Download as PDF 42886 Federal Register / Vol. 83, No. 165 / Friday, August 24, 2018 / Notices Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2336–094. All filings with the Commission must bear the appropriate heading: ‘‘Comments on Pre-Application Document,’’ ‘‘Study Requests,’’ ‘‘Comments on Scoping Document 1,’’ ‘‘Request for Cooperating Agency Status,’’ or ‘‘Communications to and from Commission Staff.’’ Any individual or entity interested in submitting study requests, commenting on the PAD or SD1, and any agency requesting cooperating status must do so by November 5, 2018. p. We intend to prepare an environmental assessment (EA). Nevertheless, the meetings listed below will satisfy the NEPA scoping requirements, irrespective of whether an EA or an Environmental Impact Statement is issued by the Commission. Scoping Meetings Commission staff will hold two scoping meetings in the vicinity of the project at the times and places noted below. The daytime meeting will focus on resource agency, Indian tribes, and non-governmental organization concerns, while the evening meeting is primarily for receiving input from the public. We invite all interested individuals, organizations, and agencies to attend one or both of the meetings, and to assist staff in identifying particular study needs, as well as the scope of environmental issues to be addressed in the environmental document. The times and locations of these meetings are as follows: daltland on DSKBBV9HB2PROD with NOTICES Daytime Scoping Meeting—Jackson, Georgia Date & Time: Thursday, September 13, 2018, at 9 a.m. Location: Pepper Sprout Barn, 562 Old Bethel Road, Jackson, Georgia 30233, (678) 752–1550. Evening Scoping Meeting—Jackson, Georgia Date & Time: Thursday, September 13, 2018, at 6:30 p.m. Location: Pepper Sprout Barn, 562 Old Bethel Road, Jackson, Georgia 30233, (678) 752–1550. Scoping Document 1 (SD1), which outlines the subject areas to be addressed in the environmental document, was mailed to the individuals and entities on the Commission’s mailing list. Copies of SD1 will be available at the scoping meetings, or may be viewed on the web at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Follow the directions VerDate Sep<11>2014 19:17 Aug 23, 2018 Jkt 244001 for accessing information in paragraph n. Based on all oral and written comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a revised process plan and schedule, as well as a list of issues, identified through the scoping process. Environmental Site Review The potential applicant and Commission staff will conduct an Environmental Site Review (site visit) of the project on Friday, September 14, 2018, consisting of facility tours from 9:00 a.m. to 12:00 p.m., and boat tours from 1:00 p.m. to 4:00 p.m. All participants should meet at the Jackson Land Management Office located at 180 Dam Road, Jackson, Georgia 30233. Participants must notify Courtenay O’Mara at g2jacksonrel@ southernco.com, or (404) 506–7219, on or before August 29, 2018, if they plan to attend the environmental site review. Meeting Objectives At the scoping meetings, staff will: (1) Initiate scoping of the issues; (2) review and discuss existing conditions and resource management objectives; (3) review and discuss existing information and identify preliminary information and study needs; (4) review and discuss the process plan and schedule for prefiling activity that incorporates the time frames provided for in Part 5 of the Commission’s regulations and, to the extent possible, maximizes coordination of federal, state, and tribal permitting and certification processes; and (5) discuss the appropriateness of any federal or state agency or Indian tribe acting as a cooperating agency for development of an environmental document. Meeting participants should come prepared to discuss their issues and/or concerns. Please review the PAD in preparation for the scoping meetings. Directions on how to obtain a copy of the PAD and SD1 are included in item n. of this document. Meeting Procedures The meetings will be recorded by a stenographer and will be placed in the public records of the project. Dated: August 20, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–18324 Filed 8–23–18; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR18–35–000] Notice of Petition for Declaratory Order; White Cliffs Pipeline, LLC Take notice that on August 16, 2018, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2) (2017), White Cliffs Pipeline, L.L.C. (White Cliff), filed a declaratory order petition seeking approval of certain terms and conditions of service for White Cliffs’ portion of a joint project to provide pipeline transportation of natural gas liquids (NGL) from receipt points in Weld County, Colorado to the NGL marketing hub of Mont Belvieu, Texas. The joint project is being undertaken in conjunction with DCP Wattenberg Pipeline, LLC and DCP Southern Hills Pipeline, LLC (the DCP Parties), all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. E:\FR\FM\24AUN1.SGM 24AUN1 Federal Register / Vol. 83, No. 165 / Friday, August 24, 2018 / Notices Filed Date: 8/14/18. Accession Number: 20180814–5151. Comments Due: 5 p.m. ET 9/4/18. Dated: August 20, 2018. Docket Numbers: ER18–2246–000. Nathaniel J. Davis, Sr., Applicants: Heartland Divide Wind Deputy Secretary. Project, LLC. [FR Doc. 2018–18322 Filed 8–23–18; 8:45 am] Description: Baseline eTariff Filing: BILLING CODE 6717–01–P Heartland Divide Wind Project, LLC Application for Market-Based Rate Authority to be effective 10/16/2018. DEPARTMENT OF ENERGY Filed Date: 8/17/18. Accession Number: 20180817–5152. Federal Energy Regulatory Comments Due: 5 p.m. ET 9/7/18. Commission Docket Numbers: ER18–2247–000. Combined Notice of Filings #1 Applicants: Southwest Power Pool, Inc. Take notice that the Commission Description: § 205(d) Rate Filing: 3473 received the following electric rate Upstream Wind Energy and Westar filings: Energy Meter Agent Agr to be effective Docket Numbers: ER10–2527–005; 8/1/2018. ER15–356–008; ER15–357–008; ER10– Filed Date: 8/20/18. 2532–011; ER10–1595–009; ER10–2533– Accession Number: 20180820–5001. 005; ER10–1598–009; ER10–2535–006; Comments Due: 5 p.m. ET 9/10/18. ER10–1616–009; ER10–1618–009; Docket Numbers: ER18–2248–000. ER18–1821–001. Applicants: Blue Pilot Energy, LLC. Applicants: Allegheny Ridge Wind Description: Notice of cancellation of Farm, LLC, Chief Conemaugh Power, MBR Tariff Blue Pilot Energy, LLC. LLC, Chief Keystone Power, LLC, Filed Date: 8/17/18. Crescent Ridge LLC, Crete Energy Accession Number: 20180817–5178. Venture, LLC, GSG, LLC, Lincoln Comments Due: 5 p.m. ET 9/7/18. Generating Facility, LLC, Mendota Hills, Docket Numbers: ER18–2250–000. LLC, New Covert Generating Company, Applicants: PJM Interconnection, LLC, Rolling Hills Generating, L.L.C., L.L.C. Walleye Power, LLC. Description: Compliance filing: Notice Description: Notice of Non-Material of Cancellation of WMPA/SA No. 2214; Change in Status of Allegheny Ridge Queue No. U3–032 to be effective N/A. Wind Farm, LLC, et. al. Filed Date: 8/20/18. Filed Date: 8/20/18. Accession Number: 20180820–5068. Accession Number: 20180820–5085. Comments Due: 5 p.m. ET 9/10/18. Comments Due: 5 p.m. ET 9/10/18. Docket Numbers: ER18–2251–000. Docket Numbers: ER15–936–003; Applicants: Midcontinent ER15–960–003; ER17–1531–001; ER10– Independent System Operator, Inc. 1514–003; ER13–343–009; ER13–342– Description: § 205(d) Rate Filing: 013; ER16–700–002; ER16–701–002. 2018–08–20_SA 3156 ATC–CEC Project Applicants: Benson Power, LLC, CPV Commitment Agreement (Carmeuse) to Biomass Holdings, LLC, CPV Fairview, be effective 10/20/2018. LLC, CPV Keenan II Renewable Energy Filed Date: 8/20/18. Company, LLC, CPV Maryland, LLC, Accession Number: 20180820–5072. CPV Shore, LLC, CPV Towantic, LLC, Comments Due: 5 p.m. ET 9/10/18. CPV Valley, LLC. Docket Numbers: ER18–2252–000. Description: Notice of Change in Applicants: MC Project Company Status of Benson Power, LLC, et al. LLC. Filed Date: 8/17/18. Description: Baseline eTariff Filing: Accession Number: 20180817–5175. Comments Due: 5 p.m. ET 9/7/18. Market-Based Rate Authorization and Request for Waivers & Blanket Docket Numbers: ER18–2118–000; Approvals to be effective 8/21/2018. ER18–2003–000; ER18–2182–000; Filed Date: 8/20/18. ER18–2066–000; ER18–2067–000; Accession Number: 20180820–5074. ER18–1981–000; ER18–2032–000. Comments Due: 5 p.m. ET 9/10/18. Applicants: Armadillo Flats Wind Project, LLC, Lorenzo Wind, LLC, Minco Docket Numbers: ER18–2253–000. IV & V Interconnection, LLC, Minco Applicants: Martins Creek, LLC. Wind IV, LLC, Minco Wind V, LLC, Description: § 205(d) Rate Filing: Pratt Wind, LLC, Wildcat Ranch Wind Reactive Service Rate Schedule Filings Project, LLC. and Request for Waiver to be effective Description: Second Amendment to 12/31/9998. July 31, 2018 et al. Armadillo Flats Filed Date: 8/20/18. Wind Project, LLC tariff filing, et al. Accession Number: 20180820–5077. daltland on DSKBBV9HB2PROD with NOTICES Comment Date: 5:00 p.m. Eastern time on September 20, 2018. VerDate Sep<11>2014 19:17 Aug 23, 2018 Jkt 244001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 42887 Comments Due: 5 p.m. ET 9/10/18. Docket Numbers: ER18–2254–000. Applicants: MC Project Company LLC. Description: § 205(d) Rate Filing: Reactive Service Rate Schedule Filings and Request for Waiver to be effective 12/31/9998. Filed Date: 8/20/18. Accession Number: 20180820–5083. Comments Due: 5 p.m. ET 9/10/18. Docket Numbers: ER18–2255–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Rate Schedule No. 265, Amendment No. 2— PV-Morgan Joint Participation to be effective 10/20/2018. Filed Date: 8/20/18. Accession Number: 20180820–5094. Comments Due: 5 p.m. ET 9/10/18. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES18–57–000. Applicants: MDU Resources Group, Inc. Description: Application for Authorization under Section 204 of the Federal Power Act of MDU Resources Group, Inc. Filed Date: 8/17/18. Accession Number: 20180817–5182. Comments Due: 5 p.m. ET 9/7/18. Docket Numbers: ES18–58–000. Applicants: Baja California Power, Inc. Description: Application for Authorization under Section 204 of the Federal Power Act of Baja California Power, Inc. Filed Date: 8/20/18. Accession Number: 20180820–5092. Comments Due: 5 p.m. ET 9/10/18. Take notice that the Commission received the following electric reliability filings Docket Numbers: RD18–7–000. Applicants: North American Electric Reliability Corporation. Description: Petition of the North American Electric Reliability Corporation for Approval of Proposed Reliability Standard BAL–002–3. Filed Date: 8/17/18. Accession Number: 20180817–5177. Comments Due: 5 p.m. ET 9/10/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern E:\FR\FM\24AUN1.SGM 24AUN1

Agencies

[Federal Register Volume 83, Number 165 (Friday, August 24, 2018)]
[Notices]
[Pages 42886-42887]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18322]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. OR18-35-000]


Notice of Petition for Declaratory Order; White Cliffs Pipeline, 
LLC

    Take notice that on August 16, 2018, pursuant to Rule 207(a)(2) of 
the Federal Energy Regulatory Commission's (Commission) Rules of 
Practice and Procedure, 18 CFR 385.207(a)(2) (2017), White Cliffs 
Pipeline, L.L.C. (White Cliff), filed a declaratory order petition 
seeking approval of certain terms and conditions of service for White 
Cliffs' portion of a joint project to provide pipeline transportation 
of natural gas liquids (NGL) from receipt points in Weld County, 
Colorado to the NGL marketing hub of Mont Belvieu, Texas. The joint 
project is being undertaken in conjunction with DCP Wattenberg 
Pipeline, LLC and DCP Southern Hills Pipeline, LLC (the DCP Parties), 
all as more fully explained in the petition.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Petitioner.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the website that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
[email protected], or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

[[Page 42887]]

    Comment Date: 5:00 p.m. Eastern time on September 20, 2018.

    Dated: August 20, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-18322 Filed 8-23-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.