Notice of Schedule for Environmental Review of the Dominion Energy Transmission, Inc. Sweden Valley Project, 43667-43668 [2018-18464]
Download as PDF
amozie on DSK3GDR082PROD with NOTICES1
Federal Register / Vol. 83, No. 166 / Monday, August 27, 2018 / Notices
IA–440–0.0.0-Filing to be effective 10/
17/2018.
Filed Date: 8/17/18.
Accession Number: 20180817–5023.
Comments Due: 5 p.m. ET 9/7/18.
Docket Numbers: ER18–2236–000.
Applicants: Parrey, LLC.
Description: § 205(d) Rate Filing:
Amended and Restated Henrietta
Shared Facilities Agreement No. 1
Filing to be effective 8/17/2018.
Filed Date: 8/17/18.
Accession Number: 20180817–5043.
Comments Due: 5 p.m. ET 9/7/18.
Docket Numbers: ER18–2237–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, SA No. 2826,
Queue No. None (Consent) to be
effective 6/1/2011.
Filed Date: 8/17/18.
Accession Number: 20180817–5044.
Comments Due: 5 p.m. ET 9/7/18.
Docket Numbers: ER18–2238–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–08–17_SA 3154 ATC–ACEC
Project Commitment Agreement
(Hancock) to be effective 10/17/2018.
Filed Date: 8/17/18.
Accession Number: 20180817–5050.
Comments Due: 5 p.m. ET 9/7/18.
Docket Numbers: ER18–2239–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–08–17_SA 3155 ATC–ACEC
Project Commitment Agreement
(Springwater) to be effective 10/17/
2018.
Filed Date: 8/17/18.
Accession Number: 20180817–5052.
Comments Due: 5 p.m. ET 9/7/18.
Docket Numbers: ER18–2240–000.
Applicants: Yavi Energy, LLC.
Description: Baseline eTariff Filing:
MBR Application to be effective 10/1/
2018.
Filed Date: 8/17/18.
Accession Number: 20180817–5073.
Comments Due: 5 p.m. ET 9/7/18.
Docket Numbers: ER18–2241–000.
Applicants: Garnet Wind, LLC.
Description: Baseline eTariff Filing:
MBR Application to be effective 10/1/
2018.
Filed Date: 8/17/18.
Accession Number: 20180817–5080.
Comments Due: 5 p.m. ET 9/7/18.
Docket Numbers: ER18–2242–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2018–08–17 Energy Storage and
Distributed Energy Resource Phase 2
Amendment to be effective 11/1/2018.
VerDate Sep<11>2014
17:51 Aug 24, 2018
Jkt 244001
Filed Date: 8/17/18.
Accession Number: 20180817–5085.
Comments Due: 5 p.m. ET 9/7/18.
Docket Numbers: ER18–2243–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Morgan Transformer Project Cost
Allocation (Part 1) to be effective 10/16/
2018.
Filed Date: 8/17/18.
Accession Number: 20180817–5141.
Comments Due: 5 p.m. ET 9/7/18.
Docket Numbers: ER18–2244–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 217, Exhibit B Revisions
to be effective 10/17/2018.
Filed Date: 8/17/18.
Accession Number: 20180817–5142.
Comments Due: 5 p.m. ET 9/7/18.
Docket Numbers: ER18–2245–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Morgan Transformer Project Cost
Allocation (Part 2) to be effective 10/16/
2018.
Filed Date: 8/17/18.
Accession Number: 20180817–5143.
Comments Due: 5 p.m. ET 9/7/18.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES18–56–000.
Applicants: GridLiance High Plains
LLC.
Description: Application for
Authorization under Section 204 of the
Federal Power Act of GridLiance High
Plains LLC.
Filed Date: 8/16/18.
Accession Number: 20180816–5159.
Comments Due: 5 p.m. ET 9/6/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
43667
Dated: August 17, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18420 Filed 8–24–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–45–000]
Notice of Schedule for Environmental
Review of the Dominion Energy
Transmission, Inc. Sweden Valley
Project
On January 10, 2018, Dominion
Energy Transmission, Inc. (Dominion)
filed an application in Docket No.
CP18–45–000 requesting a Certificate of
Public Convenience and Necessity
pursuant to section 7(c) of the Natural
Gas Act to construct and operate certain
natural gas pipeline facilities. The
proposed project is known as the
Sweden Valley Project (Project), and
involves the construction and operation
of facilities located in Licking and
Tuscarawas Counties, Ohio and
Armstrong, Clinton, and Greene
Counties, Pennsylvania. The Project
would enable Dominion to provide
120,000 dekatherms per day of firm
transportation service from
Pennsylvania to Ohio for delivery to
Tennessee Gas Pipeline Company, LLC.
On January 24, 2018, The Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—August 31, 2018
90-Day Federal Authorization Decision
Deadline—November 29, 2018
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Dominion proposes to construct and
operate the following facilities Ohio:
construction of 1.7 miles 20-inchdiameter lateral to the new Port
E:\FR\FM\27AUN1.SGM
27AUN1
43668
Federal Register / Vol. 83, No. 166 / Monday, August 27, 2018 / Notices
Washington Metering and Regulation
(M&R) delivery point in Tuscarawas
County, re-wheel compressors on three
existing centrifugal compression sets at
Dominion’s existing Newark
Compressor Station in Licking County,
and construction of a pig launcher/
receiver south of the existing Gilmore
M&R station in Tuscarawas County.
In addition, Dominion proposes to
construct and operate the following
facilities in Pennsylvania: 3.2 miles of
24-inch-diameter pipeline looping in
Greene County (TL–654 PA Loop),
installation of regulation equipment at
Dominion’s existing South Bend
Compressor Station in Armstrong
County and Leidy M&R Station in
Clinton County, and new mainline gate
valves at the proposed TL–654 PA Loop
in Greene County.
amozie on DSK3GDR082PROD with NOTICES1
Background
On March 13, 2018, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Sweden Valley Project and
Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local governmental
representatives and agencies; elected
officials; environmental and public
interest groups; potentially interested
Indian tribes; and local libraries and
newspapers. In response to the NOI, we
received a total of 15 comments letters.
The comments addressed support for
the project, purpose and need, water
resources and wetlands, geology,
vegetation, wildlife, fisheries,
threatened and endangered species,
land use and recreation, air quality/
greenhouse gas emissions, alternative
analysis, tribal cultural resources and
the National Historic Preservation Act,
and cumulative impacts. All substantive
comments will be addressed in the EA.
The U.S. Army Corps of Engineers is
a federal cooperating agency who is
assisting us in preparing this EA
because they have jurisdiction by law or
special expertise with respect to
environmental impacts associated with
Dominion’s proposal.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
VerDate Sep<11>2014
17:51 Aug 24, 2018
Jkt 244001
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e. CP18–45), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: August 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18464 Filed 8–24–18; 8:45 am]
BILLING CODE 6717–01–P
request information or clarification on
written submissions as necessary to
understand the matters in dispute. The
Panel will limit all input that it receives
to the specific studies or information in
dispute and will focus on the
applicability of such studies or
information to the study criteria
stipulated in 18 CFR 5.9(b). If the
number of participants wishing to speak
creates time constraints, the Panel may,
at its discretion, limit the speaking time
for each participant.
The schedule for completing the
Formal Study Dispute Process follows:
August 21, 2018—Panel Convenes
August 28, 2018—Panel submits
questions to Parties
September 6, 2018—Parties submit
written comments, answers Panel
questions
September 11, 2018—Technical
Conference Call
September 20, 2018—Panel submits
findings to Director Office of Energy
Projects
DEPARTMENT OF ENERGY
Technical Conference Call
Federal Energy Regulatory
Commission
Date: Tuesday September 11, 2018
Time: 10:00 a.m.–12:00 p.m. (EST)
[Project No. 4784–095]
Conference Call-in Information:
Topsham Hydro Partners Limited
Partnership Pejepscot Hydroelectric
Project; Notice of Dispute Resolution
Panel Meeting and Technical
Conference, and Revised Schedule
On August 21, 2018, Commission
staff, in response to the filing of a notice
of study dispute by the U.S. National
Marine Fisheries Service (NMFS) on
August 1, 2018, convened a single threeperson Dispute Resolution Panel (Panel)
pursuant to 18 CFR 5.14(d).
The Panel will hold a technical
conference, via conference call, at the
time identified below. The technical
conference will address the study
dispute identified in Enclosure A of the
August 1, 2018 filing which includes
predation by non-native predators on
native anadromous fish, including the
endangered Atlantic salmon. The panel
will not address the study comments
identified in Enclosure B of the August
1, 2018 filing which includes comments
on studies which NMFS is not
disputing.
The purpose of the technical session
is for the disputing agency, applicant,
and Commission to provide the Panel
with additional information necessary
to evaluate the disputed studies. All
local, state, and federal agencies, Indian
tribes, and other interested parties are
invited to participate in the conference
call as observers. The Panel may also
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
Cisco Unified Meeting Place
Meeting ID No. 0255
Call in within DC, 202–502–6888
Call in Outside DC, 1–877–857–1347
For more information, please contact
Monte TerHaar, the Dispute Resolution
Panel Chair, at monte.terhaar@ferc.gov
or 202–502–6035.
Dated: August 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18467 Filed 8–24–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–89–000]
Empire Pipeline, Inc.; Notice of
Schedule for Environmental Review of
the Empire North Project
On February 19, 2018, Empire
Pipeline, Inc. (Empire) filed an
application in Docket No. CP18–89–000
requesting a Certificate of Public
Convenience and Necessity pursuant to
Section 7(c) of the Natural Gas Act to
construct and operate certain natural gas
pipeline facilities. The proposed project
is known as the Empire North Project
(Project), and would provide about 205
million cubic feet per day of
E:\FR\FM\27AUN1.SGM
27AUN1
Agencies
[Federal Register Volume 83, Number 166 (Monday, August 27, 2018)]
[Notices]
[Pages 43667-43668]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18464]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-45-000]
Notice of Schedule for Environmental Review of the Dominion
Energy Transmission, Inc. Sweden Valley Project
On January 10, 2018, Dominion Energy Transmission, Inc. (Dominion)
filed an application in Docket No. CP18-45-000 requesting a Certificate
of Public Convenience and Necessity pursuant to section 7(c) of the
Natural Gas Act to construct and operate certain natural gas pipeline
facilities. The proposed project is known as the Sweden Valley Project
(Project), and involves the construction and operation of facilities
located in Licking and Tuscarawas Counties, Ohio and Armstrong,
Clinton, and Greene Counties, Pennsylvania. The Project would enable
Dominion to provide 120,000 dekatherms per day of firm transportation
service from Pennsylvania to Ohio for delivery to Tennessee Gas
Pipeline Company, LLC.
On January 24, 2018, The Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA--August 31, 2018
90-Day Federal Authorization Decision Deadline--November 29, 2018
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Dominion proposes to construct and operate the following facilities
Ohio: construction of 1.7 miles 20-inch-diameter lateral to the new
Port
[[Page 43668]]
Washington Metering and Regulation (M&R) delivery point in Tuscarawas
County, re-wheel compressors on three existing centrifugal compression
sets at Dominion's existing Newark Compressor Station in Licking
County, and construction of a pig launcher/receiver south of the
existing Gilmore M&R station in Tuscarawas County.
In addition, Dominion proposes to construct and operate the
following facilities in Pennsylvania: 3.2 miles of 24-inch-diameter
pipeline looping in Greene County (TL-654 PA Loop), installation of
regulation equipment at Dominion's existing South Bend Compressor
Station in Armstrong County and Leidy M&R Station in Clinton County,
and new mainline gate valves at the proposed TL-654 PA Loop in Greene
County.
Background
On March 13, 2018, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Sweden Valley
Project and Request for Comments on Environmental Issues (NOI). The NOI
was sent to affected landowners; federal, state, and local governmental
representatives and agencies; elected officials; environmental and
public interest groups; potentially interested Indian tribes; and local
libraries and newspapers. In response to the NOI, we received a total
of 15 comments letters. The comments addressed support for the project,
purpose and need, water resources and wetlands, geology, vegetation,
wildlife, fisheries, threatened and endangered species, land use and
recreation, air quality/greenhouse gas emissions, alternative analysis,
tribal cultural resources and the National Historic Preservation Act,
and cumulative impacts. All substantive comments will be addressed in
the EA.
The U.S. Army Corps of Engineers is a federal cooperating agency
who is assisting us in preparing this EA because they have jurisdiction
by law or special expertise with respect to environmental impacts
associated with Dominion's proposal.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e. CP18-
45), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Dated: August 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-18464 Filed 8-24-18; 8:45 am]
BILLING CODE 6717-01-P