Environmental Impact Statements; Notice of Availability, 42892 [2018-18331]

Download as PDF 42892 Federal Register / Vol. 83, No. 165 / Friday, August 24, 2018 / Notices or a compatible spreadsheet format will facilitate ease of use. • Information regarding sampling methodologies, design, conditions (i.e., time of day, weather conditions during and preceding the sampling), sampling locations (i.e., geographical coordinates, maps), peer review, and quality assurance procedures applied would also be very beneficial. Please include such information and citations where available. • Please include names, contacts, and affiliations with your data submission. Dated: August 9, 2018. Dominique Lueckenhoff, Acting Director, Water Protection Division, U.S. Environmental Protection Agency, Region III. [FR Doc. 2018–18410 Filed 8–23–18; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9040–9] Environmental Impact Statements; Notice of Availability daltland on DSKBBV9HB2PROD with NOTICES Responsible Agency: Office of Federal Activities, General Information (202) 564–7156 or https://www2.epa.gov/ nepa/. Weekly receipt of Environmental Impact Statements Filed 08/13/2018 through 08/17/2018 Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxnodengn.epa.gov/cdx-enepa-public/ action/eis/search. EIS No. 20180187, Draft, GSA, CA, Otay Mesa Modernization and Expansion, Comment Period Ends: 10/09/2018, Contact: Osmahn Kadri 415–522–3617 EIS No. 20180188, Draft, USFS, ID, Crow Creek Pipeline Project Draft Environmental Impact Statement, Comment Period Ends: 11/23/2018, Contact: Mike Duncan 208–847–0375 EIS No. 20180189, Draft Supplement, NRC, LA, Nureg 137 Supplement 59, Comment Period Ends: 10/09/2018, Contact: Elaine Keegan 301–415–8517 EIS No. 20180190, Draft, USFS, CA, Stanislaus National Forest Over-Snow Vehicle (OSV) Use Designation, Comment Period Ends: 10/09/2018, Contact: Beth Martinez 209–288–6307 EIS No. 20180191, Final, USFS, PR, El Yunque National Forest Plan Revision EIS, Review Period Ends: 10/23/2018, Contact: Pedro Rios 305–306–3805 VerDate Sep<11>2014 19:17 Aug 23, 2018 Jkt 244001 Dated: August 21, 2018. Robert Tomiak, Director, Office of Federal Activities. [FR Doc. 2018–18331 Filed 8–23–18; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2018–0563; FRL–9982–34] MERP Systems, Inc.; Transfer of Data 20460–0001. The Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Public Reading Room is (202) 566–1744, and the telephone number for the OPP Docket is (703) 305–5805. Please review the visitor instructions and additional information about the docket available at https://www.epa.gov/dockets. II. Contractor Requirements The Contractor shall perform activities in the PWS that are organized into four (4) main categories: Task Activity 1 is related to overall project management; Task Activity 2 is related SUMMARY: This notice announces that to information about pesticide products, pesticide related information submitted including the receipt of applications for to EPA’s Office of Pesticide Programs regulatory action, the results of EPA (OPP) pursuant to the Federal registration decisions affecting Insecticide, Fungicide, and Rodenticide individual products and pesticide uses Act (FIFRA) and the Federal Food, Drug, and reports of incidents involving the and Cosmetic Act (FFDCA), including use of pesticide products; Task Activity information that may have been claimed 3 is related to information about as Confidential Business Information pesticide studies, position papers, (CBI) by the submitter, will be analyses and the administrative records transferred to MERP Systems, Inc. in resulting from the decision processes accordance with the CBI regulations. themselves; and Task Activity 4 is MERP Systems, Inc. has been awarded related to updating OPP’s PRISM Label multiple contracts to perform work for Use Information System (LUIS) which is OPP, and access to this information will an automated pesticide information enable MERP Systems, Inc. to fulfill the system that contains a summary of the obligations of the contract. legal uses of registered pesticide DATES: MERP Systems, Inc. will be products. given access to this information on or The contractor shall: before August 29, 2018. • Capture data that supports FOR FURTHER INFORMATION CONTACT: regulatory applications, decisions, William Northern, Information incident reports, and Personally Technology and Resources Management Identifiable Information (PII), etc.; Division (7502P), Office of Pesticide • Provide processing, indexing Programs, Environmental Protection support and shredding/destruction of Agency, 1200 Pennsylvania Ave. NW, studies and other technical documents Washington, DC 20460–0001; telephone of archival significance; and number: (703) 305–6478 email address: • Make every effort to adopt to northern.william@epa.gov. changing environments in technology, SUPPLEMENTARY INFORMATION: Office of Management and Budget (OMB), Homeland Security, Presidential I. General Information Directives, and EPA Management A. Does this action apply to me? Directives, of which, changes could be in the areas of technology, regulations, This action applies to the public in information systems. process general. As such, the Agency has not adaptations. coordination with other attempted to describe all the specific agencies, coordination with other entities that may be affected by this Agency contractors. Government action. furnished equipment and/or software, B. How can I get copies of this document facilities and security requirements, and other related information? shall remain within the tasks activities herein. The docket for this action, identified These contracts involve no by docket identification (ID) number subcontractors. EPA–HQ–OPP–2018–0563, is available OPP has determined that the contracts at https://www.regulations.gov or at the described in this document involve Office of Pesticide Programs Regulatory work that is being conducted in Public Docket (OPP Docket) in the connection with FIFRA, in that Environmental Protection Agency pesticide chemicals will be the subject Docket Center (EPA/DC), West William of certain evaluations to be made under Jefferson Clinton Bldg., Rm. 3334, 1301 this contract. These evaluations may be Constitution Ave. NW, Washington, DC Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\24AUN1.SGM 24AUN1

Agencies

[Federal Register Volume 83, Number 165 (Friday, August 24, 2018)]
[Notices]
[Page 42892]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18331]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9040-9]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7156 or https://www2.epa.gov/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 08/13/2018 through 08/17/2018
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.

EIS No. 20180187, Draft, GSA, CA, Otay Mesa Modernization and 
Expansion, Comment Period Ends: 10/09/2018, Contact: Osmahn Kadri 415-
522-3617
EIS No. 20180188, Draft, USFS, ID, Crow Creek Pipeline Project Draft 
Environmental Impact Statement, Comment Period Ends: 11/23/2018, 
Contact: Mike Duncan 208-847-0375
EIS No. 20180189, Draft Supplement, NRC, LA, Nureg 137 Supplement 59, 
Comment Period Ends: 10/09/2018, Contact: Elaine Keegan 301-415-8517
EIS No. 20180190, Draft, USFS, CA, Stanislaus National Forest Over-Snow 
Vehicle (OSV) Use Designation, Comment Period Ends: 10/09/2018, 
Contact: Beth Martinez 209-288-6307
EIS No. 20180191, Final, USFS, PR, El Yunque National Forest Plan 
Revision EIS, Review Period Ends: 10/23/2018, Contact: Pedro Rios 305-
306-3805

    Dated: August 21, 2018.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2018-18331 Filed 8-23-18; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.