ECOsponsible, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 43866 [2018-18600]

Download as PDF daltland on DSKBBV9HB2PROD with NOTICES 43866 Federal Register / Vol. 83, No. 167 / Tuesday, August 28, 2018 / Notices issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s VerDate Sep<11>2014 20:00 Aug 27, 2018 Jkt 244001 environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on September 12, 2018. Dated: August 22, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–18604 Filed 8–27–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14880–001] ECOsponsible, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 15, 2018, ECOsponsible, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of hydropower at the Mount Morris Power Dam located on the Genesee River, near the town of Leicester, Livingston County, New York. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) An existing 30-foothigh, 334-foot-long concrete gravity dam; (2) an existing reservoir with a storage capacity of 250 acre-feet at a normal maximum surface elevation of 579.1 feet mean sea level; (3) an existing 16-foot-wide by 30-foot-long concrete PO 00000 Frm 00025 Fmt 4703 Sfmt 9990 masonry powerhouse containing two new submersible turbines each with a rated capacity of 394 kilowatts (kW) (4) a new Hydrodynamic Screw turbine with a rated capacity of 62 kW to be located on the 18-foot-long concrete spillway next to the powerhouse; (5) a new 75-foot-long transmission line connecting the powerhouse to a nearby 15-kilovolt grid interconnection point; and (6) appurtenant facilities. The proposed project would have an average annual generation of 5,700 megawatthours. Applicant Contact: Mr. Dennis Ryan, Manager, ECOsponsible, LLC, P.O. Box 114, West Falls, NY 14170; phone: (716) 222–2188. FERC Contact: Monir Chowdhury; phone: (202) 502–6736. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14880–001. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14880) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: August 22, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–18600 Filed 8–27–18; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\28AUN1.SGM 28AUN1

Agencies

[Federal Register Volume 83, Number 167 (Tuesday, August 28, 2018)]
[Notices]
[Page 43866]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18600]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14880-001]


ECOsponsible, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On June 15, 2018, ECOsponsible, LLC, filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of hydropower at the Mount 
Morris Power Dam located on the Genesee River, near the town of 
Leicester, Livingston County, New York. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of the following: (1) An 
existing 30-foot-high, 334-foot-long concrete gravity dam; (2) an 
existing reservoir with a storage capacity of 250 acre-feet at a normal 
maximum surface elevation of 579.1 feet mean sea level; (3) an existing 
16-foot-wide by 30-foot-long concrete masonry powerhouse containing two 
new submersible turbines each with a rated capacity of 394 kilowatts 
(kW) (4) a new Hydrodynamic Screw turbine with a rated capacity of 62 
kW to be located on the 18-foot-long concrete spillway next to the 
powerhouse; (5) a new 75-foot-long transmission line connecting the 
powerhouse to a nearby 15-kilovolt grid interconnection point; and (6) 
appurtenant facilities. The proposed project would have an average 
annual generation of 5,700 megawatt-hours.
    Applicant Contact: Mr. Dennis Ryan, Manager, ECOsponsible, LLC, 
P.O. Box 114, West Falls, NY 14170; phone: (716) 222-2188.
    FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14880-001.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14880) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: August 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-18600 Filed 8-27-18; 8:45 am]
BILLING CODE 6717-01-P