Combined Notice of Filings #2, 38298-38299 [2018-16747]
Download as PDF
38298
Federal Register / Vol. 83, No. 151 / Monday, August 6, 2018 / Notices
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Meeting Procedures
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
Dated: July 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–16752 Filed 8–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–1978–000]
sradovich on DSK3GMQ082PROD with NOTICES
Casa Mesa Wind, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Casa
Mesa Wind, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 20,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
VerDate Sep<11>2014
17:36 Aug 03, 2018
Jkt 244001
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Calpine Bethlehem, LLC, Calpine
Construction Finance Company, L.P.,
Calpine Energy Solutions, LLC, Calpine
Fore River Energy Center, LLC, Calpine
Gilroy Cogen, L.P., Calpine Mid-Atlantic
Generation, LLC, Calpine Mid-Atlantic
Marketing, LLC, Calpine Mid Merit,
LLC, Calpine Mid-Merit II, LLC, Calpine
New Jersey Generation, LLC, Calpine
Power America—CA, LLC, Calpine
Vineland Solar, LLC, CCFC Sutter
Energy, LLC, CES Marketing IX, LLC,
CES Marketing X, LLC, Champion
Energy, LLC, Champion Energy
Marketing LLC, Champion Energy
Services, LLC, CPN Bethpage 3rd
Turbine, Inc., Creed Energy Center, LLC,
Delta Energy Center, LLC, Geysers
Power Company, LLC, Gilroy Energy
Center, LLC, Goose Haven Energy
Center, LLC, Granite Ridge Energy, LLC,
Hermiston Power, LLC, KIAC Partners,
Los Esteros Critical Energy Facility LLC,
Los Medanos Energy Center, LLC,
Metcalf Energy Center, LLC, Morgan
Dated: July 31, 2018.
Energy Center, LLC, Nissequogue Cogen
Partners, North American Power and
Nathaniel J. Davis, Sr.,
Gas, LLC, North American Power
Deputy Secretary.
Business, LLC, O.L.S. Energy-Agnews,
[FR Doc. 2018–16749 Filed 8–3–18; 8:45 am]
Inc., Otay Mesa Energy Center, LLC,
BILLING CODE 6717–01–P
Pastoria Energy Facility L.L.C., Pine
Bluff Energy, LLC, RockGen Energy,
LLC, Power Contract Financing, L.L.C.,
DEPARTMENT OF ENERGY
Russell City Energy Company, LLC,
Federal Energy Regulatory
South Point Energy Center, LLC,
Commission
Westbrook Energy Center, LLC, Zion
Energy LLC, TBG Cogen Partners,
Combined Notice of Filings #2
Garrison Energy Center LLC.
Description: Notification of Change in
Take notice that the Commission
Status of the Calpine MBR Sellers.
received the following electric rate
Filed Date: 7/31/18.
filings:
Accession Number: 20180731–5112.
Docket Numbers: ER10–2042–028;
Comments Due: 5 p.m. ET 8/21/18.
ER10–1945–008; ER10–1944–006;
Docket Numbers: ER18–614–003.
ER10–2051–008; ER10–1942–020;
Applicants: PJM Interconnection,
ER17–696–008; ER14–2931–006; ER10–
1941–010; ER10–2043–008; ER10–2029– L.L.C.
Description: Compliance filing:
010; ER10–2041–008; ER18–1321–001;
Compliance Filing—OATT, Sch. 12—
ER10–2040–008; ER10–1938–023;
Appendix A re: RTEP to be effective 4/
ER10–2036–009; ER13–1407–007;
5/2018.
ER10–1934–022; ER10–1893–022;
Filed Date: 7/31/18.
ER10–3051–027; ER10–2985–026;
Accession Number: 20180731–5110.
ER10–3049–027; ER10–1889–006;
Comments Due: 5 p.m. ET 8/21/18.
ER10–1888–010; ER10–1885–010;
Docket Numbers: ER18–1737–001.
ER15–748–004; ER10–1884–010; ER10–
Applicants: Northern Indiana Public
1883–010; ER10–1878–010; ER10–3260–
Service Company.
008; ER10–1877–005; ER10–1895–006;
Description: Tariff Amendment:
ER10–1876–010; ER10–1875–010;
Amendment to Reactive Power Rate
ER10–1873–010; ER10–1871–007;
Filing of NIPSCO to be effective 10/1/
ER10–1870–006; ER11–4369–007;
2018.
ER16–2218–007; ER12–1987–008;
Filed Date: 7/31/18.
ER10–1947–010; ER12–2645–003;
Accession Number: 20180731–5107.
ER10–1863–006; ER10–1862–022;
Comments Due: 5 p.m. ET 8/21/18.
ER10–1933–005; ER12–2261–009;
Docket Numbers: ER18–2110–000.
ER10–1865–009; ER10–1858–006;
Applicants: Buckeye Power, Inc., PJM
ER13–1401–006; ER10–2044–008.
Applicants: Calpine Energy Services,
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
L.P., Auburndale Peaker Energy Center,
Revised SA No. 4753—NITSA among
LLC, Bethpage Energy Center 3, LLC,
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
E:\FR\FM\06AUN1.SGM
06AUN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 83, No. 151 / Monday, August 6, 2018 / Notices
PJM and Buckeye Power, Inc. to be
effective 10/1/2018.
Filed Date: 7/31/18.
Accession Number: 20180731–5088.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18–2111–000.
Applicants: Midcontinent
Independent System Operator, Inc., ITC
Midwest LLC.
Description: § 205(d) Rate Filing:
2018–07–31_SA 3142 ITC Midwest-EDF
Renewables E&P Agreement (J495) to be
effective 9/30/2018.
Filed Date: 7/31/18.
Accession Number: 20180731–5111.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18–2112–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–07–31_SA 3137 Entergy ArkansasCooperative Energy TSR CPA (F116) to
be effective 6/28/2018.
Filed Date: 7/31/18.
Accession Number: 20180731–5141.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18–2113–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–07–31_Revisions to Attachment
O–MRES interest rate calculation
language to be effective 8/1/2018.
Filed Date: 7/31/18.
Accession Number: 20180731–5153.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18–2114–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3215R4 People’s Electric Cooperative
NITSA NOA to be effective 7/1/2018.
Filed Date: 7/31/18.
Accession Number: 20180731–5176.
Comments Due: 5 p.m. ET 8/21/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
17:36 Aug 03, 2018
Jkt 244001
Dated: July 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–16747 Filed 8–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR18–30–000]
Targa NGL Pipeline Company LLC;
Notice of Petition for Declaratory Order
Take notice that on July 27, 2018,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2017),
Targa NGL Pipeline Company LLC
(Targa or Petitioner) filed a declaratory
order petition seeking approval of the
overall tariff rate structure and terms
and conditions of service, including the
proposed prorationing methodology for
a new pipeline system that Targa is
developing through a combination of
newly constructed and leased capacity
to transport mixed natural gas liquids
from processing facilities in Coal and
Hughes Counties, Oklahoma to Targa’s
affiliate’s storage facilities in Mont
Belvieu, Texas, all as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
38299
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on August 27, 2018.
Dated: July 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–16751 Filed 8–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–2091–000]
Titan Solar, LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Titan
Solar, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 20,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
E:\FR\FM\06AUN1.SGM
06AUN1
Agencies
[Federal Register Volume 83, Number 151 (Monday, August 6, 2018)]
[Notices]
[Pages 38298-38299]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-16747]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2042-028; ER10-1945-008; ER10-1944-006; ER10-
2051-008; ER10-1942-020; ER17-696-008; ER14-2931-006; ER10-1941-010;
ER10-2043-008; ER10-2029-010; ER10-2041-008; ER18-1321-001; ER10-2040-
008; ER10-1938-023; ER10-2036-009; ER13-1407-007; ER10-1934-022; ER10-
1893-022; ER10-3051-027; ER10-2985-026; ER10-3049-027; ER10-1889-006;
ER10-1888-010; ER10-1885-010; ER15-748-004; ER10-1884-010; ER10-1883-
010; ER10-1878-010; ER10-3260-008; ER10-1877-005; ER10-1895-006; ER10-
1876-010; ER10-1875-010; ER10-1873-010; ER10-1871-007; ER10-1870-006;
ER11-4369-007; ER16-2218-007; ER12-1987-008; ER10-1947-010; ER12-2645-
003; ER10-1863-006; ER10-1862-022; ER10-1933-005; ER12-2261-009; ER10-
1865-009; ER10-1858-006; ER13-1401-006; ER10-2044-008.
Applicants: Calpine Energy Services, L.P., Auburndale Peaker Energy
Center, LLC, Bethpage Energy Center 3, LLC, Calpine Bethlehem, LLC,
Calpine Construction Finance Company, L.P., Calpine Energy Solutions,
LLC, Calpine Fore River Energy Center, LLC, Calpine Gilroy Cogen, L.P.,
Calpine Mid-Atlantic Generation, LLC, Calpine Mid-Atlantic Marketing,
LLC, Calpine Mid Merit, LLC, Calpine Mid-Merit II, LLC, Calpine New
Jersey Generation, LLC, Calpine Power America--CA, LLC, Calpine
Vineland Solar, LLC, CCFC Sutter Energy, LLC, CES Marketing IX, LLC,
CES Marketing X, LLC, Champion Energy, LLC, Champion Energy Marketing
LLC, Champion Energy Services, LLC, CPN Bethpage 3rd Turbine, Inc.,
Creed Energy Center, LLC, Delta Energy Center, LLC, Geysers Power
Company, LLC, Gilroy Energy Center, LLC, Goose Haven Energy Center,
LLC, Granite Ridge Energy, LLC, Hermiston Power, LLC, KIAC Partners,
Los Esteros Critical Energy Facility LLC, Los Medanos Energy Center,
LLC, Metcalf Energy Center, LLC, Morgan Energy Center, LLC, Nissequogue
Cogen Partners, North American Power and Gas, LLC, North American Power
Business, LLC, O.L.S. Energy-Agnews, Inc., Otay Mesa Energy Center,
LLC, Pastoria Energy Facility L.L.C., Pine Bluff Energy, LLC, RockGen
Energy, LLC, Power Contract Financing, L.L.C., Russell City Energy
Company, LLC, South Point Energy Center, LLC, Westbrook Energy Center,
LLC, Zion Energy LLC, TBG Cogen Partners, Garrison Energy Center LLC.
Description: Notification of Change in Status of the Calpine MBR
Sellers.
Filed Date: 7/31/18.
Accession Number: 20180731-5112.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18-614-003.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Compliance Filing--OATT, Sch. 12--
Appendix A re: RTEP to be effective 4/5/2018.
Filed Date: 7/31/18.
Accession Number: 20180731-5110.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18-1737-001.
Applicants: Northern Indiana Public Service Company.
Description: Tariff Amendment: Amendment to Reactive Power Rate
Filing of NIPSCO to be effective 10/1/2018.
Filed Date: 7/31/18.
Accession Number: 20180731-5107.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18-2110-000.
Applicants: Buckeye Power, Inc., PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revised SA No. 4753--NITSA
among
[[Page 38299]]
PJM and Buckeye Power, Inc. to be effective 10/1/2018.
Filed Date: 7/31/18.
Accession Number: 20180731-5088.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18-2111-000.
Applicants: Midcontinent Independent System Operator, Inc., ITC
Midwest LLC.
Description: Sec. 205(d) Rate Filing: 2018-07-31_SA 3142 ITC
Midwest-EDF Renewables E&P Agreement (J495) to be effective 9/30/2018.
Filed Date: 7/31/18.
Accession Number: 20180731-5111.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18-2112-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-07-31_SA 3137 Entergy
Arkansas-Cooperative Energy TSR CPA (F116) to be effective 6/28/2018.
Filed Date: 7/31/18.
Accession Number: 20180731-5141.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18-2113-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-07-31_Revisions to
Attachment O-MRES interest rate calculation language to be effective 8/
1/2018.
Filed Date: 7/31/18.
Accession Number: 20180731-5153.
Comments Due: 5 p.m. ET 8/21/18.
Docket Numbers: ER18-2114-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3215R4 People's Electric
Cooperative NITSA NOA to be effective 7/1/2018.
Filed Date: 7/31/18.
Accession Number: 20180731-5176.
Comments Due: 5 p.m. ET 8/21/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-16747 Filed 8-3-18; 8:45 am]
BILLING CODE 6717-01-P