Combined Notice of Filings #2, 38298-38299 [2018-16747]

Download as PDF 38298 Federal Register / Vol. 83, No. 151 / Monday, August 6, 2018 / Notices development of an environmental document. Meeting participants should come prepared to discuss their issues and/or concerns. Please review the PAD in preparation for the scoping meetings. Directions on how to obtain a copy of the PAD and SD1 are included in item n. of this document. Meeting Procedures The meetings will be recorded by a stenographer and will be placed in the public records of the project. Dated: July 31, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–16752 Filed 8–3–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–1978–000] sradovich on DSK3GMQ082PROD with NOTICES Casa Mesa Wind, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Casa Mesa Wind, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is August 20, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the VerDate Sep<11>2014 17:36 Aug 03, 2018 Jkt 244001 eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Calpine Bethlehem, LLC, Calpine Construction Finance Company, L.P., Calpine Energy Solutions, LLC, Calpine Fore River Energy Center, LLC, Calpine Gilroy Cogen, L.P., Calpine Mid-Atlantic Generation, LLC, Calpine Mid-Atlantic Marketing, LLC, Calpine Mid Merit, LLC, Calpine Mid-Merit II, LLC, Calpine New Jersey Generation, LLC, Calpine Power America—CA, LLC, Calpine Vineland Solar, LLC, CCFC Sutter Energy, LLC, CES Marketing IX, LLC, CES Marketing X, LLC, Champion Energy, LLC, Champion Energy Marketing LLC, Champion Energy Services, LLC, CPN Bethpage 3rd Turbine, Inc., Creed Energy Center, LLC, Delta Energy Center, LLC, Geysers Power Company, LLC, Gilroy Energy Center, LLC, Goose Haven Energy Center, LLC, Granite Ridge Energy, LLC, Hermiston Power, LLC, KIAC Partners, Los Esteros Critical Energy Facility LLC, Los Medanos Energy Center, LLC, Metcalf Energy Center, LLC, Morgan Dated: July 31, 2018. Energy Center, LLC, Nissequogue Cogen Partners, North American Power and Nathaniel J. Davis, Sr., Gas, LLC, North American Power Deputy Secretary. Business, LLC, O.L.S. Energy-Agnews, [FR Doc. 2018–16749 Filed 8–3–18; 8:45 am] Inc., Otay Mesa Energy Center, LLC, BILLING CODE 6717–01–P Pastoria Energy Facility L.L.C., Pine Bluff Energy, LLC, RockGen Energy, LLC, Power Contract Financing, L.L.C., DEPARTMENT OF ENERGY Russell City Energy Company, LLC, Federal Energy Regulatory South Point Energy Center, LLC, Commission Westbrook Energy Center, LLC, Zion Energy LLC, TBG Cogen Partners, Combined Notice of Filings #2 Garrison Energy Center LLC. Description: Notification of Change in Take notice that the Commission Status of the Calpine MBR Sellers. received the following electric rate Filed Date: 7/31/18. filings: Accession Number: 20180731–5112. Docket Numbers: ER10–2042–028; Comments Due: 5 p.m. ET 8/21/18. ER10–1945–008; ER10–1944–006; Docket Numbers: ER18–614–003. ER10–2051–008; ER10–1942–020; Applicants: PJM Interconnection, ER17–696–008; ER14–2931–006; ER10– 1941–010; ER10–2043–008; ER10–2029– L.L.C. Description: Compliance filing: 010; ER10–2041–008; ER18–1321–001; Compliance Filing—OATT, Sch. 12— ER10–2040–008; ER10–1938–023; Appendix A re: RTEP to be effective 4/ ER10–2036–009; ER13–1407–007; 5/2018. ER10–1934–022; ER10–1893–022; Filed Date: 7/31/18. ER10–3051–027; ER10–2985–026; Accession Number: 20180731–5110. ER10–3049–027; ER10–1889–006; Comments Due: 5 p.m. ET 8/21/18. ER10–1888–010; ER10–1885–010; Docket Numbers: ER18–1737–001. ER15–748–004; ER10–1884–010; ER10– Applicants: Northern Indiana Public 1883–010; ER10–1878–010; ER10–3260– Service Company. 008; ER10–1877–005; ER10–1895–006; Description: Tariff Amendment: ER10–1876–010; ER10–1875–010; Amendment to Reactive Power Rate ER10–1873–010; ER10–1871–007; Filing of NIPSCO to be effective 10/1/ ER10–1870–006; ER11–4369–007; 2018. ER16–2218–007; ER12–1987–008; Filed Date: 7/31/18. ER10–1947–010; ER12–2645–003; Accession Number: 20180731–5107. ER10–1863–006; ER10–1862–022; Comments Due: 5 p.m. ET 8/21/18. ER10–1933–005; ER12–2261–009; Docket Numbers: ER18–2110–000. ER10–1865–009; ER10–1858–006; Applicants: Buckeye Power, Inc., PJM ER13–1401–006; ER10–2044–008. Applicants: Calpine Energy Services, Interconnection, L.L.C. Description: § 205(d) Rate Filing: L.P., Auburndale Peaker Energy Center, Revised SA No. 4753—NITSA among LLC, Bethpage Energy Center 3, LLC, PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\06AUN1.SGM 06AUN1 sradovich on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 83, No. 151 / Monday, August 6, 2018 / Notices PJM and Buckeye Power, Inc. to be effective 10/1/2018. Filed Date: 7/31/18. Accession Number: 20180731–5088. Comments Due: 5 p.m. ET 8/21/18. Docket Numbers: ER18–2111–000. Applicants: Midcontinent Independent System Operator, Inc., ITC Midwest LLC. Description: § 205(d) Rate Filing: 2018–07–31_SA 3142 ITC Midwest-EDF Renewables E&P Agreement (J495) to be effective 9/30/2018. Filed Date: 7/31/18. Accession Number: 20180731–5111. Comments Due: 5 p.m. ET 8/21/18. Docket Numbers: ER18–2112–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–07–31_SA 3137 Entergy ArkansasCooperative Energy TSR CPA (F116) to be effective 6/28/2018. Filed Date: 7/31/18. Accession Number: 20180731–5141. Comments Due: 5 p.m. ET 8/21/18. Docket Numbers: ER18–2113–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–07–31_Revisions to Attachment O–MRES interest rate calculation language to be effective 8/1/2018. Filed Date: 7/31/18. Accession Number: 20180731–5153. Comments Due: 5 p.m. ET 8/21/18. Docket Numbers: ER18–2114–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3215R4 People’s Electric Cooperative NITSA NOA to be effective 7/1/2018. Filed Date: 7/31/18. Accession Number: 20180731–5176. Comments Due: 5 p.m. ET 8/21/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. VerDate Sep<11>2014 17:36 Aug 03, 2018 Jkt 244001 Dated: July 31, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–16747 Filed 8–3–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR18–30–000] Targa NGL Pipeline Company LLC; Notice of Petition for Declaratory Order Take notice that on July 27, 2018, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2) (2017), Targa NGL Pipeline Company LLC (Targa or Petitioner) filed a declaratory order petition seeking approval of the overall tariff rate structure and terms and conditions of service, including the proposed prorationing methodology for a new pipeline system that Targa is developing through a combination of newly constructed and leased capacity to transport mixed natural gas liquids from processing facilities in Coal and Hughes Counties, Oklahoma to Targa’s affiliate’s storage facilities in Mont Belvieu, Texas, all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 38299 website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on August 27, 2018. Dated: July 31, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–16751 Filed 8–3–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–2091–000] Titan Solar, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Titan Solar, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is August 20, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies E:\FR\FM\06AUN1.SGM 06AUN1

Agencies

[Federal Register Volume 83, Number 151 (Monday, August 6, 2018)]
[Notices]
[Pages 38298-38299]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-16747]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2042-028; ER10-1945-008; ER10-1944-006; ER10-
2051-008; ER10-1942-020; ER17-696-008; ER14-2931-006; ER10-1941-010; 
ER10-2043-008; ER10-2029-010; ER10-2041-008; ER18-1321-001; ER10-2040-
008; ER10-1938-023; ER10-2036-009; ER13-1407-007; ER10-1934-022; ER10-
1893-022; ER10-3051-027; ER10-2985-026; ER10-3049-027; ER10-1889-006; 
ER10-1888-010; ER10-1885-010; ER15-748-004; ER10-1884-010; ER10-1883-
010; ER10-1878-010; ER10-3260-008; ER10-1877-005; ER10-1895-006; ER10-
1876-010; ER10-1875-010; ER10-1873-010; ER10-1871-007; ER10-1870-006; 
ER11-4369-007; ER16-2218-007; ER12-1987-008; ER10-1947-010; ER12-2645-
003; ER10-1863-006; ER10-1862-022; ER10-1933-005; ER12-2261-009; ER10-
1865-009; ER10-1858-006; ER13-1401-006; ER10-2044-008.
    Applicants: Calpine Energy Services, L.P., Auburndale Peaker Energy 
Center, LLC, Bethpage Energy Center 3, LLC, Calpine Bethlehem, LLC, 
Calpine Construction Finance Company, L.P., Calpine Energy Solutions, 
LLC, Calpine Fore River Energy Center, LLC, Calpine Gilroy Cogen, L.P., 
Calpine Mid-Atlantic Generation, LLC, Calpine Mid-Atlantic Marketing, 
LLC, Calpine Mid Merit, LLC, Calpine Mid-Merit II, LLC, Calpine New 
Jersey Generation, LLC, Calpine Power America--CA, LLC, Calpine 
Vineland Solar, LLC, CCFC Sutter Energy, LLC, CES Marketing IX, LLC, 
CES Marketing X, LLC, Champion Energy, LLC, Champion Energy Marketing 
LLC, Champion Energy Services, LLC, CPN Bethpage 3rd Turbine, Inc., 
Creed Energy Center, LLC, Delta Energy Center, LLC, Geysers Power 
Company, LLC, Gilroy Energy Center, LLC, Goose Haven Energy Center, 
LLC, Granite Ridge Energy, LLC, Hermiston Power, LLC, KIAC Partners, 
Los Esteros Critical Energy Facility LLC, Los Medanos Energy Center, 
LLC, Metcalf Energy Center, LLC, Morgan Energy Center, LLC, Nissequogue 
Cogen Partners, North American Power and Gas, LLC, North American Power 
Business, LLC, O.L.S. Energy-Agnews, Inc., Otay Mesa Energy Center, 
LLC, Pastoria Energy Facility L.L.C., Pine Bluff Energy, LLC, RockGen 
Energy, LLC, Power Contract Financing, L.L.C., Russell City Energy 
Company, LLC, South Point Energy Center, LLC, Westbrook Energy Center, 
LLC, Zion Energy LLC, TBG Cogen Partners, Garrison Energy Center LLC.
    Description: Notification of Change in Status of the Calpine MBR 
Sellers.
    Filed Date: 7/31/18.
    Accession Number: 20180731-5112.
    Comments Due: 5 p.m. ET 8/21/18.

    Docket Numbers: ER18-614-003.
    Applicants: PJM Interconnection, L.L.C.
    Description: Compliance filing: Compliance Filing--OATT, Sch. 12--
Appendix A re: RTEP to be effective 4/5/2018.
    Filed Date: 7/31/18.
    Accession Number: 20180731-5110.
    Comments Due: 5 p.m. ET 8/21/18.

    Docket Numbers: ER18-1737-001.
    Applicants: Northern Indiana Public Service Company.
    Description: Tariff Amendment: Amendment to Reactive Power Rate 
Filing of NIPSCO to be effective 10/1/2018.
    Filed Date: 7/31/18.
    Accession Number: 20180731-5107.
    Comments Due: 5 p.m. ET 8/21/18.

    Docket Numbers: ER18-2110-000.
    Applicants: Buckeye Power, Inc., PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Revised SA No. 4753--NITSA 
among

[[Page 38299]]

PJM and Buckeye Power, Inc. to be effective 10/1/2018.
    Filed Date: 7/31/18.
    Accession Number: 20180731-5088.
    Comments Due: 5 p.m. ET 8/21/18.

    Docket Numbers: ER18-2111-000.
    Applicants: Midcontinent Independent System Operator, Inc., ITC 
Midwest LLC.
    Description: Sec.  205(d) Rate Filing: 2018-07-31_SA 3142 ITC 
Midwest-EDF Renewables E&P Agreement (J495) to be effective 9/30/2018.
    Filed Date: 7/31/18.
    Accession Number: 20180731-5111.
    Comments Due: 5 p.m. ET 8/21/18.

    Docket Numbers: ER18-2112-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2018-07-31_SA 3137 Entergy 
Arkansas-Cooperative Energy TSR CPA (F116) to be effective 6/28/2018.
    Filed Date: 7/31/18.
    Accession Number: 20180731-5141.
    Comments Due: 5 p.m. ET 8/21/18.

    Docket Numbers: ER18-2113-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2018-07-31_Revisions to 
Attachment O-MRES interest rate calculation language to be effective 8/
1/2018.
    Filed Date: 7/31/18.
    Accession Number: 20180731-5153.
    Comments Due: 5 p.m. ET 8/21/18.

    Docket Numbers: ER18-2114-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3215R4 People's Electric 
Cooperative NITSA NOA to be effective 7/1/2018.
    Filed Date: 7/31/18.
    Accession Number: 20180731-5176.
    Comments Due: 5 p.m. ET 8/21/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: July 31, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-16747 Filed 8-3-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.