Combined Notice of Filings #1, 43863-43864 [2018-18599]
Download as PDF
Federal Register / Vol. 83, No. 167 / Tuesday, August 28, 2018 / Notices
009; ER15–1873–009; ER15–2205–009;
ER18–1197–002; ER18–1470–002;
ER18–471–003; ER18–472–003; ER18–
491–002; ER18–492–002; ER18–494–
002; ER18–784–003.
Applicants: Beech Ridge Energy LLC,
Beech Ridge Energy II LLC, Beech Ridge
Energy II Holdings LLC, Beech Ridge
Energy Storage LLC, Bishop Hill Energy
III LLC, Buckeye Wind Energy LLC,
Camilla Solar Energy LLC, Forward
Energy LLC, Grand Ridge Energy LLC,
Grand Ridge Energy II LLC, Grand Ridge
Energy III LLC, Grand Ridge Energy IV
LLC, Grand Ridge Energy V LLC, Grand
Ridge Energy Storage LLC, Gratiot
County Wind LLC, Gratiot County Wind
II LLC, Hardin Wind Energy, LLC,
Hardin Wind Energy Holdings LLC,
Invenergy TN LLC, Judith Gap Energy
LLC, Pine River Wind Energy LLC,
Prairie Breeze Wind Energy II LLC,
Prairie Breeze Wind Energy III LLC,
Sheldon Energy LLC, Spring Canyon
Energy LLC, States Edge Wind I LLC,
States Edge Wind I Holdings LLC, Stony
Creek Energy LLC, Upstream Wind
Energy LLC, Vantage Wind Energy LLC,
Dated: August 22, 2018.
Willow Creek Energy LLC, Wolverine
Nathaniel J. Davis, Sr.,
Creek Energy LLC.
Deputy Secretary.
Description: Notice of Change in Facts
[FR Doc. 2018–18603 Filed 8–27–18; 8:45 am]
Under Market-Based Rate Authority of
BILLING CODE 6717–01–P
Beech Ridge Energy LLC, et al.
Filed Date: 8/22/18.
Accession Number: 20180822–5089.
DEPARTMENT OF ENERGY
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18–2273–000.
Federal Energy Regulatory
Applicants: Midcontinent
Commission
Independent System Operator, Inc.
Description: Request for Waiver of
Combined Notice of Filings #1
Midcontinent Independent System
Take notice that the Commission
Operator, Inc.
received the following electric corporate
Filed Date: 8/21/18.
filings:
Accession Number: 20180821–5115.
Comments Due: 5 p.m. ET 9/11/18.
Docket Numbers: EC18–140–000.
Applicants: Pine River Wind Energy
Docket Numbers: ER18–2274–000.
LLC, DTE Electric Company.
Applicants: Public Service Company
Description: Application for
of New Mexico.
Authorization Under Section 203 of the
Description: Notice of cancellation of
Federal Power Act, et al. of Pine River
Interconnection Service Agreement No.
Wind Energy LLC, et al.
208 of Public Service Company of New
Filed Date: 8/22/18.
Mexico.
Accession Number: 20180822–5076.
Filed Date: 8/22/18.
Comments Due: 5 p.m. ET 9/12/18.
Accession Number: 20180822–5048.
Comments Due: 5 p.m. ET 9/12/18.
Take notice that the Commission
received the following electric rate
Docket Numbers: ER18–2275–000.
filings:
Applicants: Midcontinent
Independent System Operator, Inc.
Docket Numbers: ER10–2137–021;
Description: § 205(d) Rate Filing:
ER10–2124–019; ER10–2125–020;
2018–08–22_SA 3159 ATC–WEPCo
ER10–2127–018; ER10–2128–019;
Project Commitment Agreement
ER10–2130–020; ER10–2131–021;
(Berryville) to be effective 10/22/2018.
ER10–2132–019; ER10–2133–020;
Filed Date: 8/22/18.
ER10–2138–021; ER10–2139–021;
Accession Number: 20180822–5052.
ER10–2140–021; ER10–2141–021;
Comments Due: 5 p.m. ET 9/12/18.
ER10–2764–019; ER11–3872–021;
ER11–4044–021; ER11–4046–020;
Docket Numbers: ER18–2276–000.
Applicants: Midcontinent
ER12–164–020; ER14–2187–015; ER14–
2798–013; ER14–2799–013; ER15–1041– Independent System Operator, Inc.
daltland on DSKBBV9HB2PROD with NOTICES
Description: Compliance filing
Request for Waiver Grand Chenier.
Filed Date: 8/21/18.
Accession Number: 20180821–5111.
Comments Due: 5 p.m. ET 8/28/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
20:00 Aug 27, 2018
Jkt 244001
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
43863
Description: § 205(d) Rate Filing:
2018–08–22_SA 3160 ATC–WEPCo
Project Commitment Agreement
(Somers) to be effective 10/22/2018.
Filed Date: 8/22/18.
Accession Number: 20180822–5065.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18–2277–000.
Applicants: Appalachian Power
Company, Indiana Michigan Power
Company, Kentucky Power Company,
Kingsport Power Company, Ohio Power
Company, Wheeling Power Company,
AEP Appalachian Transmission
Company, Inc., AEP Indiana Michigan
Transmission Company, Inc., AEP
Kentucky Transmission Company, Inc.,
AEP Ohio Transmission Company, Inc.,
AEP West Virginia Transmission
Company, Inc., PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: AEP
et al submits revisions to OATT, Att. H–
14B and H–20B re Depreciation Rate to
be effective 10/22/2018.
Filed Date: 8/22/18.
Accession Number: 20180822–5079.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18–2278–000.
Applicants: Louisville Gas and
Electric Company.
Description: § 205(d) Rate Filing: Joint
Rate Sched FERC No. 509 IMEA Meter
Installation Agmt to be effective 8/23/
2018.
Filed Date: 8/22/18.
Accession Number: 20180822–5083.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18–2279–000.
Applicants: Kentucky Utilities
Company.
Description: § 205(d) Rate Filing: LGE
and KU Joint Rate Schedule FERC No.
509 IMEA Meter Install Agmt to be
effective 8/23/2018.
Filed Date: 8/22/18.
Accession Number: 20180822–5088.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18–2280–000.
Applicants: Alliant Energy Corporate
Services, Inc.
Description: § 205(d) Rate Filing:
AECS Updated Rate Schedule 2 to be
effective 10/22/2018.
Filed Date: 8/22/18.
Accession Number: 20180822–5101.
Comments Due: 5 p.m. ET 9/12/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
E:\FR\FM\28AUN1.SGM
28AUN1
43864
Federal Register / Vol. 83, No. 167 / Tuesday, August 28, 2018 / Notices
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18599 Filed 8–27–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13318–003]
daltland on DSKBBV9HB2PROD with NOTICES
Swan Lake North Hydro LLC; Notice of
Availability of the Draft Environmental
Impact Statement for the Swan Lake
North Pumped Storage Project and
Intention To Hold Public Meeting
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for license for the Swan
Lake North Pumped Storage
Hydroelectric Project, located about 11
miles northeast of Klamath Falls in
Klamath County, Oregon, and has
prepared a draft Environmental Impact
Statement (EIS) for the project. The
project would occupy 730 acres of
federal lands administered by the U.S.
Bureau of Land Management and the
U.S. Bureau of Reclamation, state lands,
and private lands.
The draft EIS contains the staff’s
analysis of the potential environmental
impacts of the project and concludes
that licensing the project, with
appropriate environmental protective
measures, would not constitute a major
federal action that would significantly
affect the quality of the human
environment.
A copy of the draft EIS is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
VerDate Sep<11>2014
20:00 Aug 27, 2018
Jkt 244001
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
45 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–13318–003.
Anyone may intervene in this
proceeding based on this draft EIS (18
CFR 380.10). You must file your request
to intervene as specified above.1
In addition to or in lieu of sending
written comments, you are invited to
attend a public meeting that will be held
to receive comments on the draft EIS.
The time and location of the meeting is
as follows:
Date: September 26, 2018.
Time: 7:00–9:00 p.m.
Place: Mt. Mazama Room, College
Union, Oregon Institute of Technology.
Address: 3201 Campus Drive,
Klamath Falls, OR 97601.
At this meeting, resource agency
personnel and other interested persons
will have the opportunity to provide
oral and written comments and
recommendations regarding the draft
EIS. The meeting will be recorded by a
court reporter, and all statements (verbal
and written) will become part of the
Commission’s public record for the
project. This meeting is posted on the
Commission’s calendar located at https://
www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
For further information, contact
Dianne Rodman at (202) 502–6077 or
dianne.rodman@ferc.gov.
1 Interventions may also be filed electronically via
the internet in lieu of paper. See the previous
discussion on filing comments electronically.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Dated: August 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18598 Filed 8–27–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2212–051]
Domtar Paper Company, LLC; Notice
of Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Federal Energy Regulatory
Commission (Commission) and is
available for public inspection:
a. Type of Application: Non-project
use of project lands and water.
b. Project No: 2212–051.
c. Date Filed: July 20, 2018 and
supplemented August 16, 2018.
d. Applicant: Domtar Paper Company,
LLC (licensee).
e. Name of Project: Rothschild
Hydroelectric Project.
f. Location: Wisconsin River and Big
Rib River, Marathon County, Wisconsin.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Steve Lewens,
Environmental Health & Safety
Manager, Domtar Paper Company, 200
North Grand Ave., Rothschild, WI
54474; phone (715) 359–3101.
i. FERC Contact: Ms. Andrea Claros at
202–502–8171, or andrea.claros@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file motions to intervene,
protests, and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2212–051.
E:\FR\FM\28AUN1.SGM
28AUN1
Agencies
[Federal Register Volume 83, Number 167 (Tuesday, August 28, 2018)]
[Notices]
[Pages 43863-43864]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18599]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-140-000.
Applicants: Pine River Wind Energy LLC, DTE Electric Company.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Pine River Wind Energy LLC, et al.
Filed Date: 8/22/18.
Accession Number: 20180822-5076.
Comments Due: 5 p.m. ET 9/12/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2137-021; ER10-2124-019; ER10-2125-020; ER10-
2127-018; ER10-2128-019; ER10-2130-020; ER10-2131-021; ER10-2132-019;
ER10-2133-020; ER10-2138-021; ER10-2139-021; ER10-2140-021; ER10-2141-
021; ER10-2764-019; ER11-3872-021; ER11-4044-021; ER11-4046-020; ER12-
164-020; ER14-2187-015; ER14-2798-013; ER14-2799-013; ER15-1041-009;
ER15-1873-009; ER15-2205-009; ER18-1197-002; ER18-1470-002; ER18-471-
003; ER18-472-003; ER18-491-002; ER18-492-002; ER18-494-002; ER18-784-
003.
Applicants: Beech Ridge Energy LLC, Beech Ridge Energy II LLC,
Beech Ridge Energy II Holdings LLC, Beech Ridge Energy Storage LLC,
Bishop Hill Energy III LLC, Buckeye Wind Energy LLC, Camilla Solar
Energy LLC, Forward Energy LLC, Grand Ridge Energy LLC, Grand Ridge
Energy II LLC, Grand Ridge Energy III LLC, Grand Ridge Energy IV LLC,
Grand Ridge Energy V LLC, Grand Ridge Energy Storage LLC, Gratiot
County Wind LLC, Gratiot County Wind II LLC, Hardin Wind Energy, LLC,
Hardin Wind Energy Holdings LLC, Invenergy TN LLC, Judith Gap Energy
LLC, Pine River Wind Energy LLC, Prairie Breeze Wind Energy II LLC,
Prairie Breeze Wind Energy III LLC, Sheldon Energy LLC, Spring Canyon
Energy LLC, States Edge Wind I LLC, States Edge Wind I Holdings LLC,
Stony Creek Energy LLC, Upstream Wind Energy LLC, Vantage Wind Energy
LLC, Willow Creek Energy LLC, Wolverine Creek Energy LLC.
Description: Notice of Change in Facts Under Market-Based Rate
Authority of Beech Ridge Energy LLC, et al.
Filed Date: 8/22/18.
Accession Number: 20180822-5089.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18-2273-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Request for Waiver of Midcontinent Independent System
Operator, Inc.
Filed Date: 8/21/18.
Accession Number: 20180821-5115.
Comments Due: 5 p.m. ET 9/11/18.
Docket Numbers: ER18-2274-000.
Applicants: Public Service Company of New Mexico.
Description: Notice of cancellation of Interconnection Service
Agreement No. 208 of Public Service Company of New Mexico.
Filed Date: 8/22/18.
Accession Number: 20180822-5048.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18-2275-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-08-22_SA 3159 ATC-WEPCo
Project Commitment Agreement (Berryville) to be effective 10/22/2018.
Filed Date: 8/22/18.
Accession Number: 20180822-5052.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18-2276-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-08-22_SA 3160 ATC-WEPCo
Project Commitment Agreement (Somers) to be effective 10/22/2018.
Filed Date: 8/22/18.
Accession Number: 20180822-5065.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18-2277-000.
Applicants: Appalachian Power Company, Indiana Michigan Power
Company, Kentucky Power Company, Kingsport Power Company, Ohio Power
Company, Wheeling Power Company, AEP Appalachian Transmission Company,
Inc., AEP Indiana Michigan Transmission Company, Inc., AEP Kentucky
Transmission Company, Inc., AEP Ohio Transmission Company, Inc., AEP
West Virginia Transmission Company, Inc., PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: AEP et al submits revisions
to OATT, Att. H-14B and H-20B re Depreciation Rate to be effective 10/
22/2018.
Filed Date: 8/22/18.
Accession Number: 20180822-5079.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18-2278-000.
Applicants: Louisville Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: Joint Rate Sched FERC No.
509 IMEA Meter Installation Agmt to be effective 8/23/2018.
Filed Date: 8/22/18.
Accession Number: 20180822-5083.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18-2279-000.
Applicants: Kentucky Utilities Company.
Description: Sec. 205(d) Rate Filing: LGE and KU Joint Rate
Schedule FERC No. 509 IMEA Meter Install Agmt to be effective 8/23/
2018.
Filed Date: 8/22/18.
Accession Number: 20180822-5088.
Comments Due: 5 p.m. ET 9/12/18.
Docket Numbers: ER18-2280-000.
Applicants: Alliant Energy Corporate Services, Inc.
Description: Sec. 205(d) Rate Filing: AECS Updated Rate Schedule 2
to be effective 10/22/2018.
Filed Date: 8/22/18.
Accession Number: 20180822-5101.
Comments Due: 5 p.m. ET 9/12/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date.
[[Page 43864]]
Protests may be considered, but intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-18599 Filed 8-27-18; 8:45 am]
BILLING CODE 6717-01-P