Combined Notice of Filings #1, 40504-40505 [2018-17505]
Download as PDF
40504
Federal Register / Vol. 83, No. 158 / Wednesday, August 15, 2018 / Notices
immaterial modifications and
omissions. The collection of this
information is critical to ensure that the
government has sufficient information
to determine whether applicants meet
the eligibility requirements to qualify
for a DOE loan guarantee under Title
XVII or TELGP, as the case may be, and
to provide DOE with sufficient
information to evaluate an applicant’s
project using the criteria specified in 10
CFR part 609 (for Title XVII
applications) or the applicable
solicitation (for TELGP applications); (5)
Annual Estimated Number of
Respondents: 20 Applications; (6)
Annual Estimated Number of Total
Responses: It is estimated that the total
number of annual responses will not
exceed 20; (7) Annual Estimated
Number of Burden Hours: 2,650 hours,
most of which is likely to be time
committed by firms that seek debt and/
or equity financing for their projects,
regardless of their intent to apply for a
DOE loan guarantee; (8) Annual
Estimated Reporting and Recordkeeping
Cost Burden: It is estimated that the
annual estimated reporting and
recordkeeping cost burden for
applicants will not exceed $26,296 per
annum, per applicant.
Authority: Title XVII and TELGP
authorize the collection of information.
Signed in Washington, DC, on August 9,
2018.
John Sneed,
Executive Director, Department of Energy
Loan Programs Office.
[FR Doc. 2018–17553 Filed 8–14–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Proposed Agency Information
Collection Extension
U.S. Department of Energy.
Notice and Request for
Comments.
AGENCY:
ACTION:
The Department of Energy
(DOE), pursuant to the Paperwork
Reduction Act of 1995, intends to
extend for three years an information
collection request with the Office of
Management and Budget (OMB).
Comments are invited on: (a) Whether
the extended collection of information
is necessary for the proper performance
of the functions of the agency; (b) the
accuracy of the agency’s estimate of the
burden of the proposed collection of
information, including the validity of
the methodology and assumptions used;
(c) ways to enhance the quality, utility,
and clarity of the information to be
collected; and (d) ways to minimize the
daltland on DSKBBV9HB2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
18:28 Aug 14, 2018
Jkt 244001
burden of the collection of information
on respondents, including through the
use of automated collection techniques
or other forms of information
technology.
DATES: Comments regarding this
proposed information collection must
be received on or before October 15,
2018. If you anticipate difficulty in
submitting comments within that
period, contact the person listed in
ADDRESSES as soon as possible.
ADDRESSES: Written comments may be
sent to Andrea Lachenmayr, U.S.
Department of Energy, LPO–70, Room
4B–170, 1000 Independence Avenue
SW, Washington, DC 20585 or by email
to LPO.PaperworkReduction
Act.Comments@hq.doe.gov.
FOR FURTHER INFORMATION CONTACT:
Requests for additional information or
copies of the information collection
instrument and instructions should be
directed to Andrea Lachenmayr,
LPO.PaperworkReduction
Act.Comments@hq.doe.gov.
SUPPLEMENTARY INFORMATION: This
information collection request contains:
(1) OMB No.: 1910–5130; (2)
Information Collection Request Title:
Application for Loans under the
Advanced Technology Vehicles
Manufacturing Incentive Program; (3)
Type of Request: Extension; (4) Purpose:
This information collection package
covers collection of information
necessary to evaluate applications for
loans submitted under Section 136 of
the Energy Independence and Security
Act of 2007, as amended (EISA) (42
U.S.C. 17013). Applications for loans
submitted to DOE under Section 136 of
EISA must contain certain information.
This information will be used to analyze
whether a project is eligible for a loan
and to evaluate the application under
criteria specified in the interim final
regulations implementing Section 136 of
EISA, located at 10 CFR part 611. The
collection of this information is critical
to ensure that the government has
sufficient information to determine
whether applicants meet the eligibility
requirements to qualify for a DOE loan
and to provide DOE with sufficient
information to evaluate an applicant’s
project using the criteria specified in 10
CFR part 611; (5) Annual Estimated
Number of Respondents: 7 Applications;
(6) Annual Estimated Number of Total
Responses: It is estimated that the total
number of annual responses will not
exceed 7; (7) Annual Estimated Number
of Burden Hours: 910 hours, most of
which is likely to be time committed by
firms that seek debt and/or equity
financing for their projects, regardless of
their intent to apply for a DOE loan; (8)
PO 00000
Frm 00006
Fmt 4703
Sfmt 4703
Annual Estimated Reporting and
Recordkeeping Cost Burden: It is
estimated that the annual estimated
reporting and recordkeeping cost
burden for applicants will not exceed
$26,296 per annum, per applicant.
Authority: Section 136 of the EISA
authorizes the collection of information.
Signed in Washington, DC on August 9,
2018.
John Sneed,
Executive Director, Department of Energy
Loan Programs Office.
[FR Doc. 2018–17552 Filed 8–14–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2977–007.
Applicants: Mesquite Power, LLC.
Description: Notice of Non-Material
Change in Status of Mesquite Power,
LLC.
Filed Date: 8/7/18.
Accession Number: 20180807–5151.
Comments Due: 5 p.m. ET 8/28/18.
Docket Numbers: ER18–2182–000.
Applicants: Minco IV & V
Interconnection, LLC.
Description: Baseline eTariff Filing:
Minco IV & V Interconnection, LLC
Application for Market-Based Rates to
be effective 10/6/2018.
Filed Date: 8/7/18.
Accession Number: 20180807–5141.
Comments Due: 5 p.m. ET 8/28/18.
Docket Numbers: ER18–2183–000.
Applicants: Tucson Electric Power
Company.
Description: § 205(d) Rate Filing:
Amendment to Gila River Ownership
Agreement to be effective 5/31/2018.
Filed Date: 8/8/18.
Accession Number: 20180808–5002.
Comments Due: 5 p.m. ET 8/29/18.
Docket Numbers: ER18–2184–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
MAIT submits three ECSAs, Service
Agreement Nos. 5011, 5029 and 5117 to
be effective 10/8/2018.
Filed Date: 8/8/18.
Accession Number: 20180808–5023.
Comments Due: 5 p.m. ET 8/29/18.
Docket Numbers: ER18–2185–000.
Applicants: Alabama Power
Company.
E:\FR\FM\15AUN1.SGM
15AUN1
Federal Register / Vol. 83, No. 158 / Wednesday, August 15, 2018 / Notices
Description: § 205(d) Rate Filing: Pike
Road Farm LGIA Filing to be effective
7/25/2018.
Filed Date: 8/8/18.
Accession Number: 20180808–5056.
Comments Due: 5 p.m. ET 8/29/18.
Docket Numbers: ER18–2186–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original Interim ISA, SA No. 5151;
Queue No. AB2–134 to be effective 7/
23/2018.
Filed Date: 8/8/18.
Accession Number: 20180808–5083.
Comments Due: 5 p.m. ET 8/29/18.
Docket Numbers: ER18–2187–000.
Applicants: Public Service Company
of Colorado.
Description: Compliance filing:
20180808_Joint Dispatch Agreement
Notice of Succession of Black Hills COE
to be effective N/A.
Filed Date: 8/8/18.
Accession Number: 20180808–5110.
Comments Due: 5 p.m. ET 8/29/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–17505 Filed 8–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
daltland on DSKBBV9HB2PROD with NOTICES
[Docket No. ER18–2182–000]
Minco IV & V Interconnection, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
Dated: August 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
This is a supplemental notice in the
above-referenced proceeding of Minco
VerDate Sep<11>2014
18:28 Aug 14, 2018
Jkt 244001
IV & V Interconnection, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 28,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[FR Doc. 2018–17508 Filed 8–14–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
40505
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2641–010]
Erie Boulevard Hydropower, L.P.;
Notice of Application Accepted for
Filing, Soliciting Comments, Protests
and Motions To Intervene
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Extension of
License Term.
b. Project No.: P–2641–010.
c. Date Filed: March 6, 2018.
d. Licensee: Erie Boulevard
Hydropower, L.P.
e. Name and Location of Project:
Feeder Dam Transmission Line Project,
located in the Town of Moreau, Saratoga
County, New York.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
g. Licensee Contact Information: Mr.
Steven P. Murphy, Director, U.S.
Licensing, Brookfield Renewable, Erie
Boulevard Hydropower, L.P., 33 West
1st Street South, Fulton, New York
13069, (315) 598–6130, Steve.Murphy@
BrookfieldRenewable.com.
h. FERC Contact: Mr. Ashish Desai,
(202) 502–8370, Ashish.Desai@ferc.gov.
i. Deadline for filing comments,
motions to intervene and protests, is 30
days from the issuance date of this
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, and
recommendations, using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2641–010.
j. Description of Proceeding: Erie
Boulevard Hydropower, L.P., licensee
for the Feeder Dam Transmission Line
Project No. 2641, filed a request with
the Commission to extend the term of
the project license, from December 31,
2023 to August 31, 2042, which would
E:\FR\FM\15AUN1.SGM
15AUN1
Agencies
[Federal Register Volume 83, Number 158 (Wednesday, August 15, 2018)]
[Notices]
[Pages 40504-40505]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-17505]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2977-007.
Applicants: Mesquite Power, LLC.
Description: Notice of Non-Material Change in Status of Mesquite
Power, LLC.
Filed Date: 8/7/18.
Accession Number: 20180807-5151.
Comments Due: 5 p.m. ET 8/28/18.
Docket Numbers: ER18-2182-000.
Applicants: Minco IV & V Interconnection, LLC.
Description: Baseline eTariff Filing: Minco IV & V Interconnection,
LLC Application for Market-Based Rates to be effective 10/6/2018.
Filed Date: 8/7/18.
Accession Number: 20180807-5141.
Comments Due: 5 p.m. ET 8/28/18.
Docket Numbers: ER18-2183-000.
Applicants: Tucson Electric Power Company.
Description: Sec. 205(d) Rate Filing: Amendment to Gila River
Ownership Agreement to be effective 5/31/2018.
Filed Date: 8/8/18.
Accession Number: 20180808-5002.
Comments Due: 5 p.m. ET 8/29/18.
Docket Numbers: ER18-2184-000.
Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: MAIT submits three ECSAs,
Service Agreement Nos. 5011, 5029 and 5117 to be effective 10/8/2018.
Filed Date: 8/8/18.
Accession Number: 20180808-5023.
Comments Due: 5 p.m. ET 8/29/18.
Docket Numbers: ER18-2185-000.
Applicants: Alabama Power Company.
[[Page 40505]]
Description: Sec. 205(d) Rate Filing: Pike Road Farm LGIA Filing
to be effective 7/25/2018.
Filed Date: 8/8/18.
Accession Number: 20180808-5056.
Comments Due: 5 p.m. ET 8/29/18.
Docket Numbers: ER18-2186-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original Interim ISA, SA No.
5151; Queue No. AB2-134 to be effective 7/23/2018.
Filed Date: 8/8/18.
Accession Number: 20180808-5083.
Comments Due: 5 p.m. ET 8/29/18.
Docket Numbers: ER18-2187-000.
Applicants: Public Service Company of Colorado.
Description: Compliance filing: 20180808_Joint Dispatch Agreement
Notice of Succession of Black Hills COE to be effective N/A.
Filed Date: 8/8/18.
Accession Number: 20180808-5110.
Comments Due: 5 p.m. ET 8/29/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-17505 Filed 8-14-18; 8:45 am]
BILLING CODE 6717-01-P