Combined Notice of Filings, 43862-43863 [2018-18603]
Download as PDF
43862
Federal Register / Vol. 83, No. 167 / Tuesday, August 28, 2018 / Notices
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on September 10, 2018.
Dated: August 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18597 Filed 8–27–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14885–000]
daltland on DSKBBV9HB2PROD with NOTICES
Midwest Energy Recycling, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On July 17, 2018, Midwest Energy
Recycling, LLC filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Chippewa County Pumped
Storage Project to be located near the
Minnesota River and the city of Granite
Falls, in Chippewa County, Minnesota.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
VerDate Sep<11>2014
20:00 Aug 27, 2018
Jkt 244001
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A new circular 100acre rockfill embankment (upper
reservoir) having a total storage capacity
of 3,000 acre-feet with a maximum pond
elevation level of 1080 feet mean sea
level; (2) a new 2,400-foot by 1,425-foot
rectangular lower reservoir with a total
storage capacity of 3,300 acre-feet; (3) a
new 100-foot-diameter, reinforced
concrete (morning glory type) intake
connected to a vertical 2,500-foot-long
by 18-foot-diameter steel penstock; (4) a
new 200-foot-long by 70-foot-wide by
40-foot-high reinforced concrete
powerhouse containing two new 333megawatt (MW) reversible pump turbine
units with a total plant rating of 666
MW; (5) a new 50-foot-wide, 240-footlong, 40-foot-high transformer gallery;
(6); a new 200 to 1,000-foot-long, 230kilovolt transmission line extending
from the transformer gallery to an
existing substation (the point of
interconnection); and (7) appurtenant
facilities. The estimated annual
generation of the Chippewa County
Pumped Storage Project would be 1,450
gigawatt-hours.
Applicant Contact: Mr. Douglas A.
Spaulding, Nelson Energy, LLC, 8441
Wayzata Boulevard, Suite 101 Golden
Valley, MN 55426; phone: (952) 544–
8133.
FERC Contact: Tyrone Williams;
phone: (202) 502–6331.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14885–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14885) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: August 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18605 Filed 8–27–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP18–1066–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: TCO
MXP August Agreement Filing to be
effective 9/18/2018.
Filed Date: 8/20/18.
Accession Number: 20180820–5000.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1067–000.
Applicants: WBI Energy
Transmission, Inc.
Description: § 4(d) Rate Filing: 2018
Negotiated Rate Filing SA IT–836 to be
effective 9/1/2018.
Filed Date: 8/21/18.
Accession Number: 20180821–5030.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1068–000.
Applicants: Colorado Interstate Gas
Company, L.L.C.
Description: 2018 Penalties Assessed
Compliance Filing.
Filed Date: 8/20/18.
Accession Number: 20180820–5186.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1069–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—PAL Agreements to
be effective 8/1/2018.
Filed Date: 8/21/18.
Accession Number: 20180821–5089.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18–1070–000.
Applicants: ANR Pipeline Company.
E:\FR\FM\28AUN1.SGM
28AUN1
Federal Register / Vol. 83, No. 167 / Tuesday, August 28, 2018 / Notices
009; ER15–1873–009; ER15–2205–009;
ER18–1197–002; ER18–1470–002;
ER18–471–003; ER18–472–003; ER18–
491–002; ER18–492–002; ER18–494–
002; ER18–784–003.
Applicants: Beech Ridge Energy LLC,
Beech Ridge Energy II LLC, Beech Ridge
Energy II Holdings LLC, Beech Ridge
Energy Storage LLC, Bishop Hill Energy
III LLC, Buckeye Wind Energy LLC,
Camilla Solar Energy LLC, Forward
Energy LLC, Grand Ridge Energy LLC,
Grand Ridge Energy II LLC, Grand Ridge
Energy III LLC, Grand Ridge Energy IV
LLC, Grand Ridge Energy V LLC, Grand
Ridge Energy Storage LLC, Gratiot
County Wind LLC, Gratiot County Wind
II LLC, Hardin Wind Energy, LLC,
Hardin Wind Energy Holdings LLC,
Invenergy TN LLC, Judith Gap Energy
LLC, Pine River Wind Energy LLC,
Prairie Breeze Wind Energy II LLC,
Prairie Breeze Wind Energy III LLC,
Sheldon Energy LLC, Spring Canyon
Energy LLC, States Edge Wind I LLC,
States Edge Wind I Holdings LLC, Stony
Creek Energy LLC, Upstream Wind
Energy LLC, Vantage Wind Energy LLC,
Dated: August 22, 2018.
Willow Creek Energy LLC, Wolverine
Nathaniel J. Davis, Sr.,
Creek Energy LLC.
Deputy Secretary.
Description: Notice of Change in Facts
[FR Doc. 2018–18603 Filed 8–27–18; 8:45 am]
Under Market-Based Rate Authority of
BILLING CODE 6717–01–P
Beech Ridge Energy LLC, et al.
Filed Date: 8/22/18.
Accession Number: 20180822–5089.
DEPARTMENT OF ENERGY
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18–2273–000.
Federal Energy Regulatory
Applicants: Midcontinent
Commission
Independent System Operator, Inc.
Description: Request for Waiver of
Combined Notice of Filings #1
Midcontinent Independent System
Take notice that the Commission
Operator, Inc.
received the following electric corporate
Filed Date: 8/21/18.
filings:
Accession Number: 20180821–5115.
Comments Due: 5 p.m. ET 9/11/18.
Docket Numbers: EC18–140–000.
Applicants: Pine River Wind Energy
Docket Numbers: ER18–2274–000.
LLC, DTE Electric Company.
Applicants: Public Service Company
Description: Application for
of New Mexico.
Authorization Under Section 203 of the
Description: Notice of cancellation of
Federal Power Act, et al. of Pine River
Interconnection Service Agreement No.
Wind Energy LLC, et al.
208 of Public Service Company of New
Filed Date: 8/22/18.
Mexico.
Accession Number: 20180822–5076.
Filed Date: 8/22/18.
Comments Due: 5 p.m. ET 9/12/18.
Accession Number: 20180822–5048.
Comments Due: 5 p.m. ET 9/12/18.
Take notice that the Commission
received the following electric rate
Docket Numbers: ER18–2275–000.
filings:
Applicants: Midcontinent
Independent System Operator, Inc.
Docket Numbers: ER10–2137–021;
Description: § 205(d) Rate Filing:
ER10–2124–019; ER10–2125–020;
2018–08–22_SA 3159 ATC–WEPCo
ER10–2127–018; ER10–2128–019;
Project Commitment Agreement
ER10–2130–020; ER10–2131–021;
(Berryville) to be effective 10/22/2018.
ER10–2132–019; ER10–2133–020;
Filed Date: 8/22/18.
ER10–2138–021; ER10–2139–021;
Accession Number: 20180822–5052.
ER10–2140–021; ER10–2141–021;
Comments Due: 5 p.m. ET 9/12/18.
ER10–2764–019; ER11–3872–021;
ER11–4044–021; ER11–4046–020;
Docket Numbers: ER18–2276–000.
Applicants: Midcontinent
ER12–164–020; ER14–2187–015; ER14–
2798–013; ER14–2799–013; ER15–1041– Independent System Operator, Inc.
daltland on DSKBBV9HB2PROD with NOTICES
Description: Compliance filing
Request for Waiver Grand Chenier.
Filed Date: 8/21/18.
Accession Number: 20180821–5111.
Comments Due: 5 p.m. ET 8/28/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
20:00 Aug 27, 2018
Jkt 244001
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
43863
Description: § 205(d) Rate Filing:
2018–08–22_SA 3160 ATC–WEPCo
Project Commitment Agreement
(Somers) to be effective 10/22/2018.
Filed Date: 8/22/18.
Accession Number: 20180822–5065.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18–2277–000.
Applicants: Appalachian Power
Company, Indiana Michigan Power
Company, Kentucky Power Company,
Kingsport Power Company, Ohio Power
Company, Wheeling Power Company,
AEP Appalachian Transmission
Company, Inc., AEP Indiana Michigan
Transmission Company, Inc., AEP
Kentucky Transmission Company, Inc.,
AEP Ohio Transmission Company, Inc.,
AEP West Virginia Transmission
Company, Inc., PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: AEP
et al submits revisions to OATT, Att. H–
14B and H–20B re Depreciation Rate to
be effective 10/22/2018.
Filed Date: 8/22/18.
Accession Number: 20180822–5079.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18–2278–000.
Applicants: Louisville Gas and
Electric Company.
Description: § 205(d) Rate Filing: Joint
Rate Sched FERC No. 509 IMEA Meter
Installation Agmt to be effective 8/23/
2018.
Filed Date: 8/22/18.
Accession Number: 20180822–5083.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18–2279–000.
Applicants: Kentucky Utilities
Company.
Description: § 205(d) Rate Filing: LGE
and KU Joint Rate Schedule FERC No.
509 IMEA Meter Install Agmt to be
effective 8/23/2018.
Filed Date: 8/22/18.
Accession Number: 20180822–5088.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18–2280–000.
Applicants: Alliant Energy Corporate
Services, Inc.
Description: § 205(d) Rate Filing:
AECS Updated Rate Schedule 2 to be
effective 10/22/2018.
Filed Date: 8/22/18.
Accession Number: 20180822–5101.
Comments Due: 5 p.m. ET 9/12/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
E:\FR\FM\28AUN1.SGM
28AUN1
Agencies
[Federal Register Volume 83, Number 167 (Tuesday, August 28, 2018)]
[Notices]
[Pages 43862-43863]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18603]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP18-1066-000.
Applicants: Columbia Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: TCO MXP August Agreement
Filing to be effective 9/18/2018.
Filed Date: 8/20/18.
Accession Number: 20180820-5000.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18-1067-000.
Applicants: WBI Energy Transmission, Inc.
Description: Sec. 4(d) Rate Filing: 2018 Negotiated Rate Filing SA
IT-836 to be effective 9/1/2018.
Filed Date: 8/21/18.
Accession Number: 20180821-5030.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18-1068-000.
Applicants: Colorado Interstate Gas Company, L.L.C.
Description: 2018 Penalties Assessed Compliance Filing.
Filed Date: 8/20/18.
Accession Number: 20180820-5186.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18-1069-000.
Applicants: Texas Eastern Transmission, LP.
Description: Sec. 4(d) Rate Filing: Negotiated Rates--PAL
Agreements to be effective 8/1/2018.
Filed Date: 8/21/18.
Accession Number: 20180821-5089.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: RP18-1070-000.
Applicants: ANR Pipeline Company.
[[Page 43863]]
Description: Compliance filing Request for Waiver Grand Chenier.
Filed Date: 8/21/18.
Accession Number: 20180821-5111.
Comments Due: 5 p.m. ET 8/28/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-18603 Filed 8-27-18; 8:45 am]
BILLING CODE 6717-01-P