Notice of Intent To Prepare an Environmental Assessment for the Proposed Columbia Gas Transmission, LLC Line Ka1 North Launcher/Receiver Project and Request for Comments on Environmental Issues, 39435-39436 [2018-17029]
Download as PDF
Federal Register / Vol. 83, No. 154 / Thursday, August 9, 2018 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–508–000]
sradovich on DSK3GMQ082PROD with NOTICES
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Columbia Gas Transmission,
LLC Line Ka1 North Launcher/Receiver
Project and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the proposed Line KA1 North Launcher/
Receiver Project involving construction
and operation of facilities by Columbia
Gas Transmission, LLC (Columbia) in
Fayette and Madison Counties,
Kentucky. The Commission will use this
EA in its decision-making process to
determine whether the project is in the
public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity.
NEPA also requires the Commission to
discover concerns the public may have
about proposals. This process is referred
to as scoping. The main goal of the
scoping process is to focus the analysis
in the EA on the important
environmental issues. By this notice, the
Commission requests public comments
on the scope of the issues to address in
the EA. To ensure that your comments
are timely and properly recorded, please
submit your comments so that the
Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on September 4, 2018.
You can make a difference by
submitting your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
will consider and address all filed
comments during the preparation of the
EA.
If you sent comments on this project
to the Commission before the opening of
this docket on June 20, 2018, you will
VerDate Sep<11>2014
18:11 Aug 08, 2018
Jkt 244001
need to file those comments in Docket
No. CP18–508–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, that approval conveys with
it the right of eminent domain.
Therefore, if you and the company do
not reach an easement agreement, the
pipeline company could initiate
condemnation proceedings in court. In
such instances, compensation would be
determined by a judge in accordance
with state law.
Columbia provided landowners with
a fact sheet prepared by the FERC
entitled An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know? This fact sheet addresses a
number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC
website (www.ferc.gov).
Public Participation
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. Using eComment is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
39435
first create an account by clicking on
eRegister. You will be asked to select the
type of filing you are making; a
comment on a particular project is
considered a Comment on a Filing; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (CP18–508–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Summary of the Proposed Project
The Line KA1 North Launcher/
Receiver Project involves the
installation of two 16-inch × 12-inch bidirectional pig 1 launcher/receivers on
Columbia’s existing Line KA1 North
pipeline and other modifications at
seven discrete points along the pipeline
within Fayette and Madison Counties,
Kentucky. According to Columbia, these
modifications are necessary to enable
the use of smart pigs and cleaning pigs
within the Line KA1 North pipeline,
which would protect the pipeline from
corrosion and provide advanced
monitoring capabilities to maintain the
pipeline’s integrity between Columbia’s
existing Bybee and Muth Measurement
and Regulation Stations.
The general location of the project
facilities is shown in appendix 1.2
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 8.75 acres of land.
Following construction, Columbia
would maintain about 3.28 acres for
permanent operation of the project’s
facilities. Approximately 0.02 acre of
temporary access road, 3.42 acres of
staging area, and 2.03 acres of temporary
workspace would be allowed to revert to
preconstruction conditions.
The EA Process
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• land use;
• water resources, fisheries, and
wetlands;
1 A pig is a tool that the pipeline company inserts
into and pushes through the pipeline for cleaning
the pipeline, conducting internal inspections, or
other purposes.
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called eLibrary or from the
Commission’s Public Reference Room, 888 First
Street NE, Washington, DC 20426, or call (202) 502–
8371. For instructions on connecting to eLibrary,
refer to the last page of this notice.
E:\FR\FM\09AUN1.SGM
09AUN1
39436
Federal Register / Vol. 83, No. 154 / Thursday, August 9, 2018 / Notices
sradovich on DSK3GMQ082PROD with NOTICES
• cultural resources;
• vegetation and wildlife;
• air quality and noise;
• endangered and threatened species;
• public safety; and
• cumulative impacts.
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project, and
make recommendations on how to
lessen or avoid impacts on the various
resource areas.
The EA will present Commission
staff’s independent analysis of the
issues. The EA will be available in the
public record through eLibrary.3
Depending on the comments received
during the scoping process, the
Commission may also publish and
distribute the EA to the public for an
allotted comment period. Commission
staff will consider and address all
comments on the EA before making
recommendations to the Commission.
To ensure Commission staff has the
opportunity to address your comments,
please carefully follow the instructions
in the Public Participation section,
beginning on page 2.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the EA.4 Agencies that would like to
request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. Commission
staff will update the environmental
mailing list as the analysis proceeds to
ensure that information related to this
environmental review is sent to all
individuals, organizations, and
government entities interested in and/or
3 For instructions on connecting to eLibrary, refer
to the last page of this notice.
4 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
VerDate Sep<11>2014
18:11 Aug 08, 2018
Jkt 244001
potentially affected by the proposed
project.
If the Commission publishes and
distributes the EA, copies of the EA will
be sent to the environmental mailing list
for public review and comment. If you
would prefer to receive a paper copy of
the document instead of a CD version or
would like to remove your name from
the mailing list, please return the
attached ‘‘Mailing List Update Form’’
(appendix 2).
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on General Search and enter the
docket number in the Docket Number
field, excluding the last three digits (i.e.,
CP18–508). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public sessions or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: August 3, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–17029 Filed 8–8–18; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2017–0751; FRL–9981–15]
Interim Registration Review Decisions
for Several Pesticides; Notice of
Availability
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
This notice announces the
availability of EPA’s interim registration
review decisions for the chemicals
listed in the Table in Unit IV of this
Notice.
SUPPLEMENTARY INFORMATION:
SUMMARY:
I. General Information
A. Does this action apply to me?
This action is directed to the public
in general, and may be of interest to a
wide range of stakeholders including
environmental, human health, farm
worker, and agricultural advocates; the
chemical industry; pesticide users; and
members of the public interested in the
sale, distribution, or use of pesticides.
Since others also may be interested, the
Agency has not attempted to describe all
the specific entities that may be affected
by this action. If you have any questions
regarding the applicability of this action
to a particular entity, consult the
pesticide specific contact person listed
under FOR FURTHER INFORMATION
CONTACT: For pesticide specific
information, contact: The Chemical
Review Manager for the pesticide of
interest identified in the Table in Unit
IV.
For general information on the
registration review program, contact:
Dana Friedman, Pesticide Re-Evaluation
Division (7508P), Office of Pesticide
Programs, Environmental Protection
Agency, 1200 Pennsylvania Ave. NW,
Washington, DC 20460–0001; telephone
number: (703) 347–8827; email address:
friedman.dana@epa.gov.
II. Background
Registration review is EPA’s periodic
review of pesticide registrations to
ensure that each pesticide continues to
satisfy the statutory standard for
registration, that is, the pesticide can
perform its intended function without
unreasonable adverse effects on human
health or the environment. As part of
the registration review process, the
Agency has completed interim decisions
for all pesticides listed in the Table in
Unit IV. Through this program, EPA is
ensuring that each pesticide’s
registration is based on current
scientific and other knowledge,
including its effects on human health
and the environment.
III. Authority
EPA is conducting its registration
review of the chemicals listed in the
Table in Unit IV pursuant to section 3(g)
of the Federal Insecticide, Fungicide,
and Rodenticide Act (FIFRA) and the
Procedural Regulations for Registration
Review at 40 CFR part 155, subpart C.
Section 3(g) of FIFRA provides, among
E:\FR\FM\09AUN1.SGM
09AUN1
Agencies
[Federal Register Volume 83, Number 154 (Thursday, August 9, 2018)]
[Notices]
[Pages 39435-39436]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-17029]
[[Page 39435]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-508-000]
Notice of Intent To Prepare an Environmental Assessment for the
Proposed Columbia Gas Transmission, LLC Line Ka1 North Launcher/
Receiver Project and Request for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the proposed Line KA1 North
Launcher/Receiver Project involving construction and operation of
facilities by Columbia Gas Transmission, LLC (Columbia) in Fayette and
Madison Counties, Kentucky. The Commission will use this EA in its
decision-making process to determine whether the project is in the
public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies about issues regarding the project. The National Environmental
Policy Act (NEPA) requires the Commission to take into account the
environmental impacts that could result from its action whenever it
considers the issuance of a Certificate of Public Convenience and
Necessity. NEPA also requires the Commission to discover concerns the
public may have about proposals. This process is referred to as
scoping. The main goal of the scoping process is to focus the analysis
in the EA on the important environmental issues. By this notice, the
Commission requests public comments on the scope of the issues to
address in the EA. To ensure that your comments are timely and properly
recorded, please submit your comments so that the Commission receives
them in Washington, DC on or before 5:00 p.m. Eastern Time on September
4, 2018.
You can make a difference by submitting your specific comments or
concerns about the project. Your comments should focus on the potential
environmental effects, reasonable alternatives, and measures to avoid
or lessen environmental impacts. Your input will help the Commission
staff determine what issues they need to evaluate in the EA. Commission
staff will consider and address all filed comments during the
preparation of the EA.
If you sent comments on this project to the Commission before the
opening of this docket on June 20, 2018, you will need to file those
comments in Docket No. CP18-508-000 to ensure they are considered as
part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable easement agreement. You
are not required to enter into an agreement. However, if the Commission
approves the project, that approval conveys with it the right of
eminent domain. Therefore, if you and the company do not reach an
easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law.
Columbia provided landowners with a fact sheet prepared by the FERC
entitled An Interstate Natural Gas Facility On My Land? What Do I Need
To Know? This fact sheet addresses a number of typically asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC website (www.ferc.gov).
Public Participation
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. Using eComment is an easy
method for submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on eRegister. You will be asked to select the type of filing you are
making; a comment on a particular project is considered a Comment on a
Filing; or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket number
(CP18-508-000) with your submission: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426.
Summary of the Proposed Project
The Line KA1 North Launcher/Receiver Project involves the
installation of two 16-inch x 12-inch bi-directional pig \1\ launcher/
receivers on Columbia's existing Line KA1 North pipeline and other
modifications at seven discrete points along the pipeline within
Fayette and Madison Counties, Kentucky. According to Columbia, these
modifications are necessary to enable the use of smart pigs and
cleaning pigs within the Line KA1 North pipeline, which would protect
the pipeline from corrosion and provide advanced monitoring
capabilities to maintain the pipeline's integrity between Columbia's
existing Bybee and Muth Measurement and Regulation Stations.
---------------------------------------------------------------------------
\1\ A pig is a tool that the pipeline company inserts into and
pushes through the pipeline for cleaning the pipeline, conducting
internal inspections, or other purposes.
---------------------------------------------------------------------------
The general location of the project facilities is shown in appendix
1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called eLibrary or from the Commission's Public
Reference Room, 888 First Street NE, Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 8.75
acres of land. Following construction, Columbia would maintain about
3.28 acres for permanent operation of the project's facilities.
Approximately 0.02 acre of temporary access road, 3.42 acres of staging
area, and 2.03 acres of temporary workspace would be allowed to revert
to preconstruction conditions.
The EA Process
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils;
land use;
water resources, fisheries, and wetlands;
[[Page 39436]]
cultural resources;
vegetation and wildlife;
air quality and noise;
endangered and threatened species;
public safety; and
cumulative impacts.
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project, and make recommendations
on how to lessen or avoid impacts on the various resource areas.
The EA will present Commission staff's independent analysis of the
issues. The EA will be available in the public record through
eLibrary.\3\ Depending on the comments received during the scoping
process, the Commission may also publish and distribute the EA to the
public for an allotted comment period. Commission staff will consider
and address all comments on the EA before making recommendations to the
Commission. To ensure Commission staff has the opportunity to address
your comments, please carefully follow the instructions in the Public
Participation section, beginning on page 2.
---------------------------------------------------------------------------
\3\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the EA.\4\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\4\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. Commission staff will update the environmental
mailing list as the analysis proceeds to ensure that information
related to this environmental review is sent to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project.
If the Commission publishes and distributes the EA, copies of the
EA will be sent to the environmental mailing list for public review and
comment. If you would prefer to receive a paper copy of the document
instead of a CD version or would like to remove your name from the
mailing list, please return the attached ``Mailing List Update Form''
(appendix 2).
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on General Search and enter the docket number in
the Docket Number field, excluding the last three digits (i.e., CP18-
508). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or (866) 208-3676, or for TTY, contact (202)
502-8659. The eLibrary link also provides access to the texts of all
formal documents issued by the Commission, such as orders, notices, and
rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Finally, public sessions or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: August 3, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-17029 Filed 8-8-18; 8:45 am]
BILLING CODE 6717-01-P