ECOsponsible, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 43866 [2018-18600]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
43866
Federal Register / Vol. 83, No. 167 / Tuesday, August 28, 2018 / Notices
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
VerDate Sep<11>2014
20:00 Aug 27, 2018
Jkt 244001
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on September 12, 2018.
Dated: August 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18604 Filed 8–27–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14880–001]
ECOsponsible, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 15, 2018, ECOsponsible, LLC,
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of hydropower at
the Mount Morris Power Dam located
on the Genesee River, near the town of
Leicester, Livingston County, New York.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) An existing 30-foothigh, 334-foot-long concrete gravity
dam; (2) an existing reservoir with a
storage capacity of 250 acre-feet at a
normal maximum surface elevation of
579.1 feet mean sea level; (3) an existing
16-foot-wide by 30-foot-long concrete
PO 00000
Frm 00025
Fmt 4703
Sfmt 9990
masonry powerhouse containing two
new submersible turbines each with a
rated capacity of 394 kilowatts (kW) (4)
a new Hydrodynamic Screw turbine
with a rated capacity of 62 kW to be
located on the 18-foot-long concrete
spillway next to the powerhouse; (5) a
new 75-foot-long transmission line
connecting the powerhouse to a nearby
15-kilovolt grid interconnection point;
and (6) appurtenant facilities. The
proposed project would have an average
annual generation of 5,700 megawatthours.
Applicant Contact: Mr. Dennis Ryan,
Manager, ECOsponsible, LLC, P.O. Box
114, West Falls, NY 14170; phone: (716)
222–2188.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14880–001.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14880) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: August 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18600 Filed 8–27–18; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\28AUN1.SGM
28AUN1
Agencies
[Federal Register Volume 83, Number 167 (Tuesday, August 28, 2018)]
[Notices]
[Page 43866]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18600]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14880-001]
ECOsponsible, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On June 15, 2018, ECOsponsible, LLC, filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of hydropower at the Mount
Morris Power Dam located on the Genesee River, near the town of
Leicester, Livingston County, New York. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following: (1) An
existing 30-foot-high, 334-foot-long concrete gravity dam; (2) an
existing reservoir with a storage capacity of 250 acre-feet at a normal
maximum surface elevation of 579.1 feet mean sea level; (3) an existing
16-foot-wide by 30-foot-long concrete masonry powerhouse containing two
new submersible turbines each with a rated capacity of 394 kilowatts
(kW) (4) a new Hydrodynamic Screw turbine with a rated capacity of 62
kW to be located on the 18-foot-long concrete spillway next to the
powerhouse; (5) a new 75-foot-long transmission line connecting the
powerhouse to a nearby 15-kilovolt grid interconnection point; and (6)
appurtenant facilities. The proposed project would have an average
annual generation of 5,700 megawatt-hours.
Applicant Contact: Mr. Dennis Ryan, Manager, ECOsponsible, LLC,
P.O. Box 114, West Falls, NY 14170; phone: (716) 222-2188.
FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14880-001.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14880) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: August 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-18600 Filed 8-27-18; 8:45 am]
BILLING CODE 6717-01-P