Notice of Availability of Government-Owned Inventions; Available for Licensing, 38686-38687 [2018-16875]
Download as PDF
38686
Federal Register / Vol. 83, No. 152 / Tuesday, August 7, 2018 / Notices
You may send an email to Mr. Kris
Kleinschmidt at Kris.Kleinschmidt@
noaa.gov or contact him at (503) 820–
2280, extension 411 for technical
assistance.
Council address: Pacific Fishery
Management Council, 7700 NE
Ambassador Place, Suite 101, Portland,
OR 97220.
Dr.
Kit Dahl, Pacific Council; telephone:
(503) 820–2422.
FOR FURTHER INFORMATION CONTACT:
Department of the Army, Corps of
Engineers
DEPARTMENT OF DEFENSE
On March
20, 2018, the Office of Management and
Budget (OMB) and the Council on
Environmental Quality (CEQ) issued an
OMB/CEQ Memorandum for Heads of
Federal Departments and Agencies
titled ‘‘One Federal Decision Framework
for the Environmental Review and
Authorization Process for Major
Infrastructure Projects under Executive
Order [E.O.] 13807.’’ Additionally,
twelve federal agencies, including
Department of the Army, signed a
Memorandum of Understanding (MOU)
as an appendix to the OMB/CEQ
Memorandum. The MOU is titled
‘‘Memorandum of Understanding
Implementing One Federal Decision
Under Executive Order 13807’’ and was
effective on April 10, 2018. E.O. 13807
sets a goal for agencies of reducing the
time for completing environmental
reviews and authorization decisions to
an agency average of not more than two
years from publication of a NOI to
prepare an EIS. The MOU set forth
activities to be accomplished before the
issuance of an NOI, including project
prescoping, the development of a
permitting timetable, and the
development of project Purpose and
Need. Because the Cedar Ridge
Reservoir planning had not reached
these milestones prior to publication of
the NOI, the NOI is being withdrawn
until such time that these milestones are
complete.
Department of the Army; Corps of
Engineers
Brenda S. Bowen,
Army Federal Register Liaison Officer.
Availability of the Final Environmental
Impact Statement for the Northern
Integrated Supply Project, Larimer and
Weld Counties, Colorado
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice; extension of public
comment deadline.
AGENCY:
The EWG
is holding this webinar to help other
Council advisory bodies and the public
prepare comments on two topics the
Council will take up at its September 7–
12, 2018 meeting. First, the Council will
be deciding on future activities as part
of the Climate and Communities
Initiative pursuant to its Fishery
Ecosystem Plan (FEP). Second, the
Council will be scoping the first 5-year
review of the FEP. The Council may
consider initiating revisions to FEP and
forming any new ad hoc committees
necessary to revise the Plan. To help
advisory bodies and the public make
comments on these topics the EWG
prepared two sets of discussion
questions, available on the Council’s
website (https://www.pcouncil.org/):
• Webinar Discussion Questions
• Webinar Agenda
Although non-emergency issues not
contained in the meeting agenda may be
discussed, those issues may not be the
subject of formal action during this
meeting. Action will be restricted to
those issues specifically listed in this
document and any issues arising after
publication of this document that
require emergency action under section
305(c) of the Magnuson-Stevens Fishery
Conservation and Management Act,
provided the public has been notified of
the intent to take final action to address
the emergency.
SUMMARY:
Special Accommodations
SUMMARY:
SUPPLEMENTARY INFORMATION:
daltland on DSKBBV9HB2PROD with NOTICES
(817) 886–1729; CedarRidge@
usace.army.mil.
DEPARTMENT OF DEFENSE
This meeting is physically accessible
to people with disabilities. Requests for
sign language interpretation or other
auxiliary aids should be directed to Mr.
Kris Kleinschmidt, (503) 820–2411, at
least 10 business days prior to the
meeting date.
Dated: August 1, 2018.
Tracey L. Thompson,
Acting Deputy Director, Office of Sustainable
Fisheries, National Marine Fisheries Service.
[FR Doc. 2018–16809 Filed 8–6–18; 8:45 am]
BILLING CODE 3510–22–P
VerDate Sep<11>2014
16:54 Aug 06, 2018
Jkt 244001
The comment period for the
Availability of the Final Environmental
Impact Statement for the Northern
Integrated Supply Project, Larimer and
Weld Counties, Colorado published in
the Federal Register on Friday, July 20,
2018, and required comments be
postmarked on or before September 4,
2018. The Corps is extending the
deadline for submitting public
comments to October 4, 2018.
FOR FURTHER INFORMATION CONTACT: John
Urbanic, NISP EIS Project Manager,
telephone 303–979–4120, fax at 303–
979–0602, or email at nisp.eis@
usace.army.mil.
SUPPLEMENTARY INFORMATION: None.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 2018–16861 Filed 8–6–18; 8:45 am]
BILLING CODE 3720–58–P
Withdrawal of the Notice of Intent To
Prepare an Environmental Impact
Statement (EIS) for the City of Abilene,
TX, Cedar Ridge Reservoir Water
Supply Project
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice.
AGENCY:
The U.S. Army Corps of
Engineers, Fort Worth District,
Regulatory Division is notifying
interested parties that it has withdrawn
the Notice of Intent (NOI) to develop an
EIS for the proposed Cedar Ridge
Reservoir. The original NOI to Prepare
an EIS was published in the Federal
Register on Friday, April 13, 2018.
FOR FURTHER INFORMATION CONTACT:
Questions regarding the withdrawal of
this NOI should be addressed to Mr.
Frederick Land, Regulatory Division
(CESWF–DE–R), Fort Worth District,
U.S. Army Corps of Engineers, P.O. Box
17300, Fort Worth, TX 76102–0300;
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
SUPPLEMENTARY INFORMATION:
[FR Doc. 2018–16862 Filed 8–6–18; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Navy
Notice of Availability of GovernmentOwned Inventions; Available for
Licensing
Department of the Navy, DoD.
Notice.
AGENCY:
ACTION:
The Department of the Navy
(DoN) announces the availability of the
inventions listed below, assigned to the
United States Government, as
represented by the Secretary of the
Navy, for domestic and foreign licensing
by the Department of the Navy.
ADDRESSES: Requests for copies of the
patents cited should be directed to
Naval Surface Warfare Center, Crane
Div., Code OOL, Bldg. 2, 300 Highway
361, Crane, IN 47522–5001.
SUMMARY:
E:\FR\FM\07AUN1.SGM
07AUN1
Federal Register / Vol. 83, No. 152 / Tuesday, August 7, 2018 / Notices
Mr.
Christopher Monsey, Naval Surface
Warfare Center, Crane Div., Code OOL,
Bldg. 2, 300 Highway 361, Crane, IN
47522–5001, email
Christopher.Monsey@navy.mil, 812–
854–2777.
SUPPLEMENTARY INFORMATION: The
following patents are available for
licensing: Patent No. 10,012,457 (Navy
Case No. 200367): TAKE-DOWN
COMPACT PRECISION RIFLE//Patent
No. 10,036,800 (Navy Case No. 103387):
SYSTEMS AND METHODS FOR USING
COHERENT NOISE FILTERING//and
Patent No. 10,037,498 (Navy Case No.
100130): PROJECT MANAGEMENT
SYSTEM AND METHOD.
FOR FURTHER INFORMATION CONTACT:
Authority: 35 U.S.C. 207, 37 CFR part 404
Dated: August 2, 2018.
Emilee Kujat Baldini,
Lieutenant Commander, Judge Advocate
General’s Corps, U.S. Navy, Federal Register
Liaison Officer.
[FR Doc. 2018–16875 Filed 8–6–18; 8:45 am]
BILLING CODE 3810–FF–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Swan Lake Dam
[Project No. 2804–035]
daltland on DSKBBV9HB2PROD with NOTICES
Goose River Hydro, Inc.; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Minor
License.
b. Project No.: 2804–035.
c. Date filed: February 2, 2018.
d. Applicant: Goose River Hydro, Inc.
e. Name of Project: Goose River
Hydroelectric Project.
f. Location: On the Goose River, in
Waldo County, Maine. No federal lands
are occupied by the project works or
located within the project boundary.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Nicholas
Cabral, Goose River Hydro, Inc., 41
Sedgewood Drive, Kennebunk, ME
04043; (207) 604–4394; email—
gooseriverhydro@gmail.com.
i. FERC Contact: Julia Kolberg at (202)
502–8261; or email at julia.kolberg@
ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
VerDate Sep<11>2014
16:54 Aug 06, 2018
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2804–035.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
but is not ready for environmental
analysis at this time.
l. The project consists of the following
existing facilities:
Jkt 244001
(1) A 14-foot-high, 250-foot-long rock
masonry gravity dam impounding Swan
Lake with a surface area of
approximately 1,364 acres at an
elevation of 201 feet above sea level; (2)
a concrete inlet structure; (3) three 3.5foot-high, 4-foot-wide manually
operated butterfly gates that regulate
flow through the inlet structure; (4) two
culverts the convey flow under Route
141; and (5) appurtenant facilities.
Mason’s Dam
(1) A 15-foot-high, 86-foot-long rock
masonry dam impounding a reservoir
with a storage capacity of approximately
1,621 acre-feet at an elevation of 188
feet above sea level; (2) a concrete inlet
structure; (3) a manually operated
butterfly gate regulating flow from the
inlet structure to the penstock; (4) a 3foot-diameter, 350-foot-long steel
penstock; (5) a 266-square-foot concrete
powerhouse containing two Kaplan
turbines and generating units with a
licensed capacity of 75 kW; (6) a 300foot-long, 12-kilovolt (kV) transmission
line and (7) appurtenant facilities.
Kelley Dam
(1) A 15-foot-high, 135-foot-long
masonry gravity dam impounding a
reservoir with a storage capacity of
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
38687
approximately 200 acre-feet at an
elevation of approximately 159 feet
above sea level; and (2) three 3-foothigh, 4-foot-wide manually operated
butterfly gates.
Mill Dam
(1) A 6-foot-tall, 70-foot-wide masonry
dam impounding a reservoir with a
storage capacity of approximately 7
acre-feet at an elevation of
approximately 128 feet above sea level;
(2) a concrete inlet structure; (3) a trash
sluice with wooden stop logs; (4) a
powerhouse containing a Francis-type
turbine and generator unit with a
licensed capacity of 94 kW; and (5) an
approximately 100-foot-long, 12-kV
transmission line. The penstock used to
deliver water to the powerhouse has
been removed due to deterioration and
subsequent leakage; thus, the
powerhouse is not operating.
CMP Dam
(1) A 21-foot-high, 231-foot-long
buttress dam impounding a reservoir
with a storage capacity of approximately
72 acre-feet at an elevation of
approximately 109 feet above sea level;
(2) a manually operated low-level water
release lift gate; (3) a manually operated
lift gate regulating flow to the penstock;
(4) a 5-foot-diameter, 1,200-foot-long
steel penstock; (5) a 300-square-foot
concrete and timber powerhouse with a
Kaplan-type turbine and generator unit
with a licensed capacity of 200 kW; and
(6) an approximately 500-foot-long, 12kV transmission line. The penstock used
to deliver water to the powerhouse is
currently out of service due to damage,
deterioration, and subsequent leakage;
thus, the powerhouse is not operating.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
E:\FR\FM\07AUN1.SGM
07AUN1
Agencies
[Federal Register Volume 83, Number 152 (Tuesday, August 7, 2018)]
[Notices]
[Pages 38686-38687]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-16875]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Navy
Notice of Availability of Government-Owned Inventions; Available
for Licensing
AGENCY: Department of the Navy, DoD.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Department of the Navy (DoN) announces the availability of
the inventions listed below, assigned to the United States Government,
as represented by the Secretary of the Navy, for domestic and foreign
licensing by the Department of the Navy.
ADDRESSES: Requests for copies of the patents cited should be directed
to Naval Surface Warfare Center, Crane Div., Code OOL, Bldg. 2, 300
Highway 361, Crane, IN 47522-5001.
[[Page 38687]]
FOR FURTHER INFORMATION CONTACT: Mr. Christopher Monsey, Naval Surface
Warfare Center, Crane Div., Code OOL, Bldg. 2, 300 Highway 361, Crane,
IN 47522-5001, email [email protected], 812-854-2777.
SUPPLEMENTARY INFORMATION: The following patents are available for
licensing: Patent No. 10,012,457 (Navy Case No. 200367): TAKE-DOWN
COMPACT PRECISION RIFLE//Patent No. 10,036,800 (Navy Case No. 103387):
SYSTEMS AND METHODS FOR USING COHERENT NOISE FILTERING//and Patent No.
10,037,498 (Navy Case No. 100130): PROJECT MANAGEMENT SYSTEM AND
METHOD.
Authority: 35 U.S.C. 207, 37 CFR part 404
Dated: August 2, 2018.
Emilee Kujat Baldini,
Lieutenant Commander, Judge Advocate General's Corps, U.S. Navy,
Federal Register Liaison Officer.
[FR Doc. 2018-16875 Filed 8-6-18; 8:45 am]
BILLING CODE 3810-FF-P