Combined Notice of Filings #1, 42285-42286 [2018-18001]

Download as PDF sradovich on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 83, No. 162 / Tuesday, August 21, 2018 / Notices Accession Number: 20180815–5050. Comments Due: 5 p.m. ET 9/5/18. Docket Numbers: ER18–2157–001. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: Tariff Amendment: MAIT submits an Amendment to the ECSA SA No. 4974 to be effective 10/5/2018. Filed Date: 8/15/18. Accession Number: 20180815–5086. Comments Due: 5 p.m. ET 9/5/18. Docket Numbers: ER18–2217–000. Applicants: Buckleberry Solar, LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authority, Blanket Approval and Waivers to be effective 9/19/2018. Filed Date: 8/15/18. Accession Number: 20180815–5000. Comments Due: 5 p.m. ET 9/5/18. Docket Numbers: ER18–2218–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3434 East Texas Electric Cooperative NITSA and NOA to be effective 1/1/2018. Filed Date: 8/15/18. Accession Number: 20180815–5021. Comments Due: 5 p.m. ET 9/5/18. Docket Numbers: ER18–2219–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of WMPA SA No. 4742; Queue No. AC1–045 to be effective 10/1/2018. Filed Date: 8/15/18. Accession Number: 20180815–5048. Comments Due: 5 p.m. ET 9/5/18. Docket Numbers: ER18–2220–000. Applicants: Midcontinent Independent System Operator, Inc., Great River Energy. Description: § 205(d) Rate Filing: 2018–08–15_SA 3148 NSPM–GRE T–T (McHenry-Magic City) to be effective 8/14/2018. Filed Date: 8/15/18. Accession Number: 20180815–5073. Comments Due: 5 p.m. ET 9/5/18. Docket Numbers: ER18–2221–000. Applicants: Midcontinent Independent System Operator, Inc., Great River Energy. Description: § 205(d) Rate Filing: 2018–08–15_SA 3149 NSPM–GRE T–T (Riverview) to be effective 8/14/2018. Filed Date: 8/15/18. Accession Number: 20180815–5081. Comments Due: 5 p.m. ET 9/5/18. Take notice that the Commission received the following qualifying facility filings: Docket Numbers: QF17–673–002. Applicants: Beaver Creek Wind II, LLC. VerDate Sep<11>2014 17:31 Aug 20, 2018 Jkt 244001 Description: Application for Recertification of Beaver Creek Wind II, LLC. Filed Date: 8/14/18. Accession Number: 20180814–5137. Comments Due: 5 p.m. ET 9/4/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 15, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–17997 Filed 8–20–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–2217–000] Buckleberry Solar, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Buckleberry Solar, LLC‘s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 42285 authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 4, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 15, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–17992 Filed 8–20–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG18–121–000. Applicants: Blue Cloud Wind Energy, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status for Blue Cloud Wind Energy, LLC. Filed Date: 8/14/18. Accession Number: 20180814–5039. Comments Due: 5 p.m. ET 9/4/18. Take notice that the Commission received the following electric rate filings: E:\FR\FM\21AUN1.SGM 21AUN1 sradovich on DSK3GMQ082PROD with NOTICES 42286 Federal Register / Vol. 83, No. 162 / Tuesday, August 21, 2018 / Notices Docket Numbers: ER18–1410–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2018–08–13_Deficiency Response to Merchant HVDC Filing to be effective 7/19/2018. Filed Date: 8/13/18. Accession Number: 20180813–5182. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–2207–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: Engineering Agreement for CCSF Potrero Interconnection Project (SA 284) to be effective 8/14/2018. Filed Date: 8/13/18. Accession Number: 20180813–5188. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–2208–000. Applicants: New England Power Pool Participants Committee. Description: § 205(d) Rate Filing: 132nd Agreement to be effective 11/1/ 2018. Filed Date: 8/14/18. Accession Number: 20180814–5001. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–2209–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Corrections to Revisions in ER18–750 Re Long Term Firm Transmission Service Req to be effective 10/15/2018. Filed Date: 8/14/18. Accession Number: 20180814–5043. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–2210–000. Applicants: MidAmerican Energy Company, Interstate Power and Light Company. Description: § 205(d) Rate Filing: IPL—MEC Remote LBA Agreement to be effective 10/15/2018. Filed Date: 8/14/18. Accession Number: 20180814–5048. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–2211–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: LGIA Tropico Solar Project SA No. 212 to be effective 10/14/2018. Filed Date: 8/14/18. Accession Number: 20180814–5052. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–2212–000. Applicants: The Potomac Edison Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Potomac submits Two Borderline Agreements, SA Nos. 5114 and 5115 (IA) to be effective 10/14/2018. Filed Date: 8/14/18. Accession Number: 20180814–5088. VerDate Sep<11>2014 17:31 Aug 20, 2018 Jkt 244001 Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–2213–000. Applicants: MidAmerican Energy Company. Description: § 205(d) Rate Filing: Filing of RLBAA with IPL for English Farms to be effective 10/12/2018. Filed Date: 8/14/18. Accession Number: 20180814–5099. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–2214–000. Applicants: Stryker 22, LLC. Description: Baseline eTariff Filing: FERC Electric Tariff No. 1 to be effective 8/15/2018. Filed Date: 8/14/18. Accession Number: 20180814–5100. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–2215–000. Applicants: MidAmerican Energy Company. Description: § 205(d) Rate Filing: RLBAA with IPL for Upland Prairie to be effective 10/12/2018. Filed Date: 8/14/18. Accession Number: 20180814–5101. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–2216–000. Applicants: Plumsted 537 LLC. Description: Baseline eTariff Filing: MBRA Tariff to be effective 8/15/2018. Filed Date: 8/14/18. Accession Number: 20180814–5102. Comments Due: 5 p.m. ET 9/4/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 14, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–18001 Filed 8–20–18; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 ENVIRONMENTAL PROTECTION AGENCY [FRL–9982–55—Region 8] Settlement Agreement and Order on Consent: Eagle Mine Superfund Site, Minturn, Eagle County, Colorado Environmental Protection Agency (EPA). ACTION: Notice of proposed agreement; request for public comment. AGENCY: In accordance with the requirements of section 122 of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (‘‘CERCLA’’), notice is hereby given of the proposed settlement under section 122(h)(1) of CERCLA, between the U.S. Environmental Protection Agency (‘‘EPA’’), the Colorado Department of Public Health and Environment (‘‘CDPHE’’), and Battle North, LLC and Battle South, LLC (‘‘Owners’’). The proposed Settlement Agreement provides for the performance of work by Owners, the payment of certain response costs incurred, or to be incurred, by the United States, and the release and waiver of a lien at or in connection with the Property. The Owners consent to and will not contest the authority of the United States to enter into the Agreement or to implement or enforce its terms. CDPHE and Owners recognize that the Agreement has been negotiated in good faith and that the Agreement is entered into without the admission or adjudication of any issue of fact or law. DATES: Comments must be submitted on or before September 20, 2018. For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the agreement. The Agency will consider all comments received and may modify or withdraw its consent to the agreement if comments received disclose facts or considerations that indicate that the agreement is inappropriate, improper, or inadequate. ADDRESSES: The proposed agreement and additional background information relating to the agreement, as well as the Agency’s response to any comments are or will be available for public inspection at the EPA Superfund Record Center, 1595 Wynkoop Street, Denver, Colorado, by appointment. Comments and requests for a copy of the proposed agreement should be addressed to Matt Hogue, Enforcement Specialist, Environmental Protection Agency— Region 8, Mail Code 8ENF–RC, 1595 Wynkoop Street, Denver, Colorado SUMMARY: E:\FR\FM\21AUN1.SGM 21AUN1

Agencies

[Federal Register Volume 83, Number 162 (Tuesday, August 21, 2018)]
[Notices]
[Pages 42285-42286]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-18001]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG18-121-000.
    Applicants: Blue Cloud Wind Energy, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status for Blue Cloud Wind Energy, LLC.
    Filed Date: 8/14/18.
    Accession Number: 20180814-5039.
    Comments Due: 5 p.m. ET 9/4/18.

    Take notice that the Commission received the following electric 
rate filings:


[[Page 42286]]


    Docket Numbers: ER18-1410-001.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Tariff Amendment: 2018-08-13_Deficiency Response to 
Merchant HVDC Filing to be effective 7/19/2018.
    Filed Date: 8/13/18.
    Accession Number: 20180813-5182.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-2207-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: Engineering Agreement for 
CCSF Potrero Interconnection Project (SA 284) to be effective 8/14/
2018.
    Filed Date: 8/13/18.
    Accession Number: 20180813-5188.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-2208-000.
    Applicants: New England Power Pool Participants Committee.
    Description: Sec.  205(d) Rate Filing: 132nd Agreement to be 
effective 11/1/2018.
    Filed Date: 8/14/18.
    Accession Number: 20180814-5001.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-2209-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Corrections to Revisions in 
ER18-750 Re Long Term Firm Transmission Service Req to be effective 10/
15/2018.
    Filed Date: 8/14/18.
    Accession Number: 20180814-5043.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-2210-000.
    Applicants: MidAmerican Energy Company, Interstate Power and Light 
Company.
    Description: Sec.  205(d) Rate Filing: IPL--MEC Remote LBA 
Agreement to be effective 10/15/2018.
    Filed Date: 8/14/18.
    Accession Number: 20180814-5048.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-2211-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: LGIA Tropico Solar Project 
SA No. 212 to be effective 10/14/2018.
    Filed Date: 8/14/18.
    Accession Number: 20180814-5052.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-2212-000.
    Applicants: The Potomac Edison Company, PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Potomac submits Two 
Borderline Agreements, SA Nos. 5114 and 5115 (IA) to be effective 10/
14/2018.
    Filed Date: 8/14/18.
    Accession Number: 20180814-5088.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-2213-000.
    Applicants: MidAmerican Energy Company.
    Description: Sec.  205(d) Rate Filing: Filing of RLBAA with IPL for 
English Farms to be effective 10/12/2018.
    Filed Date: 8/14/18.
    Accession Number: 20180814-5099.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-2214-000.
    Applicants: Stryker 22, LLC.
    Description: Baseline eTariff Filing: FERC Electric Tariff No. 1 to 
be effective 8/15/2018.
    Filed Date: 8/14/18.
    Accession Number: 20180814-5100.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-2215-000.
    Applicants: MidAmerican Energy Company.
    Description: Sec.  205(d) Rate Filing: RLBAA with IPL for Upland 
Prairie to be effective 10/12/2018.
    Filed Date: 8/14/18.
    Accession Number: 20180814-5101.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-2216-000.
    Applicants: Plumsted 537 LLC.
    Description: Baseline eTariff Filing: MBRA Tariff to be effective 
8/15/2018.
    Filed Date: 8/14/18.
    Accession Number: 20180814-5102.
    Comments Due: 5 p.m. ET 9/4/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: August 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-18001 Filed 8-20-18; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.