Targa NGL Pipeline Company LLC; Notice of Petition for Declaratory Order, 38299 [2018-16751]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 83, No. 151 / Monday, August 6, 2018 / Notices
PJM and Buckeye Power, Inc. to be
effective 10/1/2018.
Filed Date: 7/31/18.
Accession Number: 20180731–5088.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18–2111–000.
Applicants: Midcontinent
Independent System Operator, Inc., ITC
Midwest LLC.
Description: § 205(d) Rate Filing:
2018–07–31_SA 3142 ITC Midwest-EDF
Renewables E&P Agreement (J495) to be
effective 9/30/2018.
Filed Date: 7/31/18.
Accession Number: 20180731–5111.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18–2112–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–07–31_SA 3137 Entergy ArkansasCooperative Energy TSR CPA (F116) to
be effective 6/28/2018.
Filed Date: 7/31/18.
Accession Number: 20180731–5141.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18–2113–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–07–31_Revisions to Attachment
O–MRES interest rate calculation
language to be effective 8/1/2018.
Filed Date: 7/31/18.
Accession Number: 20180731–5153.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18–2114–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3215R4 People’s Electric Cooperative
NITSA NOA to be effective 7/1/2018.
Filed Date: 7/31/18.
Accession Number: 20180731–5176.
Comments Due: 5 p.m. ET 8/21/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
17:36 Aug 03, 2018
Jkt 244001
Dated: July 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–16747 Filed 8–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR18–30–000]
Targa NGL Pipeline Company LLC;
Notice of Petition for Declaratory Order
Take notice that on July 27, 2018,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2017),
Targa NGL Pipeline Company LLC
(Targa or Petitioner) filed a declaratory
order petition seeking approval of the
overall tariff rate structure and terms
and conditions of service, including the
proposed prorationing methodology for
a new pipeline system that Targa is
developing through a combination of
newly constructed and leased capacity
to transport mixed natural gas liquids
from processing facilities in Coal and
Hughes Counties, Oklahoma to Targa’s
affiliate’s storage facilities in Mont
Belvieu, Texas, all as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
38299
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on August 27, 2018.
Dated: July 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–16751 Filed 8–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–2091–000]
Titan Solar, LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Titan
Solar, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 20,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
E:\FR\FM\06AUN1.SGM
06AUN1
Agencies
[Federal Register Volume 83, Number 151 (Monday, August 6, 2018)]
[Notices]
[Page 38299]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-16751]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR18-30-000]
Targa NGL Pipeline Company LLC; Notice of Petition for
Declaratory Order
Take notice that on July 27, 2018, pursuant to Rule 207(a)(2) of
the Federal Energy Regulatory Commission's (Commission) Rules of
Practice and Procedure, 18 CFR 385.207(a)(2) (2017), Targa NGL Pipeline
Company LLC (Targa or Petitioner) filed a declaratory order petition
seeking approval of the overall tariff rate structure and terms and
conditions of service, including the proposed prorationing methodology
for a new pipeline system that Targa is developing through a
combination of newly constructed and leased capacity to transport mixed
natural gas liquids from processing facilities in Coal and Hughes
Counties, Oklahoma to Targa's affiliate's storage facilities in Mont
Belvieu, Texas, all as more fully explained in the petition.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Petitioner.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the website that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
[email protected], or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern time on August 27, 2018.
Dated: July 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-16751 Filed 8-3-18; 8:45 am]
BILLING CODE 6717-01-P