), and to 3 For instructions on connecting to eLibrary, refer to the last page of this notice. 4 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, part 1501.6. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.5 Commission staff will define the project-specific Area of Potential Effects (APE) in consultation with the SHPOs as the project develops. On natural gas facility projects, the APE at a minimum encompasses all areas subject to ground disturbance (examples include construction right-of-way, contractor/ pipe storage yards, compressor stations, and access roads). The EA for this project will document findings on the impacts on historic properties and summarize the status of consultations under section 106. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. Commission staff will update the environmental mailing list as the analysis proceeds to ensure that information related to this environmental review is sent to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If you need to make changes to your name/address, or if you would like to remove your name from the mailing list, please return the attached Mailing List Update Form (appendix 2). Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website at www.ferc.gov using the eLibrary link. Click on the eLibrary link, click on General Search and enter the docket number in the Docket Number field, excluding the last three digits (i.e., CP18–538). Be sure you have selected an appropriate date range. For 5 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. E:\FR\FM\06SEN1.SGM 06SEN1 Federal Register / Vol. 83, No. 173 / Thursday, September 6, 2018 / Notices assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Finally, public sessions or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: August 29, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–19236 Filed 9–5–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–2335–000] daltland on DSKBBV9HB2PROD with NOTICES Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization: Josco Energy USA, LLC This is a supplemental notice in the above-referenced proceeding Josco Energy USA, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 19, 2018. VerDate Sep<11>2014 16:56 Sep 05, 2018 Jkt 244001 The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 30, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–19269 Filed 9–5–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–13–000] Notice of Availability of the Environmental Assessment for the Proposed Columbia Gas Transmission, LLC Line 8000 Replacement Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Line 8000 Replacement Project (Project), proposed by Columbia Gas Transmission, LLC (Columbia) in the above-referenced docket. Columbia requests authorization to modernize and upgrade Columbia’s Line 8000 pipeline system by replacing and abandoning existing pipeline and constructing new pipeline and appurtenant facilities in Mineral County, West Virginia and Allegany County, Maryland. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 45233 The EA assesses the potential environmental effects of the construction and operation of the Project in accordance with the requirements of the National Environmental Policy Act (NEPA). The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment. The proposed Line 8000 Project would consist of: • Replacement of a total of approximately 13.25 miles of existing 12-inch-diameter bare steel pipeline, with approximately 13.54 miles of new, coated 12-inch-diameter natural gas transmission pipeline in five sections and four modification points along Line 8000 and Lateral Line 8006; • Replacement of a total of approximately 0.54 miles of existing 4inch-diameter bare steel pipeline, with approximately 0.67 miles of new coated 4-inch-diameter natural gas transmission pipeline along two laterals (Lateral Lines 8225 and 8244); • Installation of two new pig 1 launcher and receiver sites and four new mainline valves associated with pipeline facilities; • Modifications/abandonment of three existing mainline valves and three existing side tap valve sites and modification of tie-ins at two regulator stations; and • Abandonment of 13 active residential taps and 109 inactive taps. The FERC staff mailed copies of the EA to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the project area. In addition, the EA is available for public viewing on the FERC’s website (www.ferc.gov) using the eLibrary link. A limited number of copies of the EA are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street NE, Room 2A, Washington, DC 20426, (202) 502–8371. Any person wishing to comment on the EA may do so. Your comments should focus on the EA’s disclosure and discussion of potential environmental effects, reasonable alternatives, and 1 A pig is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning the pipeline, conducting internal inspections, or other purposes. E:\FR\FM\06SEN1.SGM 06SEN1

Agencies

[Federal Register Volume 83, Number 173 (Thursday, September 6, 2018)]
[Notices]
[Pages 45231-45233]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19236]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-538-000]


Notice of Intent To Prepare an Environmental Assessment for the 
Proposed Gateway Project, and Request for Comments on Environmental 
Issues: Sendero Carlsbad Gateway, LLC

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Gateway Project involving 
construction and operation of facilities by Sendero Carlsbad Gateway, 
LLC (Gateway) in Eddy County, New Mexico and Culberson County, Texas. 
The Commission will use this EA in its decision-making process to 
determine whether the project is in the public convenience and 
necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies about issues regarding the project. The National Environmental 
Policy Act (NEPA) requires the Commission to take into account the 
environmental impacts that could result from its action whenever it 
considers the issuance of a Certificate of Public Convenience and 
Necessity. NEPA also requires the Commission to discover concerns the 
public may have about proposals. This process is referred to as 
``scoping.'' The main goal of the scoping process is to focus the 
analysis in the EA on the important environmental issues. By this 
notice, the Commission requests public comments on the scope of the 
issues to address in the EA. To ensure that your comments are timely 
and properly recorded, please submit your comments so that the 
Commission receives them in Washington, DC on or before 5:00 p.m. 
Eastern Time on September 28, 2018.
    You can make a difference by submitting your specific comments or 
concerns about the project. Your comments should focus on the potential 
environmental effects, reasonable alternatives, and measures to avoid 
or lessen environmental impacts. Your input will help the Commission 
staff determine what issues they need to evaluate in the EA. Commission 
staff will consider and address all filed comments during the 
preparation of the EA.
    If you sent comments on this project to the Commission before the 
opening of this docket on August 9, 2018, you will need to file those 
comments in Docket No. CP18-538-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable easement agreement. You 
are not required to enter into an agreement. However, if the Commission 
approves the project, that approval conveys with it the right of 
eminent domain. Therefore, if you and the company do not reach an 
easement agreement, the pipeline company could initiate condemnation 
proceedings in court. In such instances, compensation would be 
determined by a judge in accordance with state law.
    Gateway provided landowners with a fact sheet prepared by the FERC 
entitled ``An Interstate Natural Gas Facility On My Land? What Do I 
Need To Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC website (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. Using eComment is an easy 
method for submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. With eFiling, you can provide 
comments in a variety of formats by attaching them as a file with your 
submission. New eFiling users must

[[Page 45232]]

first create an account by clicking on eRegister. You will be asked to 
select the type of filing you are making; a comment on a particular 
project is considered a Comment on a Filing; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP18-538-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    Gateway proposes to construct, operate, and maintain various 
facilities in connection with its proposed Gateway Project located in 
Eddy County, New Mexico and Culberson County, Texas. The Gateway 
Project would provide about 400 million standard cubic feet of natural 
gas per day from Gateway's newly expanded Carlsbad Plant (a cryogenic 
gas processing plant) to the Agua Blanca intrastate pipeline owned by 
White Water Midstream, LLC. According to Gateway, its project would 
help alleviate natural gas supply delivery constraints in southeast New 
Mexico and satisfy overall demand in the western region of the United 
States.
    The Gateway Project would consist of the following facilities:
     Approximately 23 miles of 24-inch-diameter natural gas 
transmission pipeline;
     A new meter station (including a mainline block valve and 
pig \1\ launcher) within the existing Carlsbad Plant;
---------------------------------------------------------------------------

    \1\ A ``pig'' is a tool that the pipeline company inserts into 
and pushes through the pipeline for cleaning the pipeline, 
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------

     A mainline block valve at milepost 15.0; and
     A pig receiver and mainline block valve at milepost 23.3 
near a White Water Midstream, LLC meter station.
    The general location of the project facilities is shown in appendix 
1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called eLibrary or from the Commission's Public 
Reference Room, 888 First Street NE, Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb about 334 
acres of land for the aboveground facilities and the pipeline. 
Following construction, Gateway would maintain about 100 acres of land 
for permanent operation of the project's facilities; the remaining 
acreage would be restored and would revert to former uses. About 82 
percent of the proposed pipeline route parallels existing pipeline, 
utility, or road rights-of-way.

The EA Process

    The EA will discuss impacts that could occur as a result of the 
construction and operation of the proposed project under these general 
headings:
     Geology and soils;
     Land use;
     Water resources, fisheries, and wetlands;
     Cultural resources;
     Vegetation and wildlife;
     Air quality and noise;
     Endangered and threatened species;
     Public safety; and
     Cumulative impacts.
    Commission staff will also evaluate reasonable alternatives to the 
proposed project or portions of the project, and make recommendations 
on how to lessen or avoid impacts on the various resource areas.
    The EA will present Commission staffs' independent analysis of the 
issues. The EA will be available in the public record through 
eLibrary,\3\ and issued for an allotted comment period. Commission 
staff will consider and address all comments on the EA before making 
recommendations to the Commission. To ensure Commission staff have the 
opportunity to address your comments, please carefully follow the 
instructions in the Public Participation section, beginning on page 2.
---------------------------------------------------------------------------

    \3\ For instructions on connecting to eLibrary, refer to the 
last page of this notice.
---------------------------------------------------------------------------

    With this notice, the Commission is asking agencies with 
jurisdiction by law and/or special expertise with respect to the 
environmental issues of this project to formally cooperate in the 
preparation of the EA.\4\ Agencies that would like to request 
cooperating agency status should follow the instructions for filing 
comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \4\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, part 1501.6.
---------------------------------------------------------------------------

Consultation Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, the Commission is using this notice to initiate 
consultation with the applicable State Historic Preservation Offices 
(SHPO), and to solicit their views and those of other government 
agencies, interested Indian tribes, and the public on the project's 
potential effects on historic properties.\5\ Commission staff will 
define the project-specific Area of Potential Effects (APE) in 
consultation with the SHPOs as the project develops. On natural gas 
facility projects, the APE at a minimum encompasses all areas subject 
to ground disturbance (examples include construction right-of-way, 
contractor/pipe storage yards, compressor stations, and access roads). 
The EA for this project will document findings on the impacts on 
historic properties and summarize the status of consultations under 
section 106.
---------------------------------------------------------------------------

    \5\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. Commission staff will update the environmental 
mailing list as the analysis proceeds to ensure that information 
related to this environmental review is sent to all individuals, 
organizations, and government entities interested in and/or potentially 
affected by the proposed project.
    If you need to make changes to your name/address, or if you would 
like to remove your name from the mailing list, please return the 
attached Mailing List Update Form (appendix 2).

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at www.ferc.gov using the eLibrary link. Click on the 
eLibrary link, click on General Search and enter the docket number in 
the Docket Number field, excluding the last three digits (i.e., CP18-
538). Be sure you have selected an appropriate date range. For

[[Page 45233]]

assistance, please contact FERC Online Support at 
[email protected] or (866) 208-3676, or for TTY, contact (202) 
502-8659. The eLibrary link also provides access to the texts of all 
formal documents issued by the Commission, such as orders, notices, and 
rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public sessions or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: August 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-19236 Filed 9-5-18; 8:45 am]
 BILLING CODE 6717-01-P