Combined Notice of Filings #1, 42284-42285 [2018-17997]
Download as PDF
42284
Federal Register / Vol. 83, No. 162 / Tuesday, August 21, 2018 / Notices
FERC–537 (GAS PIPELINE CERTIFICATES: CONSTRUCTION, ACQUISITION, AND ABANDONMENT)—Continued
Number of
respondents
Annual
number of
responses per
respondent
Total number
of responses
Average burden
and cost per
response 2
Total annual
burden hours
and total
annual cost
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1) 3
18 CFR 284.13(e)
and 284.126(a)
(Interstate and
Intrastate Bypass
Notice).
18 CFR 284.221
(Blanket Certificates) 6.
18 CFR 224
(Hinshaw Blanket
Certificates).
18 CFR 157.5–.11;
157.13–.20 (Nonfacility Certificate
or Abandonment
Applications.
Total .................
2
1
2
30 hrs.; $2,370 ..........
60 hrs.; $4,740 ...................
2,370
5
7 1.4
7
100 hrs.; $7,900 ........
700 hrs.; $55,300 ...............
11,060
2
1
2
75 hrs.; $5,925 ..........
150 hrs.; $11,850 ...............
5,925
3
1
3
75 hrs.; $5,925 ..........
225 hrs.; $17,775 ...............
5,925
........................
........................
8 335
....................................
50,935 hrs.; $4,023,865 .....
........................
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: August 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–18002 Filed 8–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14795–002]
sradovich on DSK3GMQ082PROD with NOTICES
Shell Energy North America (US), L.P.;
Notice of Meeting
Environmental staff of the Federal
Energy Regulatory Commission
(Commission) will participate in a
meeting, via telephone, with
representatives of Shell Energy North
America, the Confederated Tribes of the
Colville Reservation, and the U.S. Army
Corps of Engineers to continue the on-
VerDate Sep<11>2014
17:31 Aug 20, 2018
Jkt 244001
going discussion of potential impacts to
cultural resources from the proposed
Hydro Battery Pearl Hill Pumped
Storage Project. The meeting will be
held at the location and time listed
below:
Executive Conference Room at the
Executive Conference Center at the
Spokane International Airport, 9000 W.
Airport Drive, Spokane, Washington
99224, (located adjacent to the lower
level baggage claim and parking areas),
August 30, 2018, 9:30 a.m. to 12:00 p.m.
PST, Call-in lines will be available.
Members of the public and
intervenors in the referenced proceeding
may attend and observe this meeting, in
person or via telephone. If tribal
representatives decide to disclose
information about a specific location
which could create a risk or harm to an
archeological site or Native American
cultural resource, the public will be
excused for that portion of the meeting.
A summary of the meeting will be
entered into the Commission’s
administrative record.
If you plan to attend this meeting, in
person or via telephone, please contact
Brent Hicks of HRA Associates
(contractor for Shell Energy) at (206)
343–0226 or bhicks@hrassoc.com.
Dated: August 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–18005 Filed 8–20–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–139–000.
Applicants: Lower Mount Bethel
Energy, LLC, Martins Creek, LLC, LMBE
Project Company LLC, MC Project
Company LLC.
Description: Joint Application for
Approval under Section 203 of the
Federal Power Act, et al. of Lower
Mount Bethel Energy, LLC, et al.
Filed Date: 8/14/18.
Accession Number: 20180814–5143.
Comments Due: 5 p.m. ET 9/4/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1584–000.
Applicants: Mississippi Power
Company.
Description: Response of Mississippi
Power Company to July 13, 2018 letter
requesting additional information.
Filed Date: 8/14/18.
Accession Number: 20180814–5140.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: ER18–1731–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–08–15_Deficiency response of
MISO TOs for Cost Recovery to be
effective 8/1/2018.
Filed Date: 8/15/18.
E:\FR\FM\21AUN1.SGM
21AUN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 83, No. 162 / Tuesday, August 21, 2018 / Notices
Accession Number: 20180815–5050.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: ER18–2157–001.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Tariff Amendment: MAIT
submits an Amendment to the ECSA SA
No. 4974 to be effective 10/5/2018.
Filed Date: 8/15/18.
Accession Number: 20180815–5086.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: ER18–2217–000.
Applicants: Buckleberry Solar, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authority, Blanket Approval and
Waivers to be effective 9/19/2018.
Filed Date: 8/15/18.
Accession Number: 20180815–5000.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: ER18–2218–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3434
East Texas Electric Cooperative NITSA
and NOA to be effective 1/1/2018.
Filed Date: 8/15/18.
Accession Number: 20180815–5021.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: ER18–2219–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
4742; Queue No. AC1–045 to be
effective 10/1/2018.
Filed Date: 8/15/18.
Accession Number: 20180815–5048.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: ER18–2220–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Great River Energy.
Description: § 205(d) Rate Filing:
2018–08–15_SA 3148 NSPM–GRE T–T
(McHenry-Magic City) to be effective
8/14/2018.
Filed Date: 8/15/18.
Accession Number: 20180815–5073.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: ER18–2221–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Great River Energy.
Description: § 205(d) Rate Filing:
2018–08–15_SA 3149 NSPM–GRE T–T
(Riverview) to be effective 8/14/2018.
Filed Date: 8/15/18.
Accession Number: 20180815–5081.
Comments Due: 5 p.m. ET 9/5/18.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF17–673–002.
Applicants: Beaver Creek Wind II,
LLC.
VerDate Sep<11>2014
17:31 Aug 20, 2018
Jkt 244001
Description: Application for
Recertification of Beaver Creek Wind II,
LLC.
Filed Date: 8/14/18.
Accession Number: 20180814–5137.
Comments Due: 5 p.m. ET 9/4/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–17997 Filed 8–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–2217–000]
Buckleberry Solar, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of
Buckleberry Solar, LLC‘s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
42285
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September 4,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–17992 Filed 8–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–121–000.
Applicants: Blue Cloud Wind Energy,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status for Blue Cloud Wind
Energy, LLC.
Filed Date: 8/14/18.
Accession Number: 20180814–5039.
Comments Due: 5 p.m. ET 9/4/18.
Take notice that the Commission
received the following electric rate
filings:
E:\FR\FM\21AUN1.SGM
21AUN1
Agencies
[Federal Register Volume 83, Number 162 (Tuesday, August 21, 2018)]
[Notices]
[Pages 42284-42285]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-17997]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-139-000.
Applicants: Lower Mount Bethel Energy, LLC, Martins Creek, LLC,
LMBE Project Company LLC, MC Project Company LLC.
Description: Joint Application for Approval under Section 203 of
the Federal Power Act, et al. of Lower Mount Bethel Energy, LLC, et al.
Filed Date: 8/14/18.
Accession Number: 20180814-5143.
Comments Due: 5 p.m. ET 9/4/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-1584-000.
Applicants: Mississippi Power Company.
Description: Response of Mississippi Power Company to July 13, 2018
letter requesting additional information.
Filed Date: 8/14/18.
Accession Number: 20180814-5140.
Comments Due: 5 p.m. ET 9/4/18.
Docket Numbers: ER18-1731-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2018-08-15_Deficiency response of
MISO TOs for Cost Recovery to be effective 8/1/2018.
Filed Date: 8/15/18.
[[Page 42285]]
Accession Number: 20180815-5050.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: ER18-2157-001.
Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Tariff Amendment: MAIT submits an Amendment to the
ECSA SA No. 4974 to be effective 10/5/2018.
Filed Date: 8/15/18.
Accession Number: 20180815-5086.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: ER18-2217-000.
Applicants: Buckleberry Solar, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authority, Blanket Approval and Waivers to be effective 9/19/2018.
Filed Date: 8/15/18.
Accession Number: 20180815-5000.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: ER18-2218-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3434 East Texas Electric
Cooperative NITSA and NOA to be effective 1/1/2018.
Filed Date: 8/15/18.
Accession Number: 20180815-5021.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: ER18-2219-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of WMPA SA
No. 4742; Queue No. AC1-045 to be effective 10/1/2018.
Filed Date: 8/15/18.
Accession Number: 20180815-5048.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: ER18-2220-000.
Applicants: Midcontinent Independent System Operator, Inc., Great
River Energy.
Description: Sec. 205(d) Rate Filing: 2018-08-15_SA 3148 NSPM-GRE
T-T (McHenry-Magic City) to be effective 8/14/2018.
Filed Date: 8/15/18.
Accession Number: 20180815-5073.
Comments Due: 5 p.m. ET 9/5/18.
Docket Numbers: ER18-2221-000.
Applicants: Midcontinent Independent System Operator, Inc., Great
River Energy.
Description: Sec. 205(d) Rate Filing: 2018-08-15_SA 3149 NSPM-GRE
T-T (Riverview) to be effective 8/14/2018.
Filed Date: 8/15/18.
Accession Number: 20180815-5081.
Comments Due: 5 p.m. ET 9/5/18.
Take notice that the Commission received the following qualifying
facility filings:
Docket Numbers: QF17-673-002.
Applicants: Beaver Creek Wind II, LLC.
Description: Application for Recertification of Beaver Creek Wind
II, LLC.
Filed Date: 8/14/18.
Accession Number: 20180814-5137.
Comments Due: 5 p.m. ET 9/4/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-17997 Filed 8-20-18; 8:45 am]