Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Gateway Project, and
Request for Comments on
Environmental Issues: Sendero
Carlsbad Gateway, LLC
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL18–193–000]
Notice of Institution of Section 206
Proceeding and Refund Effective Date:
Citizens Sycamore-Penasquitos
Transmission LLC
On August 30, 2018, the Commission
issued an order in Docket No. EL18–
193–000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into whether Citizens SycamorePenasquitos Transmission LLC’s
proposed transmission owner tariff may
be unjust and unreasonable. Citizens
Sycamore-Penasquitos Transmission
LLC, 164 FERC 61,149 (2018).
The refund effective date in Docket
No. EL18–193–000, established
pursuant to section 206(b) of the FPA,
will be the date of publication of this
notice in the Federal Register.
Any interested person desiring to be
heard in Docket No. EL18–193–000
must file a notice of intervention or
motion to intervene, as appropriate,
with the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426, in accordance
with Rule 214 of the Commission’s
Rules of Practice and Procedure, 18 CFR
385.214, within 21 days of the date of
issuance of the order.
Dated: August 30, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19270 Filed 9–5–18; 8:45 am]
daltland on DSKBBV9HB2PROD with NOTICES
BILLING CODE 6717–01–P
16:56 Sep 05, 2018
Federal Energy Regulatory
Commission
[Docket No. CP18–538–000]
[FR Doc. 2018–19262 Filed 9–5–18; 8:45 am]
VerDate Sep<11>2014
DEPARTMENT OF ENERGY
Jkt 244001
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Gateway Project involving
construction and operation of facilities
by Sendero Carlsbad Gateway, LLC
(Gateway) in Eddy County, New Mexico
and Culberson County, Texas. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity.
NEPA also requires the Commission to
discover concerns the public may have
about proposals. This process is referred
to as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the EA on the important
environmental issues. By this notice, the
Commission requests public comments
on the scope of the issues to address in
the EA. To ensure that your comments
are timely and properly recorded, please
submit your comments so that the
Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on September 28, 2018.
You can make a difference by
submitting your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
will consider and address all filed
comments during the preparation of the
EA.
If you sent comments on this project
to the Commission before the opening of
this docket on August 9, 2018, you will
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
45231
need to file those comments in Docket
No. CP18–538–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, that approval conveys with
it the right of eminent domain.
Therefore, if you and the company do
not reach an easement agreement, the
pipeline company could initiate
condemnation proceedings in court. In
such instances, compensation would be
determined by a judge in accordance
with state law.
Gateway provided landowners with a
fact sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’
This fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC website
(www.ferc.gov).
Public Participation
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. Using eComment is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
E:\FR\FM\06SEN1.SGM
06SEN1
45232
Federal Register / Vol. 83, No. 173 / Thursday, September 6, 2018 / Notices
first create an account by clicking on
eRegister. You will be asked to select the
type of filing you are making; a
comment on a particular project is
considered a Comment on a Filing; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (CP18–538–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Summary of the Proposed Project
Gateway proposes to construct,
operate, and maintain various facilities
in connection with its proposed
Gateway Project located in Eddy
County, New Mexico and Culberson
County, Texas. The Gateway Project
would provide about 400 million
standard cubic feet of natural gas per
day from Gateway’s newly expanded
Carlsbad Plant (a cryogenic gas
processing plant) to the Agua Blanca
intrastate pipeline owned by White
Water Midstream, LLC. According to
Gateway, its project would help
alleviate natural gas supply delivery
constraints in southeast New Mexico
and satisfy overall demand in the
western region of the United States.
The Gateway Project would consist of
the following facilities:
• Approximately 23 miles of 24-inchdiameter natural gas transmission
pipeline;
• A new meter station (including a
mainline block valve and pig 1 launcher)
within the existing Carlsbad Plant;
• A mainline block valve at milepost
15.0; and
• A pig receiver and mainline block
valve at milepost 23.3 near a White
Water Midstream, LLC meter station.
The general location of the project
facilities is shown in appendix 1.2
Land Requirements for Construction
daltland on DSKBBV9HB2PROD with NOTICES
Construction of the proposed facilities
would disturb about 334 acres of land
for the aboveground facilities and the
pipeline. Following construction,
Gateway would maintain about 100
acres of land for permanent operation of
the project’s facilities; the remaining
1 A ‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes.
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called eLibrary or from the
Commission’s Public Reference Room, 888 First
Street NE, Washington, DC 20426, or call (202) 502–
8371. For instructions on connecting to eLibrary,
refer to the last page of this notice.
VerDate Sep<11>2014
16:56 Sep 05, 2018
Jkt 244001
acreage would be restored and would
revert to former uses. About 82 percent
of the proposed pipeline route parallels
existing pipeline, utility, or road rightsof-way.
The EA Process
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• Land use;
• Water resources, fisheries, and
wetlands;
• Cultural resources;
• Vegetation and wildlife;
• Air quality and noise;
• Endangered and threatened species;
• Public safety; and
• Cumulative impacts.
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project, and
make recommendations on how to
lessen or avoid impacts on the various
resource areas.
The EA will present Commission
staffs’ independent analysis of the
issues. The EA will be available in the
public record through eLibrary,3 and
issued for an allotted comment period.
Commission staff will consider and
address all comments on the EA before
making recommendations to the
Commission. To ensure Commission
staff have the opportunity to address
your comments, please carefully follow
the instructions in the Public
Participation section, beginning on page
2.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the EA.4 Agencies that would like to
request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Offices (SHPO), and to
3 For
instructions on connecting to eLibrary, refer
to the last page of this notice.
4 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, part 1501.6.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
solicit their views and those of other
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.5
Commission staff will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPOs
as the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). The EA for this
project will document findings on the
impacts on historic properties and
summarize the status of consultations
under section 106.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. Commission
staff will update the environmental
mailing list as the analysis proceeds to
ensure that information related to this
environmental review is sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please return the attached Mailing List
Update Form (appendix 2).
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on General Search and enter the
docket number in the Docket Number
field, excluding the last three digits (i.e.,
CP18–538). Be sure you have selected
an appropriate date range. For
5 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
E:\FR\FM\06SEN1.SGM
06SEN1
Federal Register / Vol. 83, No. 173 / Thursday, September 6, 2018 / Notices
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public sessions or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: August 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–19236 Filed 9–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–2335–000]
daltland on DSKBBV9HB2PROD with NOTICES
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization: Josco Energy USA, LLC
This is a supplemental notice in the
above-referenced proceeding Josco
Energy USA, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
19, 2018.
VerDate Sep<11>2014
16:56 Sep 05, 2018
Jkt 244001
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 30, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–19269 Filed 9–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–13–000]
Notice of Availability of the
Environmental Assessment for the
Proposed Columbia Gas Transmission,
LLC Line 8000 Replacement Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Line 8000 Replacement Project (Project),
proposed by Columbia Gas
Transmission, LLC (Columbia) in the
above-referenced docket. Columbia
requests authorization to modernize and
upgrade Columbia’s Line 8000 pipeline
system by replacing and abandoning
existing pipeline and constructing new
pipeline and appurtenant facilities in
Mineral County, West Virginia and
Allegany County, Maryland.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
45233
The EA assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The proposed Line 8000 Project
would consist of:
• Replacement of a total of
approximately 13.25 miles of existing
12-inch-diameter bare steel pipeline,
with approximately 13.54 miles of new,
coated 12-inch-diameter natural gas
transmission pipeline in five sections
and four modification points along Line
8000 and Lateral Line 8006;
• Replacement of a total of
approximately 0.54 miles of existing 4inch-diameter bare steel pipeline, with
approximately 0.67 miles of new coated
4-inch-diameter natural gas
transmission pipeline along two laterals
(Lateral Lines 8225 and 8244);
• Installation of two new pig 1
launcher and receiver sites and four
new mainline valves associated with
pipeline facilities;
• Modifications/abandonment of
three existing mainline valves and three
existing side tap valve sites and
modification of tie-ins at two regulator
stations; and
• Abandonment of 13 active
residential taps and 109 inactive taps.
The FERC staff mailed copies of the
EA to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
project area. In addition, the EA is
available for public viewing on the
FERC’s website (www.ferc.gov) using the
eLibrary link. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference Room, 888 First Street
NE, Room 2A, Washington, DC 20426,
(202) 502–8371.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the EA’s disclosure and
discussion of potential environmental
effects, reasonable alternatives, and
1 A pig is a tool that the pipeline company inserts
into and pushes through the pipeline for cleaning
the pipeline, conducting internal inspections, or
other purposes.
E:\FR\FM\06SEN1.SGM
06SEN1
Agencies
[Federal Register Volume 83, Number 173 (Thursday, September 6, 2018)]
[Notices]
[Pages 45231-45233]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-19236]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-538-000]
Notice of Intent To Prepare an Environmental Assessment for the
Proposed Gateway Project, and Request for Comments on Environmental
Issues: Sendero Carlsbad Gateway, LLC
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Gateway Project involving
construction and operation of facilities by Sendero Carlsbad Gateway,
LLC (Gateway) in Eddy County, New Mexico and Culberson County, Texas.
The Commission will use this EA in its decision-making process to
determine whether the project is in the public convenience and
necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies about issues regarding the project. The National Environmental
Policy Act (NEPA) requires the Commission to take into account the
environmental impacts that could result from its action whenever it
considers the issuance of a Certificate of Public Convenience and
Necessity. NEPA also requires the Commission to discover concerns the
public may have about proposals. This process is referred to as
``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on the important environmental issues. By this
notice, the Commission requests public comments on the scope of the
issues to address in the EA. To ensure that your comments are timely
and properly recorded, please submit your comments so that the
Commission receives them in Washington, DC on or before 5:00 p.m.
Eastern Time on September 28, 2018.
You can make a difference by submitting your specific comments or
concerns about the project. Your comments should focus on the potential
environmental effects, reasonable alternatives, and measures to avoid
or lessen environmental impacts. Your input will help the Commission
staff determine what issues they need to evaluate in the EA. Commission
staff will consider and address all filed comments during the
preparation of the EA.
If you sent comments on this project to the Commission before the
opening of this docket on August 9, 2018, you will need to file those
comments in Docket No. CP18-538-000 to ensure they are considered as
part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable easement agreement. You
are not required to enter into an agreement. However, if the Commission
approves the project, that approval conveys with it the right of
eminent domain. Therefore, if you and the company do not reach an
easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law.
Gateway provided landowners with a fact sheet prepared by the FERC
entitled ``An Interstate Natural Gas Facility On My Land? What Do I
Need To Know?'' This fact sheet addresses a number of typically asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC website (www.ferc.gov).
Public Participation
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. Using eComment is an easy
method for submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must
[[Page 45232]]
first create an account by clicking on eRegister. You will be asked to
select the type of filing you are making; a comment on a particular
project is considered a Comment on a Filing; or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket number
(CP18-538-000) with your submission: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426.
Summary of the Proposed Project
Gateway proposes to construct, operate, and maintain various
facilities in connection with its proposed Gateway Project located in
Eddy County, New Mexico and Culberson County, Texas. The Gateway
Project would provide about 400 million standard cubic feet of natural
gas per day from Gateway's newly expanded Carlsbad Plant (a cryogenic
gas processing plant) to the Agua Blanca intrastate pipeline owned by
White Water Midstream, LLC. According to Gateway, its project would
help alleviate natural gas supply delivery constraints in southeast New
Mexico and satisfy overall demand in the western region of the United
States.
The Gateway Project would consist of the following facilities:
Approximately 23 miles of 24-inch-diameter natural gas
transmission pipeline;
A new meter station (including a mainline block valve and
pig \1\ launcher) within the existing Carlsbad Plant;
---------------------------------------------------------------------------
\1\ A ``pig'' is a tool that the pipeline company inserts into
and pushes through the pipeline for cleaning the pipeline,
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------
A mainline block valve at milepost 15.0; and
A pig receiver and mainline block valve at milepost 23.3
near a White Water Midstream, LLC meter station.
The general location of the project facilities is shown in appendix
1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called eLibrary or from the Commission's Public
Reference Room, 888 First Street NE, Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 334
acres of land for the aboveground facilities and the pipeline.
Following construction, Gateway would maintain about 100 acres of land
for permanent operation of the project's facilities; the remaining
acreage would be restored and would revert to former uses. About 82
percent of the proposed pipeline route parallels existing pipeline,
utility, or road rights-of-way.
The EA Process
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils;
Land use;
Water resources, fisheries, and wetlands;
Cultural resources;
Vegetation and wildlife;
Air quality and noise;
Endangered and threatened species;
Public safety; and
Cumulative impacts.
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project, and make recommendations
on how to lessen or avoid impacts on the various resource areas.
The EA will present Commission staffs' independent analysis of the
issues. The EA will be available in the public record through
eLibrary,\3\ and issued for an allotted comment period. Commission
staff will consider and address all comments on the EA before making
recommendations to the Commission. To ensure Commission staff have the
opportunity to address your comments, please carefully follow the
instructions in the Public Participation section, beginning on page 2.
---------------------------------------------------------------------------
\3\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the EA.\4\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\4\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, part 1501.6.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Offices
(SHPO), and to solicit their views and those of other government
agencies, interested Indian tribes, and the public on the project's
potential effects on historic properties.\5\ Commission staff will
define the project-specific Area of Potential Effects (APE) in
consultation with the SHPOs as the project develops. On natural gas
facility projects, the APE at a minimum encompasses all areas subject
to ground disturbance (examples include construction right-of-way,
contractor/pipe storage yards, compressor stations, and access roads).
The EA for this project will document findings on the impacts on
historic properties and summarize the status of consultations under
section 106.
---------------------------------------------------------------------------
\5\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. Commission staff will update the environmental
mailing list as the analysis proceeds to ensure that information
related to this environmental review is sent to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project.
If you need to make changes to your name/address, or if you would
like to remove your name from the mailing list, please return the
attached Mailing List Update Form (appendix 2).
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on General Search and enter the docket number in
the Docket Number field, excluding the last three digits (i.e., CP18-
538). Be sure you have selected an appropriate date range. For
[[Page 45233]]
assistance, please contact FERC Online Support at
[email protected] or (866) 208-3676, or for TTY, contact (202)
502-8659. The eLibrary link also provides access to the texts of all
formal documents issued by the Commission, such as orders, notices, and
rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Finally, public sessions or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: August 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-19236 Filed 9-5-18; 8:45 am]
BILLING CODE 6717-01-P