Environmental Impact Statements; Notice of Availability, 42892 [2018-18331]
Download as PDF
42892
Federal Register / Vol. 83, No. 165 / Friday, August 24, 2018 / Notices
or a compatible spreadsheet format will
facilitate ease of use.
• Information regarding sampling
methodologies, design, conditions (i.e.,
time of day, weather conditions during
and preceding the sampling), sampling
locations (i.e., geographical coordinates,
maps), peer review, and quality
assurance procedures applied would
also be very beneficial. Please include
such information and citations where
available.
• Please include names, contacts, and
affiliations with your data submission.
Dated: August 9, 2018.
Dominique Lueckenhoff,
Acting Director, Water Protection Division,
U.S. Environmental Protection Agency,
Region III.
[FR Doc. 2018–18410 Filed 8–23–18; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9040–9]
Environmental Impact Statements;
Notice of Availability
daltland on DSKBBV9HB2PROD with NOTICES
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7156 or https://www2.epa.gov/
nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 08/13/2018 through 08/17/2018
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20180187, Draft, GSA, CA, Otay
Mesa Modernization and Expansion,
Comment Period Ends: 10/09/2018,
Contact: Osmahn Kadri 415–522–3617
EIS No. 20180188, Draft, USFS, ID,
Crow Creek Pipeline Project Draft
Environmental Impact Statement,
Comment Period Ends: 11/23/2018,
Contact: Mike Duncan 208–847–0375
EIS No. 20180189, Draft Supplement,
NRC, LA, Nureg 137 Supplement 59,
Comment Period Ends: 10/09/2018,
Contact: Elaine Keegan 301–415–8517
EIS No. 20180190, Draft, USFS, CA,
Stanislaus National Forest Over-Snow
Vehicle (OSV) Use Designation,
Comment Period Ends: 10/09/2018,
Contact: Beth Martinez 209–288–6307
EIS No. 20180191, Final, USFS, PR, El
Yunque National Forest Plan Revision
EIS, Review Period Ends: 10/23/2018,
Contact: Pedro Rios 305–306–3805
VerDate Sep<11>2014
19:17 Aug 23, 2018
Jkt 244001
Dated: August 21, 2018.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2018–18331 Filed 8–23–18; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2018–0563; FRL–9982–34]
MERP Systems, Inc.; Transfer of Data
20460–0001. The Public Reading Room
is open from 8:30 a.m. to 4:30 p.m.,
Monday through Friday, excluding legal
holidays. The telephone number for the
Public Reading Room is (202) 566–1744,
and the telephone number for the OPP
Docket is (703) 305–5805. Please review
the visitor instructions and additional
information about the docket available
at https://www.epa.gov/dockets.
II. Contractor Requirements
The Contractor shall perform
activities in the PWS that are organized
into four (4) main categories: Task
Activity 1 is related to overall project
management; Task Activity 2 is related
SUMMARY: This notice announces that
to information about pesticide products,
pesticide related information submitted including the receipt of applications for
to EPA’s Office of Pesticide Programs
regulatory action, the results of EPA
(OPP) pursuant to the Federal
registration decisions affecting
Insecticide, Fungicide, and Rodenticide individual products and pesticide uses
Act (FIFRA) and the Federal Food, Drug, and reports of incidents involving the
and Cosmetic Act (FFDCA), including
use of pesticide products; Task Activity
information that may have been claimed 3 is related to information about
as Confidential Business Information
pesticide studies, position papers,
(CBI) by the submitter, will be
analyses and the administrative records
transferred to MERP Systems, Inc. in
resulting from the decision processes
accordance with the CBI regulations.
themselves; and Task Activity 4 is
MERP Systems, Inc. has been awarded
related to updating OPP’s PRISM Label
multiple contracts to perform work for
Use Information System (LUIS) which is
OPP, and access to this information will an automated pesticide information
enable MERP Systems, Inc. to fulfill the system that contains a summary of the
obligations of the contract.
legal uses of registered pesticide
DATES: MERP Systems, Inc. will be
products.
given access to this information on or
The contractor shall:
before August 29, 2018.
• Capture data that supports
FOR FURTHER INFORMATION CONTACT:
regulatory applications, decisions,
William Northern, Information
incident reports, and Personally
Technology and Resources Management Identifiable Information (PII), etc.;
Division (7502P), Office of Pesticide
• Provide processing, indexing
Programs, Environmental Protection
support and shredding/destruction of
Agency, 1200 Pennsylvania Ave. NW,
studies and other technical documents
Washington, DC 20460–0001; telephone of archival significance; and
number: (703) 305–6478 email address:
• Make every effort to adopt to
northern.william@epa.gov.
changing environments in technology,
SUPPLEMENTARY INFORMATION:
Office of Management and Budget
(OMB), Homeland Security, Presidential
I. General Information
Directives, and EPA Management
A. Does this action apply to me?
Directives, of which, changes could be
in the areas of technology, regulations,
This action applies to the public in
information systems. process
general. As such, the Agency has not
adaptations. coordination with other
attempted to describe all the specific
agencies, coordination with other
entities that may be affected by this
Agency contractors. Government
action.
furnished equipment and/or software,
B. How can I get copies of this document facilities and security requirements,
and other related information?
shall remain within the tasks activities
herein.
The docket for this action, identified
These contracts involve no
by docket identification (ID) number
subcontractors.
EPA–HQ–OPP–2018–0563, is available
OPP has determined that the contracts
at https://www.regulations.gov or at the
described in this document involve
Office of Pesticide Programs Regulatory
work that is being conducted in
Public Docket (OPP Docket) in the
connection with FIFRA, in that
Environmental Protection Agency
pesticide chemicals will be the subject
Docket Center (EPA/DC), West William
of certain evaluations to be made under
Jefferson Clinton Bldg., Rm. 3334, 1301
this contract. These evaluations may be
Constitution Ave. NW, Washington, DC
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
E:\FR\FM\24AUN1.SGM
24AUN1
Agencies
[Federal Register Volume 83, Number 165 (Friday, August 24, 2018)]
[Notices]
[Page 42892]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18331]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9040-9]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7156 or https://www2.epa.gov/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 08/13/2018 through 08/17/2018
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
EIS No. 20180187, Draft, GSA, CA, Otay Mesa Modernization and
Expansion, Comment Period Ends: 10/09/2018, Contact: Osmahn Kadri 415-
522-3617
EIS No. 20180188, Draft, USFS, ID, Crow Creek Pipeline Project Draft
Environmental Impact Statement, Comment Period Ends: 11/23/2018,
Contact: Mike Duncan 208-847-0375
EIS No. 20180189, Draft Supplement, NRC, LA, Nureg 137 Supplement 59,
Comment Period Ends: 10/09/2018, Contact: Elaine Keegan 301-415-8517
EIS No. 20180190, Draft, USFS, CA, Stanislaus National Forest Over-Snow
Vehicle (OSV) Use Designation, Comment Period Ends: 10/09/2018,
Contact: Beth Martinez 209-288-6307
EIS No. 20180191, Final, USFS, PR, El Yunque National Forest Plan
Revision EIS, Review Period Ends: 10/23/2018, Contact: Pedro Rios 305-
306-3805
Dated: August 21, 2018.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2018-18331 Filed 8-23-18; 8:45 am]
BILLING CODE 6560-50-P