Shell Energy North America (US), L.P.; Notice of Meeting, 42284 [2018-18005]
Download as PDF
42284
Federal Register / Vol. 83, No. 162 / Tuesday, August 21, 2018 / Notices
FERC–537 (GAS PIPELINE CERTIFICATES: CONSTRUCTION, ACQUISITION, AND ABANDONMENT)—Continued
Number of
respondents
Annual
number of
responses per
respondent
Total number
of responses
Average burden
and cost per
response 2
Total annual
burden hours
and total
annual cost
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1) 3
18 CFR 284.13(e)
and 284.126(a)
(Interstate and
Intrastate Bypass
Notice).
18 CFR 284.221
(Blanket Certificates) 6.
18 CFR 224
(Hinshaw Blanket
Certificates).
18 CFR 157.5–.11;
157.13–.20 (Nonfacility Certificate
or Abandonment
Applications.
Total .................
2
1
2
30 hrs.; $2,370 ..........
60 hrs.; $4,740 ...................
2,370
5
7 1.4
7
100 hrs.; $7,900 ........
700 hrs.; $55,300 ...............
11,060
2
1
2
75 hrs.; $5,925 ..........
150 hrs.; $11,850 ...............
5,925
3
1
3
75 hrs.; $5,925 ..........
225 hrs.; $17,775 ...............
5,925
........................
........................
8 335
....................................
50,935 hrs.; $4,023,865 .....
........................
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: August 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–18002 Filed 8–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14795–002]
sradovich on DSK3GMQ082PROD with NOTICES
Shell Energy North America (US), L.P.;
Notice of Meeting
Environmental staff of the Federal
Energy Regulatory Commission
(Commission) will participate in a
meeting, via telephone, with
representatives of Shell Energy North
America, the Confederated Tribes of the
Colville Reservation, and the U.S. Army
Corps of Engineers to continue the on-
VerDate Sep<11>2014
17:31 Aug 20, 2018
Jkt 244001
going discussion of potential impacts to
cultural resources from the proposed
Hydro Battery Pearl Hill Pumped
Storage Project. The meeting will be
held at the location and time listed
below:
Executive Conference Room at the
Executive Conference Center at the
Spokane International Airport, 9000 W.
Airport Drive, Spokane, Washington
99224, (located adjacent to the lower
level baggage claim and parking areas),
August 30, 2018, 9:30 a.m. to 12:00 p.m.
PST, Call-in lines will be available.
Members of the public and
intervenors in the referenced proceeding
may attend and observe this meeting, in
person or via telephone. If tribal
representatives decide to disclose
information about a specific location
which could create a risk or harm to an
archeological site or Native American
cultural resource, the public will be
excused for that portion of the meeting.
A summary of the meeting will be
entered into the Commission’s
administrative record.
If you plan to attend this meeting, in
person or via telephone, please contact
Brent Hicks of HRA Associates
(contractor for Shell Energy) at (206)
343–0226 or bhicks@hrassoc.com.
Dated: August 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–18005 Filed 8–20–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–139–000.
Applicants: Lower Mount Bethel
Energy, LLC, Martins Creek, LLC, LMBE
Project Company LLC, MC Project
Company LLC.
Description: Joint Application for
Approval under Section 203 of the
Federal Power Act, et al. of Lower
Mount Bethel Energy, LLC, et al.
Filed Date: 8/14/18.
Accession Number: 20180814–5143.
Comments Due: 5 p.m. ET 9/4/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1584–000.
Applicants: Mississippi Power
Company.
Description: Response of Mississippi
Power Company to July 13, 2018 letter
requesting additional information.
Filed Date: 8/14/18.
Accession Number: 20180814–5140.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: ER18–1731–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–08–15_Deficiency response of
MISO TOs for Cost Recovery to be
effective 8/1/2018.
Filed Date: 8/15/18.
E:\FR\FM\21AUN1.SGM
21AUN1
Agencies
[Federal Register Volume 83, Number 162 (Tuesday, August 21, 2018)]
[Notices]
[Page 42284]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18005]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14795-002]
Shell Energy North America (US), L.P.; Notice of Meeting
Environmental staff of the Federal Energy Regulatory Commission
(Commission) will participate in a meeting, via telephone, with
representatives of Shell Energy North America, the Confederated Tribes
of the Colville Reservation, and the U.S. Army Corps of Engineers to
continue the on-going discussion of potential impacts to cultural
resources from the proposed Hydro Battery Pearl Hill Pumped Storage
Project. The meeting will be held at the location and time listed
below:
Executive Conference Room at the Executive Conference Center at the
Spokane International Airport, 9000 W. Airport Drive, Spokane,
Washington 99224, (located adjacent to the lower level baggage claim
and parking areas), August 30, 2018, 9:30 a.m. to 12:00 p.m. PST, Call-
in lines will be available.
Members of the public and intervenors in the referenced proceeding
may attend and observe this meeting, in person or via telephone. If
tribal representatives decide to disclose information about a specific
location which could create a risk or harm to an archeological site or
Native American cultural resource, the public will be excused for that
portion of the meeting. A summary of the meeting will be entered into
the Commission's administrative record.
If you plan to attend this meeting, in person or via telephone,
please contact Brent Hicks of HRA Associates (contractor for Shell
Energy) at (206) 343-0226 or [email protected].
Dated: August 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-18005 Filed 8-20-18; 8:45 am]
BILLING CODE 6717-01-P