Federal Register / Vol. 83, No. 154 / Thursday, August 9, 2018 / Rules and Regulations
navigation span. Due to the cancellation
of the work, this platform will not be
installed and the bridge will operate
under its regular operating schedule in
33 CFR 117.716. In accordance with 33
CFR 117.35(e), the drawbridge must
return to its regular operating schedule
immediately at the end of the
cancellation date of the deviation.
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0228]
Drawbridge Operation Regulation;
Delaware River, Burlington, NJ and
Bristol, PA
Dated: August 2, 2018.
Hal R. Pitts,
Bridge Program Manager, Fifth Coast Guard
District.
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation; cancellation.
AGENCY:
ACTION:
[FR Doc. 2018–16845 Filed 8–8–18; 8:45 am]
BILLING CODE 9110–04–P
The Coast Guard is canceling
the temporary deviation from the
operating schedule that governs the SR
413/Burlington-Bristol bridge, which
carries SR 413 across the Delaware
River, mile 117.8, between Burlington,
NJ and Bristol, PA. The cancellation of
the deviation is necessary to remove
operational restrictions placed on the
bridge not utilized to facilitate bridge
maintenance.
DATES: The temporary deviation
published on April 26, 2018, 83 FR
18226 is cancelled as of August 9, 2018.
ADDRESSES: The docket for this
deviation, USCG–2018–0228 is available
at https://www.regulations.gov. Type the
docket number in the ‘‘SEARCH’’ box
and click ‘‘SEARCH’’. Click on Open
Docket Folder on the line associated
with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Michael
Thorogood, Bridge Administration
Branch Fifth District, Coast Guard,
telephone 757–398–6557, email
Michael.R.Thorogood@uscg.mil.
SUPPLEMENTARY INFORMATION: On April
26, 2018, we published a temporary
deviation entitled ‘‘Drawbridge
Operation Regulation; Delaware River,
Burlington, NJ and Bristol, PA’’ in the
Federal Register (83 FR 18226). This
temporary deviation was to facilitate
bridge maintenance and painting of the
vertical lift span of the drawbridge from
May 1, 2018, through September 30,
2018. During the planned maintenance
period, a work platform would have
reduced one half of the bridge span
vertical clearance to approximately 58
feet above mean high water in the
closed position and approximately 132
feet above mean high water in the open
position.
The temporary deviation is being
cancelled due to delays in performing
bridge maintenance outside the
navigation span, thereby eliminating the
need for a temporary deviation to
facilitate bridge maintenance in the
sradovich on DSK3GMQ082PROD with RULES
SUMMARY:
VerDate Sep<11>2014
15:49 Aug 08, 2018
Jkt 244001
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG–2018–0693]
Safety Zones; Annual Events
Requiring Safety Zones in the Captain
of the Port Lake Michigan Zone—
Milwaukee Open Water Swim
Coast Guard, DHS.
Notice of enforcement of
regulation.
AGENCY:
ACTION:
The Coast Guard will enforce
the safety zone on the Milwaukee River,
between the I–794 overpass to where the
Milwaukee River and Kinnickinnic
River meet in Milwaukee, WI for the
Milwaukee Open Water Swim on
August 11, 2018 to provide for the safety
of life on navigable waterways during
the event. During the enforcement
periods, the operator of any vessel in the
regulated area must comply with
directions from the Patrol Commander
or any Official Patrol displaying a Coast
Guard ensign. During the enforcement
period, vessels and persons are
prohibited from transiting through,
mooring, or anchoring within this safety
zone without approval from the Captain
of the Port Lake Michigan or his or her
designated representative.
DATES: The regulations in 33 CFR
165.929(f)(18) will be enforced from 6
a.m. through 10 a.m. on August 11,
2018.
FOR FURTHER INFORMATION CONTACT: If
you have questions about this notice of
enforcement, call or email marine event
coordinator MSTC Kaleena Carpino,
Prevention Department, Coast Guard
Sector Lake Michigan, Milwaukee, WI;
telephone (414) 747–7148, email D09SMB-SECLakeMichgan-WWM@uscg.mil.
SUPPLEMENTARY INFORMATION: The Coast
Guard will enforce the Safety Zone;
SUMMARY:
PO 00000
Frm 00039
Fmt 4700
Sfmt 4700
39361
Milwaukee Open Water Swim listed as
(f)(18) in Table 165.929 of 33 CFR
165.929 on August 11, 2018 from 6 a.m.
through 10 a.m. This action is being
taken to provide for the safety of life on
navigable waterways of the Milwaukee
River in Milwaukee, WI. This safety
zone will encompass all waters of the
Milwaukee River from the I–794
overpass to where the Milwaukee River
and Kinnickinnic River meet (NAD 83).
Pursuant to 33 CFR 165.929, entry
into, transiting, or anchoring within the
safety zone during an enforcement
period is prohibited unless authorized
by the Captain of the Port Lake
Michigan, or his or her designated onscene representative. Those seeking
permission to enter the safety zone may
request permission from the Captain of
Port Lake Michigan via Channel 16,
VHF–FM. Vessels and persons granted
permission to enter the safety zone shall
obey the directions of the Captain of the
Port Lake Michigan or his or her
designated representative. While within
a safety zone, all vessels shall operate at
the minimum speed necessary to
maintain a safe course.
This notice of enforcement is issued
under authority of 33 CFR 165.929,
Safety Zones; Annual events requiring
safety zones in the Captain of the Port
Lake Michigan zone, and 5 U.S.C.
552(a). In addition to this notice in the
Federal Register, the Coast Guard will
provide the maritime community with
advance notification of this enforcement
period via Broadcast Notice to Mariners
and Local Notice to Mariners. The
Captain of the Port Lake Michigan or his
or her designated on-scene
representative may be contacted via
VHF Channel 16 or at (414) 747–7182.
Dated: July 24, 2018.
Thomas J. Stuhlreyer,
Captain, U.S. Coast Guard, Captain of the
Port Lake Michigan.
[FR Doc. 2018–17075 Filed 8–8–18; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket Number USCG–2018–0659]
RIN 1625–AA00
Safety Zone; Lake Michigan, Whiting,
Indiana
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
E:\FR\FM\09AUR1.SGM
09AUR1
Agencies
[Federal Register Volume 83, Number 154 (Thursday, August 9, 2018)]
[Rules and Regulations]
[Page 39361]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-16845]
[[Page 39361]]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2018-0228]
Drawbridge Operation Regulation; Delaware River, Burlington, NJ
and Bristol, PA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation; cancellation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard is canceling the temporary deviation from the
operating schedule that governs the SR 413/Burlington-Bristol bridge,
which carries SR 413 across the Delaware River, mile 117.8, between
Burlington, NJ and Bristol, PA. The cancellation of the deviation is
necessary to remove operational restrictions placed on the bridge not
utilized to facilitate bridge maintenance.
DATES: The temporary deviation published on April 26, 2018, 83 FR 18226
is cancelled as of August 9, 2018.
ADDRESSES: The docket for this deviation, USCG-2018-0228 is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Michael Thorogood, Bridge
Administration Branch Fifth District, Coast Guard, telephone 757-398-
6557, email [email protected].
SUPPLEMENTARY INFORMATION: On April 26, 2018, we published a temporary
deviation entitled ``Drawbridge Operation Regulation; Delaware River,
Burlington, NJ and Bristol, PA'' in the Federal Register (83 FR 18226).
This temporary deviation was to facilitate bridge maintenance and
painting of the vertical lift span of the drawbridge from May 1, 2018,
through September 30, 2018. During the planned maintenance period, a
work platform would have reduced one half of the bridge span vertical
clearance to approximately 58 feet above mean high water in the closed
position and approximately 132 feet above mean high water in the open
position.
The temporary deviation is being cancelled due to delays in
performing bridge maintenance outside the navigation span, thereby
eliminating the need for a temporary deviation to facilitate bridge
maintenance in the navigation span. Due to the cancellation of the
work, this platform will not be installed and the bridge will operate
under its regular operating schedule in 33 CFR 117.716. In accordance
with 33 CFR 117.35(e), the drawbridge must return to its regular
operating schedule immediately at the end of the cancellation date of
the deviation.
Dated: August 2, 2018.
Hal R. Pitts,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2018-16845 Filed 8-8-18; 8:45 am]
BILLING CODE 9110-04-P