Brookfield White Pine Hydro LLC; Notice of Application Accepted for Filing, Soliciting Comments, Protests, and Motions To Intervene, 42494-42495 [2018-18100]
Download as PDF
42494
Federal Register / Vol. 83, No. 163 / Wednesday, August 22, 2018 / Notices
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on September 13, 2018.
Dated: August 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18099 Filed 8–21–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
amozie on DSK3GDR082PROD with NOTICES1
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18–76–000.
Applicants: Enbridge Pipelines
(Oklahoma Transmission) L.L.C.
Description: Tariff filing per
284.123(b),(e)+(g): ECOP name change
to be effective 8/2/2018.
Filed Date: 8/13/18.
Accession Number: 20180813–5159.
Comments Due: 5 p.m. ET 9/4/18.
284.123(g) Protests Due: 5 p.m. ET
10/12/18.
Docket Number: PR18–77–000.
Applicants: Columbia Gas of Ohio,
Inc.
Description: Tariff filing per
284.123(b),(e)/: COH Rates effective July
31 2018.
Filed Date: 8/14/18.
Accession Number: 20180814–5047.
Comments/Protests Due: 5 p.m. ET
9/4/18.
Docket Number: PR18–78–000.
Applicants: Enbridge Pipelines (North
Texas) L.P.
VerDate Sep<11>2014
16:34 Aug 21, 2018
Jkt 244001
Description: Tariff filing per
284.123(b),(e)+(g): EPOT name change
to be effective 8/3/2018.
Filed Date: 8/15/18.
Accession Number: 20180815–5082.
Comments Due: 5 p.m. ET 9/5/18.
284.123(g) Protests Due: 5 p.m. ET
10/15/18.
Docket Number: PR18–79–000.
Applicants: Enbridge Pipelines (East
Texas) L.P.
Description: Tariff filing per
284.123(b),(e)+(g): EPET name change to
be effective 8/3/2018.
Filed Date: 8/15/18.
Accession Number: 20180815–5083.
Comments Due: 5 p.m. ET 9/5/18.
284.123(g) Protests Due: 5 p.m. ET
10/15/18.
Docket Numbers: RP18–1056–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing: 2018
Carlton Flow Obligations to be effective
11/1/2018.
Filed Date: 8/13/18.
Accession Number: 20180813–5077.
Comments Due: 5 p.m. ET 8/27/18.
Docket Numbers: RP18–1057–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 081518
Negotiated Rates—Spotlight Energy,
LLC R–7725–03 to be effective
10/1/2018.
Filed Date: 8/15/18.
Accession Number: 20180815–5018.
Comments Due: 5 p.m. ET 8/27/18.
Docket Numbers: RP18–1058–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 081518
Negotiated Rates—Spotlight Energy,
LLC R–7725–04 to be effective
10/1/2018.
Filed Date: 8/15/18.
Accession Number: 20180815–5019.
Comments Due: 5 p.m. ET 8/27/18.
Docket Numbers: RP18–1059–000.
Applicants: Old Dominion Electric
Cooperative, Inc.
Description: Petition for Temporary
Waivers of Capacity Release
Regulations, et al. of Old Dominion
Electric Cooperative.
Filed Date: 8/13/18.
Accession Number: 20180813–5215.
Comments Due: 5 p.m. ET 8/27/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18098 Filed 8–21–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2322–067]
Brookfield White Pine Hydro LLC;
Notice of Application Accepted for
Filing, Soliciting Comments, Protests,
and Motions To Intervene
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of proceeding: Extension of
license term.
b. Project No: P–2322–067.
c. Date Filed: August 1, 2018.
d. Licensee: Brookfield White Pine
Hydro LLC.
e. Name and location of project:
Shawmut Hydroelectric Project, located
on the Kennebec River in Somerset
County, Maine.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
g. Applicant Contact: Kelly Maloney,
Northeast Compliance Manager,
Brookfield White Pine Hydro LLC, 150
Main Street, Lewiston, ME 04240; (207)
775–5606.
h. FERC Contact: B. Peter Yarrington
at (202) 502–6129, or peter.yarrington@
ferc.gov.
i. Deadline for filing comments,
motions to intervene, and protests: 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file motions to intervene,
protests, comments, and
recommendations, using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
E:\FR\FM\22AUN1.SGM
22AUN1
amozie on DSK3GDR082PROD with NOTICES1
Federal Register / Vol. 83, No. 163 / Wednesday, August 22, 2018 / Notices
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include the docket number P–2322–067.
j. Description of Proceeding:
Brookfield White Pine Hydro LLC,
licensee for the Shawmut Project,
requests a 1-year extension of the term
of the project license, from January 31,
2021, to January 31, 2022. The extension
would give the licensee an additional
year to file its Final License Application
(FLA) for the project, which would then
be due January 31, 2020. The licensee
indicates that the extension would not
affect any other submittal deadlines
under the existing relicensing schedule.
The licensee requests an extension of
the license term so that it can complete,
cooperatively with state and federal
resource agencies and other entities, a
feasibility assessment of options to
provide multi-dam fish passage on the
Kennebec River. The options would
include, but not be limited to,
alternative designs included in the
approved Interim Species Protection
Plan (Interim SPP) for the Shawmut
Project, Weston Project (P–2325), and
Lockwood Project (P–2574), as well as
the approved Interim SPP for the HydroKennebec Project (P–2611). These two
Interim SPPs were developed for the
projects to help ensure the protection of,
and passage for, Atlantic salmon that
use the Kennebec River and that are
listed as endangered under the
Endangered Species Act. The licensee
proposes to develop, in consultation
with the resource agencies, a single
basin-wide Final SPP and draft
Biological Assessment for the four
projects together, which would be filed
ahead of the December 31, 2019
expiration of the Interim SPPs, and
concurrently with the Shawmut Project
FLA. The licensee included with its
request correspondence from the
National Marine Fisheries Service, U.S.
Fish and Wildlife Service, Maine
Department of Marine Resources, and
Maine Department of Inland Fisheries
and Wildlife supporting the request.
k. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE, Washington, DC
20426. The filing may also be viewed on
the Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
VerDate Sep<11>2014
16:34 Aug 21, 2018
Jkt 244001
Enter the Docket number (P–2322–067)
excluding the last three digits in the
docket number field to access the
notice. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676, or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on, or before, the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filing must: (1) Bear in
all capital letters the title COMMENTS,
PROTEST, or MOTION TO INTERVENE
as applicable; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the request to
extend the license term. Agencies may
obtain copies of the application directly
from the applicant. A copy of any
protest or motion to intervene must be
served upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
42495
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: August 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–18100 Filed 8–21–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1520–004;
ER10–1521–004; ER10–1522–003.
Applicants: Occidental Power
Marketing, L.P., Occidental Power
Services, Inc., Occidental Chemical
Corporation.
Description: Supplement to June 29,
2018 Updated Market Power Analysis
for the Central Region of the Occidental
MBRA Entities.
Filed Date: 8/15/18.
Accession Number: 20180815–5138.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: ER16–2632–005.
Applicants: Trans Bay Cable LLC.
Description: Report Filing: Refund
Report Filing to be effective N/A.
Filed Date: 8/16/18.
Accession Number: 20180816–5093.
Comments Due: 5 p.m. ET 9/6/18.
Docket Numbers: ER17–2327–002.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
Compliance Regulated Transmission
Cost Recovery to be effective
10/18/2017.
Filed Date: 8/16/18.
Accession Number: 20180816–5066.
Comments Due: 5 p.m. ET 9/6/18.
Docket Numbers: ER18–1859–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–08–16_SA 2840 Entergy ArkansasStuttgart Solar LLC Sub 1st Rev GIA
(J348) to be effective 6/18/2018.
Filed Date: 8/16/18.
Accession Number: 20180816–5102.
Comments Due: 5 p.m. ET 9/6/18.
Docket Numbers: ER18–1990–000.
Applicants: Stonepeak Kestrel Energy
Marketing LLC.
Description: Supplement to July 10,
2018 Stonepeak Kestrel Energy
Marketing LLC tariff filing.
Filed Date: 8/13/18.
Accession Number: 20180813–5228.
Comments Due: 5 p.m. ET 8/27/18.
E:\FR\FM\22AUN1.SGM
22AUN1
Agencies
[Federal Register Volume 83, Number 163 (Wednesday, August 22, 2018)]
[Notices]
[Pages 42494-42495]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18100]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2322-067]
Brookfield White Pine Hydro LLC; Notice of Application Accepted
for Filing, Soliciting Comments, Protests, and Motions To Intervene
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of proceeding: Extension of license term.
b. Project No: P-2322-067.
c. Date Filed: August 1, 2018.
d. Licensee: Brookfield White Pine Hydro LLC.
e. Name and location of project: Shawmut Hydroelectric Project,
located on the Kennebec River in Somerset County, Maine.
f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
g. Applicant Contact: Kelly Maloney, Northeast Compliance Manager,
Brookfield White Pine Hydro LLC, 150 Main Street, Lewiston, ME 04240;
(207) 775-5606.
h. FERC Contact: B. Peter Yarrington at (202) 502-6129, or
[email protected].
i. Deadline for filing comments, motions to intervene, and
protests: 30 days from the issuance of this notice by the Commission.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, and recommendations, using
the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system
[[Page 42495]]
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include the
docket number P-2322-067.
j. Description of Proceeding: Brookfield White Pine Hydro LLC,
licensee for the Shawmut Project, requests a 1-year extension of the
term of the project license, from January 31, 2021, to January 31,
2022. The extension would give the licensee an additional year to file
its Final License Application (FLA) for the project, which would then
be due January 31, 2020. The licensee indicates that the extension
would not affect any other submittal deadlines under the existing
relicensing schedule.
The licensee requests an extension of the license term so that it
can complete, cooperatively with state and federal resource agencies
and other entities, a feasibility assessment of options to provide
multi-dam fish passage on the Kennebec River. The options would
include, but not be limited to, alternative designs included in the
approved Interim Species Protection Plan (Interim SPP) for the Shawmut
Project, Weston Project (P-2325), and Lockwood Project (P-2574), as
well as the approved Interim SPP for the Hydro-Kennebec Project (P-
2611). These two Interim SPPs were developed for the projects to help
ensure the protection of, and passage for, Atlantic salmon that use the
Kennebec River and that are listed as endangered under the Endangered
Species Act. The licensee proposes to develop, in consultation with the
resource agencies, a single basin-wide Final SPP and draft Biological
Assessment for the four projects together, which would be filed ahead
of the December 31, 2019 expiration of the Interim SPPs, and
concurrently with the Shawmut Project FLA. The licensee included with
its request correspondence from the National Marine Fisheries Service,
U.S. Fish and Wildlife Service, Maine Department of Marine Resources,
and Maine Department of Inland Fisheries and Wildlife supporting the
request.
k. This notice is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street NE,
Washington, DC 20426. The filing may also be viewed on the Commission's
website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the
Docket number (P-2322-067) excluding the last three digits in the
docket number field to access the notice. You may also register online
at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
email of new filings and issuances related to this or other pending
projects. For assistance, call toll-free 1-866-208-3676, or email
[email protected]. For TTY, call (202) 502-8659.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on, or before, the specified
comment date for the particular application.
n. Filing and Service of Responsive Documents: Any filing must: (1)
Bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO
INTERVENE as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions
to intervene, or protests must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). All comments,
motions to intervene, or protests should relate to the request to
extend the license term. Agencies may obtain copies of the application
directly from the applicant. A copy of any protest or motion to
intervene must be served upon each representative of the applicant
specified in the particular application. If an intervener files
comments or documents with the Commission relating to the merits of an
issue that may affect the responsibilities of a particular resource
agency, they must also serve a copy of the document on that resource
agency. A copy of all other filings in reference to this application
must be accompanied by proof of service on all persons listed in the
service list prepared by the Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and 385.2010.
Dated: August 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-18100 Filed 8-21-18; 8:45 am]
BILLING CODE 6717-01-P