Download as PDF 42284 Federal Register / Vol. 83, No. 162 / Tuesday, August 21, 2018 / Notices FERC–537 (GAS PIPELINE CERTIFICATES: CONSTRUCTION, ACQUISITION, AND ABANDONMENT)—Continued Number of respondents Annual number of responses per respondent Total number of responses Average burden and cost per response 2 Total annual burden hours and total annual cost Cost per respondent ($) (1) (2) (1) * (2) = (3) (4) (3) * (4) = (5) (5) ÷ (1) 3 18 CFR 284.13(e) and 284.126(a) (Interstate and Intrastate Bypass Notice). 18 CFR 284.221 (Blanket Certificates) 6. 18 CFR 224 (Hinshaw Blanket Certificates). 18 CFR 157.5–.11; 157.13–.20 (Nonfacility Certificate or Abandonment Applications. Total ................. 2 1 2 30 hrs.; $2,370 .......... 60 hrs.; $4,740 ................... 2,370 5 7 1.4 7 100 hrs.; $7,900 ........ 700 hrs.; $55,300 ............... 11,060 2 1 2 75 hrs.; $5,925 .......... 150 hrs.; $11,850 ............... 5,925 3 1 3 75 hrs.; $5,925 .......... 225 hrs.; $17,775 ............... 5,925 ........................ ........................ 8 335 .................................... 50,935 hrs.; $4,023,865 ..... ........................ Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: August 14, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–18002 Filed 8–20–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14795–002] sradovich on DSK3GMQ082PROD with NOTICES Shell Energy North America (US), L.P.; Notice of Meeting Environmental staff of the Federal Energy Regulatory Commission (Commission) will participate in a meeting, via telephone, with representatives of Shell Energy North America, the Confederated Tribes of the Colville Reservation, and the U.S. Army Corps of Engineers to continue the on- VerDate Sep<11>2014 17:31 Aug 20, 2018 Jkt 244001 going discussion of potential impacts to cultural resources from the proposed Hydro Battery Pearl Hill Pumped Storage Project. The meeting will be held at the location and time listed below: Executive Conference Room at the Executive Conference Center at the Spokane International Airport, 9000 W. Airport Drive, Spokane, Washington 99224, (located adjacent to the lower level baggage claim and parking areas), August 30, 2018, 9:30 a.m. to 12:00 p.m. PST, Call-in lines will be available. Members of the public and intervenors in the referenced proceeding may attend and observe this meeting, in person or via telephone. If tribal representatives decide to disclose information about a specific location which could create a risk or harm to an archeological site or Native American cultural resource, the public will be excused for that portion of the meeting. A summary of the meeting will be entered into the Commission’s administrative record. If you plan to attend this meeting, in person or via telephone, please contact Brent Hicks of HRA Associates (contractor for Shell Energy) at (206) 343–0226 or bhicks@hrassoc.com. Dated: August 14, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–18005 Filed 8–20–18; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–139–000. Applicants: Lower Mount Bethel Energy, LLC, Martins Creek, LLC, LMBE Project Company LLC, MC Project Company LLC. Description: Joint Application for Approval under Section 203 of the Federal Power Act, et al. of Lower Mount Bethel Energy, LLC, et al. Filed Date: 8/14/18. Accession Number: 20180814–5143. Comments Due: 5 p.m. ET 9/4/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–1584–000. Applicants: Mississippi Power Company. Description: Response of Mississippi Power Company to July 13, 2018 letter requesting additional information. Filed Date: 8/14/18. Accession Number: 20180814–5140. Comments Due: 5 p.m. ET 9/4/18. Docket Numbers: ER18–1731–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2018–08–15_Deficiency response of MISO TOs for Cost Recovery to be effective 8/1/2018. Filed Date: 8/15/18. E:\FR\FM\21AUN1.SGM 21AUN1 sradovich on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 83, No. 162 / Tuesday, August 21, 2018 / Notices Accession Number: 20180815–5050. Comments Due: 5 p.m. ET 9/5/18. Docket Numbers: ER18–2157–001. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: Tariff Amendment: MAIT submits an Amendment to the ECSA SA No. 4974 to be effective 10/5/2018. Filed Date: 8/15/18. Accession Number: 20180815–5086. Comments Due: 5 p.m. ET 9/5/18. Docket Numbers: ER18–2217–000. Applicants: Buckleberry Solar, LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authority, Blanket Approval and Waivers to be effective 9/19/2018. Filed Date: 8/15/18. Accession Number: 20180815–5000. Comments Due: 5 p.m. ET 9/5/18. Docket Numbers: ER18–2218–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3434 East Texas Electric Cooperative NITSA and NOA to be effective 1/1/2018. Filed Date: 8/15/18. Accession Number: 20180815–5021. Comments Due: 5 p.m. ET 9/5/18. Docket Numbers: ER18–2219–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of WMPA SA No. 4742; Queue No. AC1–045 to be effective 10/1/2018. Filed Date: 8/15/18. Accession Number: 20180815–5048. Comments Due: 5 p.m. ET 9/5/18. Docket Numbers: ER18–2220–000. Applicants: Midcontinent Independent System Operator, Inc., Great River Energy. Description: § 205(d) Rate Filing: 2018–08–15_SA 3148 NSPM–GRE T–T (McHenry-Magic City) to be effective 8/14/2018. Filed Date: 8/15/18. Accession Number: 20180815–5073. Comments Due: 5 p.m. ET 9/5/18. Docket Numbers: ER18–2221–000. Applicants: Midcontinent Independent System Operator, Inc., Great River Energy. Description: § 205(d) Rate Filing: 2018–08–15_SA 3149 NSPM–GRE T–T (Riverview) to be effective 8/14/2018. Filed Date: 8/15/18. Accession Number: 20180815–5081. Comments Due: 5 p.m. ET 9/5/18. Take notice that the Commission received the following qualifying facility filings: Docket Numbers: QF17–673–002. Applicants: Beaver Creek Wind II, LLC. VerDate Sep<11>2014 17:31 Aug 20, 2018 Jkt 244001 Description: Application for Recertification of Beaver Creek Wind II, LLC. Filed Date: 8/14/18. Accession Number: 20180814–5137. Comments Due: 5 p.m. ET 9/4/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 15, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–17997 Filed 8–20–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–2217–000] Buckleberry Solar, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Buckleberry Solar, LLC‘s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 42285 authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 4, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 15, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–17992 Filed 8–20–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG18–121–000. Applicants: Blue Cloud Wind Energy, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status for Blue Cloud Wind Energy, LLC. Filed Date: 8/14/18. Accession Number: 20180814–5039. Comments Due: 5 p.m. ET 9/4/18. Take notice that the Commission received the following electric rate filings: E:\FR\FM\21AUN1.SGM 21AUN1

Agencies

[Federal Register Volume 83, Number 162 (Tuesday, August 21, 2018)]
[Notices]
[Pages 42284-42285]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-17997]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC18-139-000.
    Applicants: Lower Mount Bethel Energy, LLC, Martins Creek, LLC, 
LMBE Project Company LLC, MC Project Company LLC.
    Description: Joint Application for Approval under Section 203 of 
the Federal Power Act, et al. of Lower Mount Bethel Energy, LLC, et al.
    Filed Date: 8/14/18.
    Accession Number: 20180814-5143.
    Comments Due: 5 p.m. ET 9/4/18.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER18-1584-000.
    Applicants: Mississippi Power Company.
    Description: Response of Mississippi Power Company to July 13, 2018 
letter requesting additional information.
    Filed Date: 8/14/18.
    Accession Number: 20180814-5140.
    Comments Due: 5 p.m. ET 9/4/18.

    Docket Numbers: ER18-1731-001.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Tariff Amendment: 2018-08-15_Deficiency response of 
MISO TOs for Cost Recovery to be effective 8/1/2018.
    Filed Date: 8/15/18.

[[Page 42285]]

    Accession Number: 20180815-5050.
    Comments Due: 5 p.m. ET 9/5/18.

    Docket Numbers: ER18-2157-001.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: Tariff Amendment: MAIT submits an Amendment to the 
ECSA SA No. 4974 to be effective 10/5/2018.
    Filed Date: 8/15/18.
    Accession Number: 20180815-5086.
    Comments Due: 5 p.m. ET 9/5/18.

    Docket Numbers: ER18-2217-000.
    Applicants: Buckleberry Solar, LLC.
    Description: Baseline eTariff Filing: Application for Market-Based 
Rate Authority, Blanket Approval and Waivers to be effective 9/19/2018.
    Filed Date: 8/15/18.
    Accession Number: 20180815-5000.
    Comments Due: 5 p.m. ET 9/5/18.

    Docket Numbers: ER18-2218-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3434 East Texas Electric 
Cooperative NITSA and NOA to be effective 1/1/2018.
    Filed Date: 8/15/18.
    Accession Number: 20180815-5021.
    Comments Due: 5 p.m. ET 9/5/18.

    Docket Numbers: ER18-2219-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Cancellation: Notice of Cancellation of WMPA SA 
No. 4742; Queue No. AC1-045 to be effective 10/1/2018.
    Filed Date: 8/15/18.
    Accession Number: 20180815-5048.
    Comments Due: 5 p.m. ET 9/5/18.

    Docket Numbers: ER18-2220-000.
    Applicants: Midcontinent Independent System Operator, Inc., Great 
River Energy.
    Description: Sec.  205(d) Rate Filing: 2018-08-15_SA 3148 NSPM-GRE 
T-T (McHenry-Magic City) to be effective 8/14/2018.
    Filed Date: 8/15/18.
    Accession Number: 20180815-5073.
    Comments Due: 5 p.m. ET 9/5/18.

    Docket Numbers: ER18-2221-000.
    Applicants: Midcontinent Independent System Operator, Inc., Great 
River Energy.
    Description: Sec.  205(d) Rate Filing: 2018-08-15_SA 3149 NSPM-GRE 
T-T (Riverview) to be effective 8/14/2018.
    Filed Date: 8/15/18.
    Accession Number: 20180815-5081.
    Comments Due: 5 p.m. ET 9/5/18.

    Take notice that the Commission received the following qualifying 
facility filings:
    Docket Numbers: QF17-673-002.
    Applicants: Beaver Creek Wind II, LLC.
    Description: Application for Recertification of Beaver Creek Wind 
II, LLC.
    Filed Date: 8/14/18.
    Accession Number: 20180814-5137.
    Comments Due: 5 p.m. ET 9/4/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: August 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-17997 Filed 8-20-18; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.