Boyce Hydro Power, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 40034-40035 [2018-17293]
Download as PDF
40034
Federal Register / Vol. 83, No. 156 / Monday, August 13, 2018 / Notices
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 7, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–17350 Filed 8–10–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
written, or regarded topics that were not
relevant to the Guidelines.
All of the information related to the
Guidelines and submitted comments
can be found on the FERC website
(www.ferc.gov) using the eLibrary link.
Click on the eLibrary link, click on
‘‘Docket Search’’ and in the Docket
Number field enter the docket number
‘‘AD18–13,’’ excluding the last three
digits. For assistance, please contact
FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to formal documents
issued by the Commission, such as
orders, notices, and rulemakings.
Dated: August 7, 2018.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2018–17288 Filed 8–10–18; 8:45 am]
[Docket No. AD18–13–000]
BILLING CODE 6717–01–P
sradovich on DSK3GMQ082PROD with NOTICES
Notice of Availability of the Final
Engineering Guidelines for the
Evaluation of Hydropower Projects:
Chapter 12—Water Conveyance
DEPARTMENT OF ENERGY
The staff of the Federal Energy
Regulatory Commission’s (FERC or
Commission) Office of Energy Projects
has finalized its new Engineering
Guidelines for the Evaluation of
Hydropower Projects: Chapter 12—
Water Conveyance (Guidelines), which
was issued in draft form on May 17,
2018, for comment. The Guidelines
revision reflects the most current
thinking and practices of the Division of
Dam Safety and Inspections.
The Guidelines can be found in
Docket Number AD18–13–000. The full
text of the Guidelines can be viewed on
the Commission’s website at https://
www.ferc.gov/industries/hydropower/
safety/guidelines/eng-guide/chap12.pdf.
The Guidelines are intended to
provide guidance to the industry. This
document does not substitute for,
amend, or supersede the Commission’s
regulations under the 18 CFR part 12—
Safety of Water Power Projects and
Project Works. imposes no new legal
obligations and grants no additional
rights.
In response to the draft Guidelines,
Commission staff received comments
from federal and state agencies,
licensees whose portfolio includes arch
dams, independent consultants and
inspectors, and other interested parties.
Staff reviewed and considered each
comment and modified several portions
of the document in response. Staff
declined to modify the document where
comments either were already
adequately/accurately addressed as
VerDate Sep<11>2014
20:42 Aug 10, 2018
Jkt 244001
Federal Energy Regulatory
Commission
[Project Nos. 10809–044, 10810–050, 10808–
061, 2785–095]
Boyce Hydro Power, LLC; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Temporary
Variance Application.
b. Project Nos: 10809–044, 10810–
050, 10808–061, 2785–095.
c. Date Filed: July 26, 2018, as
clarified on August 7, 2018.
d. Applicant: Boyce Hydro Power,
LLC.
e. Name of Project: Secord,
Smallwood, Edenville, and Sanford
Hydroelectric Projects.
f. Location: These projects are located
on the Tittabawassee and Tobacco
Rivers in Gladwin and Midland
counties, Michigan.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Lee
Mueller, Boyce Hydro Power, LLC,
10120 W. Flamingo Road, Suite 4192,
Las Vegas, NV 89147, (702) 367–7302.
i. FERC Contact: Dr. Jennifer Ambler,
(202) 502–8586, jennifer.ambler@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 6, 2018.
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket numbers P–10809–044,
P–10810–050, P–10808–061, and/or P–
2785–095.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee requests a temporary variance
of lake level requirements contained in
articles 403, 403, 404, and 411 of its
licenses for the Secord, Smallwood,
Edenville, and Sanford Projects,
respectively. To facilitate focused
spillway assessments and gate
inspections, the licensee proposes to
lower each reservoir about 4 feet to the
following elevations: 746.8 ft for Secord,
700.4 ft for Smallwood, 671.8 ft for
Edenville, and 626.8 ft for Sanford (all
reservoir elevations are at National
Geodetic Vertical Datum) beginning
September 20, 2018. The licensee would
draw down the reservoirs at a rate of 8
inches per day for the inspections to
occur on/about October 1, 2018.
Potentially beginning on October 2,
2018, the licensee would begin refilling
the reservoirs at a rate not to exceed 9
inches per day to return the reservoirs
to their normal water surface elevations
of 750.8 ft for Secord, 704.8 ft for
Smallwood, 675.8 ft for Edenville, and
630.8 ft for Sanford.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
E:\FR\FM\13AUN1.SGM
13AUN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 83, No. 156 / Monday, August 13, 2018 / Notices
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: August 7, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–17293 Filed 8–10–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
20:42 Aug 10, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC98–2–001; ER18–
2162–000.
Applicants: Louisville Gas and
Electric Company, Kentucky Utilities
Company.
Description: Joint Application under
FPA Section 203 and Section 205 of
Louisville Gas and Electric Company, et
al.
Filed Date: 8/3/18.
Accession Number: 20180803–5189.
Comments Due: 5 p.m. ET 8/24/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–119–000.
Applicants: Stillwater Wind, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Stillwater Wind,
LLC.
Filed Date: 8/7/18.
Accession Number: 20180807–5034.
Comments Due: 5 p.m. ET 8/28/18.
Docket Numbers: EG18–120–000.
Applicants: Crazy Mountain Wind
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Crazy Mountain
Wind LLC.
Filed Date: 8/7/18.
Accession Number: 20180807–5037.
Comments Due: 5 p.m. ET 8/28/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1575–001.
Applicants: NorthWestern
Corporation.
Description: Compliance filing:
Erratum to Order No. 842 Compliance
Filing (South Dakota OATT) to be
effective 5/15/2018.
Filed Date: 8/7/18.
Accession Number: 20180807–5058.
Comments Due: 5 p.m. ET 8/28/18.
Docket Numbers: ER18–1791–001.
Applicants: Duke Energy Florida,
LLC.
Description: Tariff Amendment:
DEF—Notice of Termination (US
EcoGen Polk, LLC SA–180) Deficiency
Response to be effective 8/15/2018.
Filed Date: 8/6/18.
Accession Number: 20180806–5116.
Comments Due: 5 p.m. ET 8/27/18.
Docket Numbers: ER18–1823–001.
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
40035
Applicants: Walleye Power, LLC.
Description: Compliance filing: Notice
of Reactive Tariff Effective Date—
Succession Filing to be effective 7/31/
2018.
Filed Date: 8/7/18.
Accession Number: 20180807–5054.
Comments Due: 5 p.m. ET 8/28/18.
Docket Numbers: ER18–2174–000.
Applicants: New England Power
Company.
Description: § 205(d) Rate Filing:
Filing of G–33 Circuit Support
Agreement with Green Mountain Power
Corp. to be effective 8/1/2018.
Filed Date: 8/6/18.
Accession Number: 20180806–5112.
Comments Due: 5 p.m. ET 8/27/18.
Docket Numbers: ER18–2175–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, West Penn Power
Company, The Potomac Edison
Company, Monongahela Power
Company, Trans-Allegheny Interstate
Line Company, American Transmission
Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
MAIT et al. submit Interconnection
Agreements, SA Nos. 2149, 3743 and
5110 to be effective 10/5/2018.
Filed Date: 8/6/18.
Accession Number: 20180806–5115.
Comments Due: 5 p.m. ET 8/27/18.
Docket Numbers: ER18–2176–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–08–07_SA 2484 Meadowlark
Wind I–GRE 1st Rev GIA (G830) to be
effective 7/24/2018.
Filed Date: 8/7/18.
Accession Number: 20180807–5007.
Comments Due: 5 p.m. ET 8/28/18.
Docket Numbers: ER18–2178–000.
Applicants: Holloman Lessee, LLC.
Description: Baseline eTariff Filing:
Initial Market-Based Rate Tariff of
Holloman Lessee LLC to be effective 10/
7/2018.
Filed Date: 8/7/18.
Accession Number: 20180807–5092.
Comments Due: 5 p.m. ET 8/28/18.
Docket Numbers: ER18–2179–000.
Applicants: Black Hills Colorado
Electric, Inc.
Description: § 205(d) Rate Filing:
Notice of Succession (OATT) to be
effective 7/10/2018.
Filed Date: 8/7/18.
Accession Number: 20180807–5098.
Comments Due: 5 p.m. ET 8/28/18.
Docket Numbers: ER18–2180–000.
Applicants: Black Hills Colorado
Electric, Inc.
Description: § 205(d) Rate Filing:
Notice of Succession (WestConnect
Point-to-Point) to be effective 7/10/2018.
E:\FR\FM\13AUN1.SGM
13AUN1
Agencies
[Federal Register Volume 83, Number 156 (Monday, August 13, 2018)]
[Notices]
[Pages 40034-40035]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-17293]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 10809-044, 10810-050, 10808-061, 2785-095]
Boyce Hydro Power, LLC; Notice of Application Accepted for Filing
and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Temporary Variance Application.
b. Project Nos: 10809-044, 10810-050, 10808-061, 2785-095.
c. Date Filed: July 26, 2018, as clarified on August 7, 2018.
d. Applicant: Boyce Hydro Power, LLC.
e. Name of Project: Secord, Smallwood, Edenville, and Sanford
Hydroelectric Projects.
f. Location: These projects are located on the Tittabawassee and
Tobacco Rivers in Gladwin and Midland counties, Michigan.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Lee Mueller, Boyce Hydro Power, LLC,
10120 W. Flamingo Road, Suite 4192, Las Vegas, NV 89147, (702) 367-
7302.
i. FERC Contact: Dr. Jennifer Ambler, (202) 502-8586,
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests: September 6, 2018.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should include docket numbers P-10809-044, P-10810-050, P-10808-061,
and/or P-2785-095.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The licensee requests a temporary
variance of lake level requirements contained in articles 403, 403,
404, and 411 of its licenses for the Secord, Smallwood, Edenville, and
Sanford Projects, respectively. To facilitate focused spillway
assessments and gate inspections, the licensee proposes to lower each
reservoir about 4 feet to the following elevations: 746.8 ft for
Secord, 700.4 ft for Smallwood, 671.8 ft for Edenville, and 626.8 ft
for Sanford (all reservoir elevations are at National Geodetic Vertical
Datum) beginning September 20, 2018. The licensee would draw down the
reservoirs at a rate of 8 inches per day for the inspections to occur
on/about October 1, 2018. Potentially beginning on October 2, 2018, the
licensee would begin refilling the reservoirs at a rate not to exceed 9
inches per day to return the reservoirs to their normal water surface
elevations of 750.8 ft for Secord, 704.8 ft for Smallwood, 675.8 ft for
Edenville, and 630.8 ft for Sanford.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE, Room 2A,
[[Page 40035]]
Washington, DC 20426, or by calling (202) 502-8371. This filing may
also be viewed on the Commission's website at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above. Agencies may obtain copies of the application directly from
the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: August 7, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-17293 Filed 8-10-18; 8:45 am]