Minco IV & V Interconnection, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 40505 [2018-17508]
Download as PDF
Federal Register / Vol. 83, No. 158 / Wednesday, August 15, 2018 / Notices
Description: § 205(d) Rate Filing: Pike
Road Farm LGIA Filing to be effective
7/25/2018.
Filed Date: 8/8/18.
Accession Number: 20180808–5056.
Comments Due: 5 p.m. ET 8/29/18.
Docket Numbers: ER18–2186–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original Interim ISA, SA No. 5151;
Queue No. AB2–134 to be effective 7/
23/2018.
Filed Date: 8/8/18.
Accession Number: 20180808–5083.
Comments Due: 5 p.m. ET 8/29/18.
Docket Numbers: ER18–2187–000.
Applicants: Public Service Company
of Colorado.
Description: Compliance filing:
20180808_Joint Dispatch Agreement
Notice of Succession of Black Hills COE
to be effective N/A.
Filed Date: 8/8/18.
Accession Number: 20180808–5110.
Comments Due: 5 p.m. ET 8/29/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–17505 Filed 8–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
daltland on DSKBBV9HB2PROD with NOTICES
[Docket No. ER18–2182–000]
Minco IV & V Interconnection, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
Dated: August 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
This is a supplemental notice in the
above-referenced proceeding of Minco
VerDate Sep<11>2014
18:28 Aug 14, 2018
Jkt 244001
IV & V Interconnection, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 28,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[FR Doc. 2018–17508 Filed 8–14–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
40505
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2641–010]
Erie Boulevard Hydropower, L.P.;
Notice of Application Accepted for
Filing, Soliciting Comments, Protests
and Motions To Intervene
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Extension of
License Term.
b. Project No.: P–2641–010.
c. Date Filed: March 6, 2018.
d. Licensee: Erie Boulevard
Hydropower, L.P.
e. Name and Location of Project:
Feeder Dam Transmission Line Project,
located in the Town of Moreau, Saratoga
County, New York.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
g. Licensee Contact Information: Mr.
Steven P. Murphy, Director, U.S.
Licensing, Brookfield Renewable, Erie
Boulevard Hydropower, L.P., 33 West
1st Street South, Fulton, New York
13069, (315) 598–6130, Steve.Murphy@
BrookfieldRenewable.com.
h. FERC Contact: Mr. Ashish Desai,
(202) 502–8370, Ashish.Desai@ferc.gov.
i. Deadline for filing comments,
motions to intervene and protests, is 30
days from the issuance date of this
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, and
recommendations, using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2641–010.
j. Description of Proceeding: Erie
Boulevard Hydropower, L.P., licensee
for the Feeder Dam Transmission Line
Project No. 2641, filed a request with
the Commission to extend the term of
the project license, from December 31,
2023 to August 31, 2042, which would
E:\FR\FM\15AUN1.SGM
15AUN1
Agencies
[Federal Register Volume 83, Number 158 (Wednesday, August 15, 2018)]
[Notices]
[Page 40505]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-17508]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER18-2182-000]
Minco IV & V Interconnection, LLC; Supplemental Notice That
Initial Market-Based Rate Filing Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the above-referenced proceeding of
Minco IV & V Interconnection, LLC's application for market-based rate
authority, with an accompanying rate tariff, noting that such
application includes a request for blanket authorization, under 18 CFR
part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is August 28, 2018.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[email protected]. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: August 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-17508 Filed 8-14-18; 8:45 am]
BILLING CODE 6717-01-P