Shell Energy North America (US), L.P.; Notice of Meeting, 42284 [2018-18005]

Download as PDF 42284 Federal Register / Vol. 83, No. 162 / Tuesday, August 21, 2018 / Notices FERC–537 (GAS PIPELINE CERTIFICATES: CONSTRUCTION, ACQUISITION, AND ABANDONMENT)—Continued Number of respondents Annual number of responses per respondent Total number of responses Average burden and cost per response 2 Total annual burden hours and total annual cost Cost per respondent ($) (1) (2) (1) * (2) = (3) (4) (3) * (4) = (5) (5) ÷ (1) 3 18 CFR 284.13(e) and 284.126(a) (Interstate and Intrastate Bypass Notice). 18 CFR 284.221 (Blanket Certificates) 6. 18 CFR 224 (Hinshaw Blanket Certificates). 18 CFR 157.5–.11; 157.13–.20 (Nonfacility Certificate or Abandonment Applications. Total ................. 2 1 2 30 hrs.; $2,370 .......... 60 hrs.; $4,740 ................... 2,370 5 7 1.4 7 100 hrs.; $7,900 ........ 700 hrs.; $55,300 ............... 11,060 2 1 2 75 hrs.; $5,925 .......... 150 hrs.; $11,850 ............... 5,925 3 1 3 75 hrs.; $5,925 .......... 225 hrs.; $17,775 ............... 5,925 ........................ ........................ 8 335 .................................... 50,935 hrs.; $4,023,865 ..... ........................ Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: August 14, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–18002 Filed 8–20–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14795–002] sradovich on DSK3GMQ082PROD with NOTICES Shell Energy North America (US), L.P.; Notice of Meeting Environmental staff of the Federal Energy Regulatory Commission (Commission) will participate in a meeting, via telephone, with representatives of Shell Energy North America, the Confederated Tribes of the Colville Reservation, and the U.S. Army Corps of Engineers to continue the on- VerDate Sep<11>2014 17:31 Aug 20, 2018 Jkt 244001 going discussion of potential impacts to cultural resources from the proposed Hydro Battery Pearl Hill Pumped Storage Project. The meeting will be held at the location and time listed below: Executive Conference Room at the Executive Conference Center at the Spokane International Airport, 9000 W. Airport Drive, Spokane, Washington 99224, (located adjacent to the lower level baggage claim and parking areas), August 30, 2018, 9:30 a.m. to 12:00 p.m. PST, Call-in lines will be available. Members of the public and intervenors in the referenced proceeding may attend and observe this meeting, in person or via telephone. If tribal representatives decide to disclose information about a specific location which could create a risk or harm to an archeological site or Native American cultural resource, the public will be excused for that portion of the meeting. A summary of the meeting will be entered into the Commission’s administrative record. If you plan to attend this meeting, in person or via telephone, please contact Brent Hicks of HRA Associates (contractor for Shell Energy) at (206) 343–0226 or bhicks@hrassoc.com. Dated: August 14, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–18005 Filed 8–20–18; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–139–000. Applicants: Lower Mount Bethel Energy, LLC, Martins Creek, LLC, LMBE Project Company LLC, MC Project Company LLC. Description: Joint Application for Approval under Section 203 of the Federal Power Act, et al. of Lower Mount Bethel Energy, LLC, et al. Filed Date: 8/14/18. Accession Number: 20180814–5143. Comments Due: 5 p.m. ET 9/4/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–1584–000. Applicants: Mississippi Power Company. Description: Response of Mississippi Power Company to July 13, 2018 letter requesting additional information. Filed Date: 8/14/18. Accession Number: 20180814–5140. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–1731–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2018–08–15_Deficiency response of MISO TOs for Cost Recovery to be effective 8/1/2018. Filed Date: 8/15/18. E:\FR\FM\21AUN1.SGM 21AUN1

Agencies

[Federal Register Volume 83, Number 162 (Tuesday, August 21, 2018)]
[Notices]
[Page 42284]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18005]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14795-002]


Shell Energy North America (US), L.P.; Notice of Meeting

    Environmental staff of the Federal Energy Regulatory Commission 
(Commission) will participate in a meeting, via telephone, with 
representatives of Shell Energy North America, the Confederated Tribes 
of the Colville Reservation, and the U.S. Army Corps of Engineers to 
continue the on-going discussion of potential impacts to cultural 
resources from the proposed Hydro Battery Pearl Hill Pumped Storage 
Project. The meeting will be held at the location and time listed 
below:

Executive Conference Room at the Executive Conference Center at the 
Spokane International Airport, 9000 W. Airport Drive, Spokane, 
Washington 99224, (located adjacent to the lower level baggage claim 
and parking areas), August 30, 2018, 9:30 a.m. to 12:00 p.m. PST, Call-
in lines will be available.
    Members of the public and intervenors in the referenced proceeding 
may attend and observe this meeting, in person or via telephone. If 
tribal representatives decide to disclose information about a specific 
location which could create a risk or harm to an archeological site or 
Native American cultural resource, the public will be excused for that 
portion of the meeting. A summary of the meeting will be entered into 
the Commission's administrative record.
    If you plan to attend this meeting, in person or via telephone, 
please contact Brent Hicks of HRA Associates (contractor for Shell 
Energy) at (206) 343-0226 or [email protected].

    Dated: August 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-18005 Filed 8-20-18; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.