Combined Notice of Filings #1, 44612-44613 [2018-18956]

Download as PDF 44612 Federal Register / Vol. 83, No. 170 / Friday, August 31, 2018 / Notices copying within 60 days at the following website: https://energy.gov/fe/services/ advisory-committees/methane-hydrateadvisory-committee. Signed in Washington, DC, on August 28, 2018. Latanya Butler, Deputy Committee Management Officer. [FR Doc. 2018–18955 Filed 8–30–18; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: August 27, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [Docket No. ER18–2310–000] daltland on DSKBBV9HB2PROD with NOTICES Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization: Rose Wind Holdings, LLC [FR Doc. 2018–18947 Filed 8–30–18; 8:45 am] BILLING CODE 6717–01–P This is a supplemental notice in the above-referenced proceeding Rose Wind Holdings, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 17, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. VerDate Sep<11>2014 18:42 Aug 30, 2018 Jkt 244001 The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–706–005. Applicants: GridLiance West LLC. Description: Compliance filing: GWL Compliance Filing WS 12 to be effective 9/14/2017. Filed Date: 8/23/18. Accession Number: 20180823–5117. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–1788–000. Applicants: MATL LLP. Description: Response of MATL LLP to July 24, 2018 letter requesting additional information. Filed Date: 8/21/18. Accession Number: 20180821–5125. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–2206–001. Applicants: GridLiance West LLC. Description: Tariff Amendment: GWL Name Change WS 12 Amendment Filing to be effective 8/13/2018. Filed Date: 8/23/18. Accession Number: 20180823–5120. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–2288–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Amended Service Agreements City of Victorville Foxborough & SCLA Nos. 218 & 230 to be effective 9/1/2018. Filed Date: 8/23/18. Accession Number: 20180823–5130. Comments Due: 5 p.m. ET 9/13/18. Docket Numbers: ER18–2289–000. PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Financial Transmission Rights Liquidation Revisions to be effective 8/24/2018. Filed Date: 8/23/18. Accession Number: 20180823–5131. Comments Due: 5 p.m. ET 9/13/18. Docket Numbers: ER18–2290–000. Applicants: Northeastern Power Company. Description: Tariff Cancellation: Notice of Cancellation to be effective 11/27/2018. Filed Date: 8/24/18. Accession Number: 20180824–5016. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2291–000. Applicants: Northeastern Power Company. Description: Tariff Cancellation: Notice of Cancellation tariff 124 to be effective 11/27/2018. Filed Date: 8/24/18. Accession Number: 20180824–5021. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2292–000. Applicants: Northeastern Power Company. Description: Tariff Cancellation: Notice of Cancellation 874 to be effective 11/27/2018. Filed Date: 8/24/18. Accession Number: 20180824–5022. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2293–000. Applicants: ISO New England Inc., New England Power Pool Participants Committee. Description: § 205(d) Rate Filing: Changes to ISO New England Financial Assurance Policy to be effective 9/17/2019. Filed Date: 8/24/18. Accession Number: 20180824–5071. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2294–000. Applicants: Public Service Company of New Hampshire. Description: § 205(d) Rate Filing: Amoskeag Station—Interconnection Agreement to be effective 8/26/2018. Filed Date: 8/24/18. Accession Number: 20180824–5096. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2295–000. Applicants: Public Service Company of New Hampshire. Description: § 205(d) Rate Filing: Ayers Island Station—Interconnection Agreement to be effective 8/26/2018. Filed Date: 8/24/18. Accession Number: 20180824–5098. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2296–000. Applicants: Public Service Company of New Hampshire. E:\FR\FM\31AUN1.SGM 31AUN1 daltland on DSKBBV9HB2PROD with NOTICES Federal Register / Vol. 83, No. 170 / Friday, August 31, 2018 / Notices Description: § 205(d) Rate Filing: Canaan Station—Interconnection Agreement to be effective 8/26/2018. Filed Date: 8/24/18. Accession Number: 20180824–5100. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2297–000. Applicants: Public Service Company of New Hampshire. Description: § 205(d) Rate Filing: Eastman Falls Station—Interconnection Agreement to be effective 8/26/2018. Filed Date: 8/24/18. Accession Number: 20180824–5102. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2298–000. Applicants: Public Service Company of New Hampshire. Description: § 205(d) Rate Filing: Garvins Falls/Hooksett Station— Interconnection Agreement to be effective 8/26/2018. Filed Date: 8/24/18. Accession Number: 20180824–5104. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2299–000. Applicants: Public Service Company of New Hampshire. Description: § 205(d) Rate Filing: Gorham Station—Interconnection Agreement to be effective 8/26/2018. Filed Date: 8/24/18. Accession Number: 20180824–5106. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2300–000. Applicants: Public Service Company of New Hampshire. Description: § 205(d) Rate Filing: Jackman Station—Interconnection Agreement to be effective 8/26/2018. Filed Date: 8/24/18. Accession Number: 20180824–5108. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2301–000. Applicants: Public Service Company of New Hampshire. Description: § 205(d) Rate Filing: Smith Station—Interconnection Agreement to be effective 8/26/2018. Filed Date: 8/24/18. Accession Number: 20180824–5110. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2302–000. Applicants: The United Illuminating Company. Description: § 205(d) Rate Filing: Localized Costs Sharing Agreement No. 18 to be effective 1/1/2018. Filed Date: 8/24/18. Accession Number: 20180824–5127. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2303–000. Applicants: Adams Wind Farm, LLC. Description: Baseline eTariff Filing: MBR Tariff Filing of Adams Wind Farm LLC to be effective 10/24/2018. Filed Date: 8/24/18. VerDate Sep<11>2014 18:42 Aug 30, 2018 Jkt 244001 Accession Number: 20180824–5161. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2304–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: BPA Hermiston Interchange Move Agmt to be effective 8/25/2018. Filed Date: 8/24/18. Accession Number: 20180824–5162. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2305–000. Applicants: Bobilli BSS, LLC. Description: Baseline eTariff Filing: MBR Tariff Filing of Bobilli BSS, LLC to be effective 10/24/2018. Filed Date: 8/24/18. Accession Number: 20180824–5165. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2306–000. Applicants: Garwind, LLC. Description: Baseline eTariff Filing: MBR Tariff Filing of Garwind, LLC to be effective 10/24/2018. Filed Date: 8/24/18. Accession Number: 20180824–5168. Comments Due: 5 p.m. ET 9/14/18. Docket Numbers: ER18–2307–000. Applicants: Appalachian Power Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Appalachian Power submits revised ILDSA, Service Agreement No. 1252 to be effective 8/1/2018. Filed Date: 8/24/18. Accession Number: 20180824–5171. Comments Due: 5 p.m. ET 9/14/18. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES18–45–000. Applicants: Allegheny Generating Company. Description: Supplement to July 6, 2018 Application for Authorization Under Section 204(a) of the Federal Power Act to Issue Debt, et al. of Allegheny Generating Company. Filed Date: 8/23/18. Accession Number: 20180823–5160. Comments Due: 5 p.m. ET 9/4/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 44613 service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 24, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–18956 Filed 8–30–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–540–000] Panhandle Eastern Pipe Line Company, LP; Notice of Request Under Blanket Authorization Take notice that on August 17, 2018, Panhandle Eastern Pipe Line Company, LP (Panhandle), 1300 Main Street, Houston, Texas 77002, filed in Docket No. CP18–540–000, a Prior Notice Request pursuant to sections 157.205, and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA), and Panhandle’s blanket certificate issued in Docket No. CP83– 83–000, requesting approval to abandon by sale to ETC Field Services LLC, the Deer Loop Lateral Facilities, consisting of approximately 20.64 miles of 12.75inch diameter pipeline and appurtenances, located in Carson, Hutchinson and Moore Counties, Texas (Deer Loop Lateral Abandonment Project). The Deer Loop Lateral was originally constructed to transport high-pressure gas from Panhandle’s Deer Compressor Station to its Sneed Compressor Station, allowing existing Deer to Sneed facilities to operate as a lower-pressure gathering system.1 Over the years, Panhandle abandoned or spun off its facilities located upstream of the Deer Loop Lateral when Panhandle abandoned its gathering function. Available supply in the vicinity upstream of the Deer Loop Lateral has steadily declined, and in recent years, the line has transported no significant volume. On June 1, 2018, Panhandle and ETC Field Services executed an Asset Sale Agreement (Agreement) in which Panhandle agreed to sell the Deer Loop Lateral to ETC Field Services. Panhandle states that, upon Commission approval and closing of the sale, ETC Field Services will physically integrate the Deer Loop Lateral into its non-jurisdictional gathering operations. 1 Panhandle Eastern Pipe Line Company, 3 FERC 61,099 (1978); 6 FERC 61,180 (1978). E:\FR\FM\31AUN1.SGM 31AUN1

Agencies

[Federal Register Volume 83, Number 170 (Friday, August 31, 2018)]
[Notices]
[Pages 44612-44613]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18956]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER17-706-005.
    Applicants: GridLiance West LLC.
    Description: Compliance filing: GWL Compliance Filing WS 12 to be 
effective 9/14/2017.
    Filed Date: 8/23/18.
    Accession Number: 20180823-5117.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-1788-000.
    Applicants: MATL LLP.
    Description: Response of MATL LLP to July 24, 2018 letter 
requesting additional information.
    Filed Date: 8/21/18.
    Accession Number: 20180821-5125.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-2206-001.
    Applicants: GridLiance West LLC.
    Description: Tariff Amendment: GWL Name Change WS 12 Amendment 
Filing to be effective 8/13/2018.
    Filed Date: 8/23/18.
    Accession Number: 20180823-5120.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-2288-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: Amended Service Agreements 
City of Victorville Foxborough & SCLA Nos. 218 & 230 to be effective 9/
1/2018.
    Filed Date: 8/23/18.
    Accession Number: 20180823-5130.
    Comments Due: 5 p.m. ET 9/13/18.

    Docket Numbers: ER18-2289-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Financial Transmission 
Rights Liquidation Revisions to be effective 8/24/2018.
    Filed Date: 8/23/18.
    Accession Number: 20180823-5131.
    Comments Due: 5 p.m. ET 9/13/18.

    Docket Numbers: ER18-2290-000.
    Applicants: Northeastern Power Company.
    Description: Tariff Cancellation: Notice of Cancellation to be 
effective 11/27/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5016.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2291-000.
    Applicants: Northeastern Power Company.
    Description: Tariff Cancellation: Notice of Cancellation tariff 124 
to be effective 11/27/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5021.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2292-000.
    Applicants: Northeastern Power Company.
    Description: Tariff Cancellation: Notice of Cancellation 874 to be 
effective 11/27/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5022.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2293-000.
    Applicants: ISO New England Inc., New England Power Pool 
Participants Committee.
    Description: Sec.  205(d) Rate Filing: Changes to ISO New England 
Financial Assurance Policy to be effective 9/17/2019.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5071.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2294-000.
    Applicants: Public Service Company of New Hampshire.
    Description: Sec.  205(d) Rate Filing: Amoskeag Station--
Interconnection Agreement to be effective 8/26/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5096.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2295-000.
    Applicants: Public Service Company of New Hampshire.
    Description: Sec.  205(d) Rate Filing: Ayers Island Station--
Interconnection Agreement to be effective 8/26/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5098.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2296-000.
    Applicants: Public Service Company of New Hampshire.

[[Page 44613]]

    Description: Sec.  205(d) Rate Filing: Canaan Station--
Interconnection Agreement to be effective 8/26/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5100.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2297-000.
    Applicants: Public Service Company of New Hampshire.
    Description: Sec.  205(d) Rate Filing: Eastman Falls Station--
Interconnection Agreement to be effective 8/26/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5102.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2298-000.
    Applicants: Public Service Company of New Hampshire.
    Description: Sec.  205(d) Rate Filing: Garvins Falls/Hooksett 
Station--Interconnection Agreement to be effective 8/26/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5104.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2299-000.
    Applicants: Public Service Company of New Hampshire.
    Description: Sec.  205(d) Rate Filing: Gorham Station--
Interconnection Agreement to be effective 8/26/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5106.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2300-000.
    Applicants: Public Service Company of New Hampshire.
    Description: Sec.  205(d) Rate Filing: Jackman Station--
Interconnection Agreement to be effective 8/26/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5108.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2301-000.
    Applicants: Public Service Company of New Hampshire.
    Description: Sec.  205(d) Rate Filing: Smith Station--
Interconnection Agreement to be effective 8/26/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5110.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2302-000.
    Applicants: The United Illuminating Company.
    Description: Sec.  205(d) Rate Filing: Localized Costs Sharing 
Agreement No. 18 to be effective 1/1/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5127.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2303-000.
    Applicants: Adams Wind Farm, LLC.
    Description: Baseline eTariff Filing: MBR Tariff Filing of Adams 
Wind Farm LLC to be effective 10/24/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5161.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2304-000.
    Applicants: PacifiCorp.
    Description: Sec.  205(d) Rate Filing: BPA Hermiston Interchange 
Move Agmt to be effective 8/25/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5162.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2305-000.
    Applicants: Bobilli BSS, LLC.
    Description: Baseline eTariff Filing: MBR Tariff Filing of Bobilli 
BSS, LLC to be effective 10/24/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5165.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2306-000.
    Applicants: Garwind, LLC.
    Description: Baseline eTariff Filing: MBR Tariff Filing of Garwind, 
LLC to be effective 10/24/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5168.
    Comments Due: 5 p.m. ET 9/14/18.

    Docket Numbers: ER18-2307-000.
    Applicants: Appalachian Power Company, PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Appalachian Power submits 
revised ILDSA, Service Agreement No. 1252 to be effective 8/1/2018.
    Filed Date: 8/24/18.
    Accession Number: 20180824-5171.
    Comments Due: 5 p.m. ET 9/14/18.

    Take notice that the Commission received the following electric 
securities filings:
    Docket Numbers: ES18-45-000.
    Applicants: Allegheny Generating Company.
    Description: Supplement to July 6, 2018 Application for 
Authorization Under Section 204(a) of the Federal Power Act to Issue 
Debt, et al. of Allegheny Generating Company.
    Filed Date: 8/23/18.
    Accession Number: 20180823-5160.
    Comments Due: 5 p.m. ET 9/4/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: August 24, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-18956 Filed 8-30-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.