Notice of Petition for Declaratory Order; White Cliffs Pipeline, LLC, 42886-42887 [2018-18322]
Download as PDF
42886
Federal Register / Vol. 83, No. 165 / Friday, August 24, 2018 / Notices
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2336–094.
All filings with the Commission must
bear the appropriate heading:
‘‘Comments on Pre-Application
Document,’’ ‘‘Study Requests,’’
‘‘Comments on Scoping Document 1,’’
‘‘Request for Cooperating Agency
Status,’’ or ‘‘Communications to and
from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by November 5, 2018.
p. We intend to prepare an
environmental assessment (EA).
Nevertheless, the meetings listed below
will satisfy the NEPA scoping
requirements, irrespective of whether an
EA or an Environmental Impact
Statement is issued by the Commission.
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the times and places noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and locations of
these meetings are as follows:
daltland on DSKBBV9HB2PROD with NOTICES
Daytime Scoping Meeting—Jackson,
Georgia
Date & Time: Thursday, September
13, 2018, at 9 a.m.
Location: Pepper Sprout Barn, 562
Old Bethel Road, Jackson, Georgia
30233, (678) 752–1550.
Evening Scoping Meeting—Jackson,
Georgia
Date & Time: Thursday, September
13, 2018, at 6:30 p.m.
Location: Pepper Sprout Barn, 562
Old Bethel Road, Jackson, Georgia
30233, (678) 752–1550.
Scoping Document 1 (SD1), which
outlines the subject areas to be
addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
VerDate Sep<11>2014
19:17 Aug 23, 2018
Jkt 244001
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and
Commission staff will conduct an
Environmental Site Review (site visit) of
the project on Friday, September 14,
2018, consisting of facility tours from
9:00 a.m. to 12:00 p.m., and boat tours
from 1:00 p.m. to 4:00 p.m. All
participants should meet at the Jackson
Land Management Office located at 180
Dam Road, Jackson, Georgia 30233.
Participants must notify Courtenay
O’Mara at g2jacksonrel@
southernco.com, or (404) 506–7219, on
or before August 29, 2018, if they plan
to attend the environmental site review.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Meeting Procedures
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
Dated: August 20, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18324 Filed 8–23–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR18–35–000]
Notice of Petition for Declaratory
Order; White Cliffs Pipeline, LLC
Take notice that on August 16, 2018,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2017),
White Cliffs Pipeline, L.L.C. (White
Cliff), filed a declaratory order petition
seeking approval of certain terms and
conditions of service for White Cliffs’
portion of a joint project to provide
pipeline transportation of natural gas
liquids (NGL) from receipt points in
Weld County, Colorado to the NGL
marketing hub of Mont Belvieu, Texas.
The joint project is being undertaken in
conjunction with DCP Wattenberg
Pipeline, LLC and DCP Southern Hills
Pipeline, LLC (the DCP Parties), all as
more fully explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
E:\FR\FM\24AUN1.SGM
24AUN1
Federal Register / Vol. 83, No. 165 / Friday, August 24, 2018 / Notices
Filed Date: 8/14/18.
Accession Number: 20180814–5151.
Comments Due: 5 p.m. ET 9/4/18.
Dated: August 20, 2018.
Docket Numbers: ER18–2246–000.
Nathaniel J. Davis, Sr.,
Applicants: Heartland Divide Wind
Deputy Secretary.
Project, LLC.
[FR Doc. 2018–18322 Filed 8–23–18; 8:45 am]
Description: Baseline eTariff Filing:
BILLING CODE 6717–01–P
Heartland Divide Wind Project, LLC
Application for Market-Based Rate
Authority to be effective 10/16/2018.
DEPARTMENT OF ENERGY
Filed Date: 8/17/18.
Accession Number: 20180817–5152.
Federal Energy Regulatory
Comments Due: 5 p.m. ET 9/7/18.
Commission
Docket Numbers: ER18–2247–000.
Combined Notice of Filings #1
Applicants: Southwest Power Pool,
Inc.
Take notice that the Commission
Description: § 205(d) Rate Filing: 3473
received the following electric rate
Upstream
Wind Energy and Westar
filings:
Energy Meter Agent Agr to be effective
Docket Numbers: ER10–2527–005;
8/1/2018.
ER15–356–008; ER15–357–008; ER10–
Filed Date: 8/20/18.
2532–011; ER10–1595–009; ER10–2533–
Accession Number: 20180820–5001.
005; ER10–1598–009; ER10–2535–006;
Comments Due: 5 p.m. ET 9/10/18.
ER10–1616–009; ER10–1618–009;
Docket Numbers: ER18–2248–000.
ER18–1821–001.
Applicants: Blue Pilot Energy, LLC.
Applicants: Allegheny Ridge Wind
Description: Notice of cancellation of
Farm, LLC, Chief Conemaugh Power,
MBR Tariff Blue Pilot Energy, LLC.
LLC, Chief Keystone Power, LLC,
Filed Date: 8/17/18.
Crescent Ridge LLC, Crete Energy
Accession Number: 20180817–5178.
Venture, LLC, GSG, LLC, Lincoln
Comments Due: 5 p.m. ET 9/7/18.
Generating Facility, LLC, Mendota Hills,
Docket Numbers: ER18–2250–000.
LLC, New Covert Generating Company,
Applicants: PJM Interconnection,
LLC, Rolling Hills Generating, L.L.C.,
L.L.C.
Walleye Power, LLC.
Description: Compliance filing: Notice
Description: Notice of Non-Material
of Cancellation of WMPA/SA No. 2214;
Change in Status of Allegheny Ridge
Queue No. U3–032 to be effective N/A.
Wind Farm, LLC, et. al.
Filed Date: 8/20/18.
Filed Date: 8/20/18.
Accession Number: 20180820–5068.
Accession Number: 20180820–5085.
Comments Due: 5 p.m. ET 9/10/18.
Comments Due: 5 p.m. ET 9/10/18.
Docket Numbers: ER18–2251–000.
Docket Numbers: ER15–936–003;
Applicants: Midcontinent
ER15–960–003; ER17–1531–001; ER10–
Independent System Operator, Inc.
1514–003; ER13–343–009; ER13–342–
Description: § 205(d) Rate Filing:
013; ER16–700–002; ER16–701–002.
2018–08–20_SA 3156 ATC–CEC Project
Applicants: Benson Power, LLC, CPV
Commitment Agreement (Carmeuse) to
Biomass Holdings, LLC, CPV Fairview,
be effective 10/20/2018.
LLC, CPV Keenan II Renewable Energy
Filed Date: 8/20/18.
Company, LLC, CPV Maryland, LLC,
Accession Number: 20180820–5072.
CPV Shore, LLC, CPV Towantic, LLC,
Comments Due: 5 p.m. ET 9/10/18.
CPV Valley, LLC.
Docket Numbers: ER18–2252–000.
Description: Notice of Change in
Applicants: MC Project Company
Status of Benson Power, LLC, et al.
LLC.
Filed Date: 8/17/18.
Description: Baseline eTariff Filing:
Accession Number: 20180817–5175.
Comments Due: 5 p.m. ET 9/7/18.
Market-Based Rate Authorization and
Request for Waivers & Blanket
Docket Numbers: ER18–2118–000;
Approvals to be effective 8/21/2018.
ER18–2003–000; ER18–2182–000;
Filed Date: 8/20/18.
ER18–2066–000; ER18–2067–000;
Accession Number: 20180820–5074.
ER18–1981–000; ER18–2032–000.
Comments Due: 5 p.m. ET 9/10/18.
Applicants: Armadillo Flats Wind
Project, LLC, Lorenzo Wind, LLC, Minco
Docket Numbers: ER18–2253–000.
IV & V Interconnection, LLC, Minco
Applicants: Martins Creek, LLC.
Wind IV, LLC, Minco Wind V, LLC,
Description: § 205(d) Rate Filing:
Pratt Wind, LLC, Wildcat Ranch Wind
Reactive Service Rate Schedule Filings
Project, LLC.
and Request for Waiver to be effective
Description: Second Amendment to
12/31/9998.
July 31, 2018 et al. Armadillo Flats
Filed Date: 8/20/18.
Wind Project, LLC tariff filing, et al.
Accession Number: 20180820–5077.
daltland on DSKBBV9HB2PROD with NOTICES
Comment Date: 5:00 p.m. Eastern time
on September 20, 2018.
VerDate Sep<11>2014
19:17 Aug 23, 2018
Jkt 244001
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
42887
Comments Due: 5 p.m. ET 9/10/18.
Docket Numbers: ER18–2254–000.
Applicants: MC Project Company
LLC.
Description: § 205(d) Rate Filing:
Reactive Service Rate Schedule Filings
and Request for Waiver to be effective
12/31/9998.
Filed Date: 8/20/18.
Accession Number: 20180820–5083.
Comments Due: 5 p.m. ET 9/10/18.
Docket Numbers: ER18–2255–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 265, Amendment No. 2—
PV-Morgan Joint Participation to be
effective 10/20/2018.
Filed Date: 8/20/18.
Accession Number: 20180820–5094.
Comments Due: 5 p.m. ET 9/10/18.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES18–57–000.
Applicants: MDU Resources Group,
Inc.
Description: Application for
Authorization under Section 204 of the
Federal Power Act of MDU Resources
Group, Inc.
Filed Date: 8/17/18.
Accession Number: 20180817–5182.
Comments Due: 5 p.m. ET 9/7/18.
Docket Numbers: ES18–58–000.
Applicants: Baja California Power,
Inc.
Description: Application for
Authorization under Section 204 of the
Federal Power Act of Baja California
Power, Inc.
Filed Date: 8/20/18.
Accession Number: 20180820–5092.
Comments Due: 5 p.m. ET 9/10/18.
Take notice that the Commission
received the following electric
reliability filings
Docket Numbers: RD18–7–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for Approval of Proposed
Reliability Standard BAL–002–3.
Filed Date: 8/17/18.
Accession Number: 20180817–5177.
Comments Due: 5 p.m. ET 9/10/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
E:\FR\FM\24AUN1.SGM
24AUN1
Agencies
[Federal Register Volume 83, Number 165 (Friday, August 24, 2018)]
[Notices]
[Pages 42886-42887]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18322]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR18-35-000]
Notice of Petition for Declaratory Order; White Cliffs Pipeline,
LLC
Take notice that on August 16, 2018, pursuant to Rule 207(a)(2) of
the Federal Energy Regulatory Commission's (Commission) Rules of
Practice and Procedure, 18 CFR 385.207(a)(2) (2017), White Cliffs
Pipeline, L.L.C. (White Cliff), filed a declaratory order petition
seeking approval of certain terms and conditions of service for White
Cliffs' portion of a joint project to provide pipeline transportation
of natural gas liquids (NGL) from receipt points in Weld County,
Colorado to the NGL marketing hub of Mont Belvieu, Texas. The joint
project is being undertaken in conjunction with DCP Wattenberg
Pipeline, LLC and DCP Southern Hills Pipeline, LLC (the DCP Parties),
all as more fully explained in the petition.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Petitioner.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the website that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
[email protected], or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
[[Page 42887]]
Comment Date: 5:00 p.m. Eastern time on September 20, 2018.
Dated: August 20, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-18322 Filed 8-23-18; 8:45 am]
BILLING CODE 6717-01-P