AEP Generation Resources, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the Pad and Scoping Document, and Identification of Issues and Associated Study Requests, 43669-43671 [2018-18463]
Download as PDF
Federal Register / Vol. 83, No. 166 / Monday, August 27, 2018 / Notices
incremental firm transportation
capacity.
On March 5, 2018, the Federal Energy
Regulatory Commission (Commission or
FERC) issued its Notice of Application
for the Project. Among other things, that
notice alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s Environmental Assessment (EA)
for the Project. This instant notice
identifies the FERC staff’s planned
schedule for the completion of the EA
for the Project.
Commission received comments from
the New York State Thruway Authority
and the U.S. Environmental Protection
Agency. The primary issues raised by
the commentors are alternatives,
accessing the site, the location of a
construction staging area near a
driveway, cumulative impacts analysis,
climate change, air quality, safety, and
environmental justice. All substantive
comments will be addressed in the EA.
The U.S. Department of
Transportation is a cooperating agency
in the preparation of the EA.
Schedule for Environmental Review
Issuance of EA—November 20, 2018
90-day Federal Authorization Decision
Deadline—February 18, 2019
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
eLibrary link, select General Search
from the eLibrary menu, enter the
selected date range and Docket Number
excluding the last three digits (i.e.,
CP18–89), and follow the instructions.
For assistance with access to eLibrary,
the helpline can be reached at (866)
208–3676, TTY (202) 502–8659, or at
FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
amozie on DSK3GDR082PROD with NOTICES1
Project Description
Empire proposes to construct and
operate gas compression facilities in
Tioga County, Pennsylvania and
Ontario, New York. The Empire North
Project would consist of the following
facilities:
• A new 21,000 horsepower
compressor station in Jackson
Township, Tioga County, Pennsylvania;
• a new 32,000 horsepower
compressor station in the Town of
Farmington, Ontario County, New York;
• modifications of the existing
regulator valves and station piping and
installation of metering facilities at the
existing New Victor Regulator Station in
Ontario County, New York;
• minor modifications to the existing
Jackson Meter and Regulator Station in
Jackson Township, Tioga County,
Pennsylvania; and
• upgrading the maximum allowable
operating pressure of the Empire
Connector Pipeline from 1,290 pounds
per square inch gauge (psig) to 1,440
psig.
Background
On April 10, 2018, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Empire North Project and
Request for Comments on
Environmental Issues (NOI). The NOI
was sent to federal, state, and local
government representatives and
agencies; elected officials; Native
American tribes; other interested
parties; and local libraries and
newspapers. In response to the NOI, the
VerDate Sep<11>2014
17:51 Aug 24, 2018
Jkt 244001
Additional Information
Dated: August 17, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18421 Filed 8–24–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
43669
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2570–032]
AEP Generation Resources, Inc.;
Notice of Intent To File License
Application, Filing of Pre-Application
Document (PAD), Commencement of
Pre-Filing Process, and Scoping;
Request for Comments on the Pad and
Scoping Document, and Identification
of Issues and Associated Study
Requests
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Pre-filing
Process.
b. Project No.: 2570–032.
c. Dated Filed: July 2, 2018.
d. Submitted by: AEP Generation
Resources, Inc.
e. Name of Project: Racine
Hydroelectric Project.
f. Location: The Racine Project is
located at the U.S. Army Corps of
Engineers’ (Corps) Racine Locks and
Dam on the Ohio River near the Town
of Racine in Meigs County, Ohio. The
project occupies 23 acres of federal land
administered by the Corps.
g. Filed Pursuant to: 18 CFR part 5 of
the Commission’s Regulations.
h. Potential Applicant Contact:
Jonathan Magalski, Environmental
Specialist Consultant, c/o Indiana
Michigan Power Company, 1 Riverside
Plaza, Columbus, OH 43215; (614) 716–
2240 or jmmagalski@aep.com.
i. FERC Contact: Jay Summers at (202)
502–8764 or email at jay.summers@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in paragraph o below.
Cooperating agencies should note the
Commission’s policy that agencies that
cooperate in the preparation of the
environmental document cannot also
intervene. See 94 FERC ¶ 61,076 (2001).
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402 and (b) the State Historic
Preservation Officer, as required by
section 106, National Historic
Preservation Act, and the implementing
E:\FR\FM\27AUN1.SGM
27AUN1
amozie on DSK3GDR082PROD with NOTICES1
43670
Federal Register / Vol. 83, No. 166 / Monday, August 27, 2018 / Notices
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
AEP Generation Resources, Inc. as the
Commission’s non-federal
representative for carrying out informal
consultation, pursuant to section 7 of
the Endangered Species Act and section
106 of the National Historic
Preservation Act.
m. AEP Generation Resources, Inc.
filed with the Commission a PreApplication Document (PAD; including
a proposed process plan and schedule),
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. With this notice, we are soliciting
comments on the PAD and
Commission’s staff Scoping Document 1
(SD1), as well as study requests. All
comments on the PAD and SD1, and
study requests should be sent to the
address above in paragraph h. In
addition, all comments on the PAD and
SD1, study requests, requests for
cooperating agency status, and all
communications to and from
Commission staff related to the merits of
the potential application must be filed
with the Commission.
The Commission strongly encourages
electronic filing. Please file all
documents using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
VerDate Sep<11>2014
17:51 Aug 24, 2018
Jkt 244001
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2570–032.
All filings with the Commission must
bear the appropriate heading:
‘‘Comments on Pre-Application
Document,’’ ‘‘Study Requests,’’
‘‘Comments on Scoping Document 1,’’
‘‘Request for Cooperating Agency
Status,’’ or ‘‘Communications to and
from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by October 30, 2018.
p. Although our current intent is to
prepare an environmental assessment
(EA), there is the possibility that an
Environmental Impact Statement (EIS)
will be required. Nevertheless, the
meetings listed below will satisfy the
NEPA scoping requirements,
irrespective of whether an EA or EIS is
issued by the Commission.
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the times and places noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and locations of
these meetings are as follows:
Evening Scoping Meeting—Pomeroy,
Ohio
Date and Time: Tuesday, September
26, 2018 at 6:30 p.m.
Location: Farmers Bank and Savings
Company, 640 E Main St., Pomeroy, OH
45769, (740) 992–2136.
Daytime Scoping Meeting—Pomeroy,
Ohio
Date and Time: Wednesday,
September 27, 2018 at 9:00 a.m.
Location: Farmers Bank and Savings
Company, 640 E Main St., Pomeroy, OH
45769, (740) 992–2136.
SD1, which outlines the subject areas
to be addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and
Commission staff will conduct an
Environmental Site Review of the
project on Tuesday, September 26, 2018,
starting at 2:00 p.m. All participants
should meet at the Racine Hydroelectric
Project’s public fishing/picnic access
parking lot, which is located on the
Ohio River Scenic Byway, State Route
124, approximately 3 miles south of
Racine, Ohio. If you plan to attend the
environmental site review, please email
Jonathan Magalski of AEP Generation
Resources at jmmagalski@aep.com
(preferred contact) or (614) 716–2240 by
September 21, 2018, and indicate how
many participants will be attending
with you. AEP Generation Resources’
safety policies require that all
environmental site review participants
wear sturdy footwear; no open toe,
sandals, high heels, etc.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in
paragraph n of this document.
Meeting Procedures
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
E:\FR\FM\27AUN1.SGM
27AUN1
Federal Register / Vol. 83, No. 166 / Monday, August 27, 2018 / Notices
Dated: August 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18463 Filed 8–24–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
amozie on DSK3GDR082PROD with NOTICES1
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–78–000.
Applicants: Florida Power & Light
Company.
Description: Second Supplement to
July 5, 2018 Response to June 5, 2018
Deficiency Letter of Florida Power &
Light Company.
Filed Date: 8/21/18.
Accession Number: 20180821–5084.
Comments Due: 5 p.m. ET 9/11/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1286–001.
Applicants: FirstEnergy Solutions
Corp.
Description: Compliance filing: Notice
of Transaction Closing and Effective
Date of Rate Schedule FERC No. 1 to be
effective 7/31/2018.
Filed Date: 8/21/18.
Accession Number: 20180821–5050.
Comments Due: 5 p.m. ET 9/11/18.
Docket Numbers: ER18–2264–000.
Applicants: Macquarie Energy
Trading LLC.
Description: Baseline eTariff Filing:
MBR Application to be effective
10/21/2018.
Filed Date: 8/21/18.
Accession Number: 20180821–5042.
Comments Due: 5 p.m. ET 9/11/18.
Docket Numbers: ER18–2265–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to First Revised ISA No.
3255; Queue No. W4–073 to be effective
11/2/2016.
Filed Date: 8/21/18.
Accession Number: 20180821–5043.
Comments Due: 5 p.m. ET 9/11/18.
Docket Numbers: ER18–2266–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1910R12 Southwestern Public Service
Company to be effective 8/1/2018.
Filed Date: 8/21/18.
Accession Number: 20180821–5046.
Comments Due: 5 p.m. ET 9/11/18.
VerDate Sep<11>2014
17:51 Aug 24, 2018
Jkt 244001
Docket Numbers: ER18–2267–000.
Applicants: Entergy Texas, Inc.
Description: Tariff Cancellation: ETIKirbyville Wholesale Distribution
Service Agreement to be effective
7/11/2018.
Filed Date: 8/21/18.
Accession Number: 20180821–5047.
Comments Due: 5 p.m. ET 9/11/18.
Docket Numbers: ER18–2268–000.
Applicants: Entergy Services, Inc.
Description: Tariff Cancellation:
Kirbyville-EES Local Balancing
Authority Agreement to be effective
7/11/2018.
Filed Date: 8/21/18.
Accession Number: 20180821–5048.
Comments Due: 5 p.m. ET 9/11/18.
Docket Numbers: ER18–2269–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA/SA No.
4606; Queue No. AA1–046 to be
effective 8/20/2018.
Filed Date: 8/21/18.
Accession Number: 20180821–5064.
Comments Due: 5 p.m. ET 9/11/18.
Docket Numbers: ER18–2270–000.
Applicants: Paulding Wind Farm III
LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 10/20/2018.
Filed Date: 8/21/18.
Accession Number: 20180821–5069.
Comments Due: 5 p.m. ET 9/11/18.
Docket Numbers: ER18–2271–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–08–21_SA 3158 ATC-Plymouth
Project Commitment Agreement to be
effective 10/21/2018.
Filed Date: 8/21/18.
Accession Number: 20180821–5077.
Comments Due: 5 p.m. ET 9/11/18.
Docket Numbers: ER18–2272–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–08–21_SA 3144 Entergy TexasLiberty County-Entergy Texas MPFCA
(J472 J483) to be effective 8/7/2018.
Filed Date: 8/21/18.
Accession Number: 20180821–5093.
Comments Due: 5 p.m. ET 9/11/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
43671
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18469 Filed 8–24–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Public Notice: Records Governing Offthe-Record Communications
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications.
Order No. 607 (64 FR 51222,
September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
associated with, but not a part of, the
decisional record of the proceeding.
Unless the Commission determines that
the prohibited communication and any
responses thereto should become a part
of the decisional record, the prohibited
off-the-record communication will not
be considered by the Commission in
reaching its decision. Parties to a
proceeding may seek the opportunity to
respond to any facts or contentions
made in a prohibited off-the-record
communication, and may request that
the Commission place the prohibited
communication and responses thereto
in the decisional record. The
Commission will grant such a request
only when it determines that fairness so
requires. Any person identified below as
having made a prohibited off-the-record
communication shall serve the
document on all parties listed on the
official service list for the applicable
E:\FR\FM\27AUN1.SGM
27AUN1
Agencies
[Federal Register Volume 83, Number 166 (Monday, August 27, 2018)]
[Notices]
[Pages 43669-43671]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18463]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2570-032]
AEP Generation Resources, Inc.; Notice of Intent To File License
Application, Filing of Pre-Application Document (PAD), Commencement of
Pre-Filing Process, and Scoping; Request for Comments on the Pad and
Scoping Document, and Identification of Issues and Associated Study
Requests
a. Type of Filing: Notice of Intent to File License Application for
a New License and Commencing Pre-filing Process.
b. Project No.: 2570-032.
c. Dated Filed: July 2, 2018.
d. Submitted by: AEP Generation Resources, Inc.
e. Name of Project: Racine Hydroelectric Project.
f. Location: The Racine Project is located at the U.S. Army Corps
of Engineers' (Corps) Racine Locks and Dam on the Ohio River near the
Town of Racine in Meigs County, Ohio. The project occupies 23 acres of
federal land administered by the Corps.
g. Filed Pursuant to: 18 CFR part 5 of the Commission's
Regulations.
h. Potential Applicant Contact: Jonathan Magalski, Environmental
Specialist Consultant, c/o Indiana Michigan Power Company, 1 Riverside
Plaza, Columbus, OH 43215; (614) 716-2240 or [email protected].
i. FERC Contact: Jay Summers at (202) 502-8764 or email at
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in paragraph o below. Cooperating agencies should
note the Commission's policy that agencies that cooperate in the
preparation of the environmental document cannot also intervene. See 94
FERC ] 61,076 (2001).
k. With this notice, we are initiating informal consultation with:
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under
section 7 of the Endangered Species Act and the joint agency
regulations thereunder at 50 CFR, Part 402 and (b) the State Historic
Preservation Officer, as required by section 106, National Historic
Preservation Act, and the implementing
[[Page 43670]]
regulations of the Advisory Council on Historic Preservation at 36 CFR
800.2.
l. With this notice, we are designating AEP Generation Resources,
Inc. as the Commission's non-federal representative for carrying out
informal consultation, pursuant to section 7 of the Endangered Species
Act and section 106 of the National Historic Preservation Act.
m. AEP Generation Resources, Inc. filed with the Commission a Pre-
Application Document (PAD; including a proposed process plan and
schedule), pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. With this notice, we are soliciting comments on the PAD and
Commission's staff Scoping Document 1 (SD1), as well as study requests.
All comments on the PAD and SD1, and study requests should be sent to
the address above in paragraph h. In addition, all comments on the PAD
and SD1, study requests, requests for cooperating agency status, and
all communications to and from Commission staff related to the merits
of the potential application must be filed with the Commission.
The Commission strongly encourages electronic filing. Please file
all documents using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected]. In lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-2570-032.
All filings with the Commission must bear the appropriate heading:
``Comments on Pre-Application Document,'' ``Study Requests,''
``Comments on Scoping Document 1,'' ``Request for Cooperating Agency
Status,'' or ``Communications to and from Commission Staff.'' Any
individual or entity interested in submitting study requests,
commenting on the PAD or SD1, and any agency requesting cooperating
status must do so by October 30, 2018.
p. Although our current intent is to prepare an environmental
assessment (EA), there is the possibility that an Environmental Impact
Statement (EIS) will be required. Nevertheless, the meetings listed
below will satisfy the NEPA scoping requirements, irrespective of
whether an EA or EIS is issued by the Commission.
Scoping Meetings
Commission staff will hold two scoping meetings in the vicinity of
the project at the times and places noted below. The daytime meeting
will focus on resource agency, Indian tribes, and non-governmental
organization concerns, while the evening meeting is primarily for
receiving input from the public. We invite all interested individuals,
organizations, and agencies to attend one or both of the meetings, and
to assist staff in identifying particular study needs, as well as the
scope of environmental issues to be addressed in the environmental
document. The times and locations of these meetings are as follows:
Evening Scoping Meeting--Pomeroy, Ohio
Date and Time: Tuesday, September 26, 2018 at 6:30 p.m.
Location: Farmers Bank and Savings Company, 640 E Main St.,
Pomeroy, OH 45769, (740) 992-2136.
Daytime Scoping Meeting--Pomeroy, Ohio
Date and Time: Wednesday, September 27, 2018 at 9:00 a.m.
Location: Farmers Bank and Savings Company, 640 E Main St.,
Pomeroy, OH 45769, (740) 992-2136.
SD1, which outlines the subject areas to be addressed in the
environmental document, was mailed to the individuals and entities on
the Commission's mailing list. Copies of SD1 will be available at the
scoping meetings, or may be viewed on the web at https://www.ferc.gov,
using the ``eLibrary'' link. Follow the directions for accessing
information in paragraph n. Based on all oral and written comments, a
Scoping Document 2 (SD2) may be issued. SD2 may include a revised
process plan and schedule, as well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and Commission staff will conduct an
Environmental Site Review of the project on Tuesday, September 26,
2018, starting at 2:00 p.m. All participants should meet at the Racine
Hydroelectric Project's public fishing/picnic access parking lot, which
is located on the Ohio River Scenic Byway, State Route 124,
approximately 3 miles south of Racine, Ohio. If you plan to attend the
environmental site review, please email Jonathan Magalski of AEP
Generation Resources at [email protected] (preferred contact) or (614)
716-2240 by September 21, 2018, and indicate how many participants will
be attending with you. AEP Generation Resources' safety policies
require that all environmental site review participants wear sturdy
footwear; no open toe, sandals, high heels, etc.
Meeting Objectives
At the scoping meetings, staff will: (1) Initiate scoping of the
issues; (2) review and discuss existing conditions and resource
management objectives; (3) review and discuss existing information and
identify preliminary information and study needs; (4) review and
discuss the process plan and schedule for pre-filing activity that
incorporates the time frames provided for in Part 5 of the Commission's
regulations and, to the extent possible, maximizes coordination of
federal, state, and tribal permitting and certification processes; and
(5) discuss the appropriateness of any federal or state agency or
Indian tribe acting as a cooperating agency for development of an
environmental document.
Meeting participants should come prepared to discuss their issues
and/or concerns. Please review the PAD in preparation for the scoping
meetings. Directions on how to obtain a copy of the PAD and SD1 are
included in paragraph n of this document.
Meeting Procedures
The meetings will be recorded by a stenographer and will be placed
in the public records of the project.
[[Page 43671]]
Dated: August 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-18463 Filed 8-24-18; 8:45 am]